| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.0 CrAccepted-AOC 15A 9 CHOWBHAGA ROAD KOLKATA KOLKATA 700039 | KOLKATA | WEST BENGAL | 700039 | ₹24.0 Cr Quoted ₹25.6 Cr | L1 | Accepted-AOC Lowest offer with acceptable rates. |
| 2 | L2₹27.5 Cr+₹2.0 Cr (7.72%)Rejected-Finance | ₹27.5 Cr+₹2.0 Cr (7.72%) | L2 | Rejected-Finance Not lowest. |
Tender Value
₹19.7 Cr
Closing Date
13 Oct 2021, 3:00 pmClosed
Project Director
Office of the Project Director, IRCON INTERNATIONAL LIMITED, Plot No. 1,7,2, Vaishnav Nagari, Near Ayyappa Temple, Atul, Parnera Road, Valsad, Gujarat 396007.
Balance work of Construction of bridges Major, Minor and RUBs from DFC Ch 151.000 to DFC Ch 162.900 in connection with construction of Western Dedicated Freight Corridor phase II Vaitarana Sachin section Package SS2 B IV Bridge Work.
2021_IRCON_90445_1
IRCON/3018/DFCCIL-CTP12/ eTender/SS2BIV/08-401
Limited
Civil Works - Bridges
Percentage
121 days
Dahanu
Please refer tender documents.
7 documents required · 7 mandatory
₹30,000
Yes
IRCON INTERNATIONAL LIMITED
Exempted
3 Jun 2022
6 Oct 2021
14 Oct 2021
6 Oct 2021
13 Oct 2021
7 Oct 2021
6 Oct 2021 - 7 Oct 2021
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SCHEDULE A - STRUCTURES (Minor, Major and RUB) | |||||
| 2Earthwork in excavation for foundation of minor & major bridges, minor & major RUB, retaining wall, toe wall, curtain wall, drop wall,drain etc including levelling the grade, ramming & compacting the bottom, trimming the sides, disposal of excess spoil off the site, filling the sides & compaction etc. all in complete as per technical specification, drawing and as directed by Engineer in Charge. The rate shall include all dewatering, planking, strutting, protection work etc. | |||||
| 2.1 | All types of soil (including rock not requiring blasting) | 17,324.07 | Cum | 120.77 | ₹20,92,227.93 |
| 2.2 | Hard rock (using control blasting method or other approved method) | 6,482.5 | Cum | 614.21 | ₹39,81,616.33 |
| 3 | 230/300 mm thick graded stone pitching in flooring , embankment slopes and bridge approaches etc including the cost of supply of all materials, labour, lead, lift, tools, plants, crossing of tracks and the like as per drawing and technical specification as directed by Engineer. | 928 | Cum | 1,591.9 | ₹14,77,283.2 |
| 4 | Grade M-15 lean concrete with 20 mm nominal size aggregate mechanically mixed and compacted by vibrator, with Contractor's own design of mix as approved by Engineer. The rate includes all leads,lifts, transportation, cost of materials, labour, taxes etc complete.Note: The rate includes cost of cement also and nothing extra on this account shall be payble. | 604 | Cum | 8,512.76 | ₹51,41,707.04 |
| 5 | Supplying, laying, compaction and curing of Cement Concrete Design Mix Grade M20 in retainig wall, toe wall, drain, drop wall, curtain wall etc including shuttering/formwork/scaffolding, all leads, transportation, cost of materials, labour, taxes etc complete as per drawings, technical specifications and as directed by Engineer in charge. Note: The rate includes cost of cement also and nothing extra on this account shall be payble. | 305 | Cum | 8,814.37 | ₹26,88,382.85 |
| 6 | Supplying, laying, compaction and curing of Cement Concrete Grade M25 PCC in Box culvert, Retaining wall, minor bridge,box RUB,Toe wall,wearing coat etc including shuttering/formwork/scaffolding, all leads, transportation, cost of materials, labour, taxes etc complete as per drawings, technical specifications and as directed by Engineer in charge. Note: The rate includes cost of cement also and nothing extra on this account shall be payble. | 729 | Cum | 9,714.59 | ₹70,81,936.11 |
| 7 | Supply, Laying, Compacting, Curing of Reinforced Cement Concrete (Grade M30) in retaining wall, RCC Box, RUB etc including shuttering/formwork/scaffolding, all leads, lifts, transportation, cost of materials, labour, taxes etc complete as per drawings, technical specifications and as directed by Engineer in charge. Note: (i) The cost of cutting, bending, tying the steel reinforcement shall be paid extra under relevant BOQ item, (ii) The rate includes cost of cement also and nothing extra on this account shall be payble. | 6,083 | Cum | 10,015.69 | ₹6,09,25,442.27 |
| 8 | Cutting, bending, placing and tying of steel reinforcement including all machinery, materials, binding wire,labours etc. at any level including all leads and lifts as per drawings and technical specifications. Full length rebar will be supplied by client at contractor depot free of cost | 1,692 | Ton | 11,027.66 | ₹1,86,58,800.72 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_98264.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
BOQ_98264.xls
BOQ Document • 0.32 MB
84877745.pdf
Tender Document • 0.49 MB
GCC16_02_2021.pdf
Tender Document • 17.61 MB
AttachmentClause44.2ofGCC032.pdf
Tender Document • 0.22 MB
Section7_SHE3.pdf
Tender Document • 2.67 MB
Section_8_Specifications.pdf
Tender Document • 35.55 MB
Section_9.pdf
Tender Document • 1.31 MB
AnnexureIX_Bid_security_Declaration.pdf
Tender Document • 0.25 MB
Appendix_5_PPR.pdf
Tender Document • 0.92 MB
Appendix_6_MPR.pdf
Tender Document • 3.72 MB
Fin_Bid.pdf
Tender Document • 0.41 MB
Tender_Acceptance_Letter.pdf
Tender Document • 0.08 MB
Technical_Bid.pdf
Tender Document • 1.65 MB
Section11_CAR_Policy.pdf
Tender Document • 4.50 MB
84877747.html
Tender Document • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .