Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.6 LAdmitted-Fee/PreQual/Technical/Finance | -32.37% | ₹5.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.5 L+₹86,013.86 (15.3%)Admitted-Fee/PreQual/Technical/Finance | -22.00% | ₹6.5 L+₹86,013.86 (15.3%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹8.3 L
EMD Value
₹16,580
Closing Date
29 Aug 2026, 2:00 pmClosed
Executive Engineer, FSC Narbal
Narbal
Construction of cement concrete wall on both sides of Tulbran Nallah at Village Nehama
2026_IFC_320171_3
e-NIT No. 13 of 2026-27 of FSC Narbal
Open Tender
Civil Works
Percentage
20 days
Narbal
Please refer Tender documents.
2 documents required · 2 mandatory
₹900
Yes
Chief Engineer Kmr I and FC Deptt.
₹16,580
Yes
21 Sept 2026
8 Aug 2026
31 Aug 2026
8 Aug 2026
29 Aug 2026
8 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechnical means over areas(exceeding 30cm in depth 1.5m in width as well as 10 sqm on plan)in all kinds of soil. | 146.79 | Cum | 187.3 | ₹27,493.77 |
| 2 | Dumping stone excluding cost of stones in Horizontal on level | 32.66 | Cum | 237.9 | ₹7,769.81 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 2.73 | cum | 5,202.9 | ₹14,203.92 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 88.2 | cum | 6,591.25 | ₹5,81,348.25 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for:
foundations,footings,base for columns | 252 | sqm | 286.35 | ₹72,160.2 |
| 6 | Supply of Stone boulder (nallah) nominal size 225 mm | 32.66 | Cum | 1,015 | ₹33,149.9 |
| 7 | P/F PVC pipes 3" dia incl. cutting incl. all modes of carriage complete Job. | 90 | m | 200 | ₹18,000 |
| 8 | Carriage of Material from available Sources to road site of work by Mechanical Transport including loading, unloading and stacking.
Stone soling for Avg. Lead of 15 Kms | 32.66 | Cum | 405.31 | ₹13,237.42 |
| 8.1 | Stone Aggregate 40mm nominal size for Avg. lead of 05 Kms. | 2.46 | Cum | 218.19 | ₹536.75 |
| 8.2 | Stone Aggregate 20mm nominal size for Avg. lead of 04 Kms. | 79.38 | Cum | 183.58 | ₹14,572.58 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_1063216.xls
BOQ • 0.31 MB
Corrigendum.pdf
PDF • 0.85 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .