| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC BEHIND A R D FILLING CENTRE GRAM AKBARPUR TEHSIL KHATOLI DISTRICT MUZAFFARNAGAR PREVIOUS ADDRESS GRAM GHASIPURA P O MANSURPUR DISTRICT MUZAFFARNAGAR UTTAR PRADESH PIN CODE 203001 | MUZAFFARNAGAR | MUZAFFARNAGAR | UTTAR PRADESH | 203001 | ₹1.7 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.7 CrRejected-Finance A 8 MISSION COMPOUND SADAR BAZAR DISTRICT SAHARANPUR UTTAR PRADESH | SAHARANPUR | SAHARANPUR | UTTAR PRADESH | ₹1.7 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹1.8 CrRejected-Finance GRAM ALIPUR MORNA TEHSIL MAWANA DISTRICT MEERUT UTTAR PRADESH 245001 | 245001 | ₹1.8 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹1.8 CrRejected-Finance | ₹1.8 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹1.9 CrRejected-Finance | ₹1.9 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/s Dinesh Contractor and Supplier L1 | NARESH KUMAR L3 | Durga Engineers and Earth Movers L10 | SHIVAM ENTERPRISES L8 | GANPATI CONSTRUCTIONS L2 | MAA GAYATRI ASSOCIATES L9 | SHRI SAI CONSTRUCTION L6 | Arvind Kumar L7 | ARUN KUMAR GUPTA L5 | J P INFRATECH L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation shoal (Wet) without water with disposal 3.0 km i/c all cost of material, labour and T&P etc. | 432 | CuM | 142.5 ₹61,560 | 150 ₹64,800 | 85 ₹36,720 | 176 ₹76,032 | 150 ₹64,800 | 160 ₹69,120 | 166 ₹71,712 | 100 ₹43,200 | 226 ₹97,632 | 150 ₹64,800 |
| 2.00 | Centering and Shuttering for C.C. block including all cost of material, labour and T&P complete. | 6,750 | SqM | 362 ₹24.4 L | 300 ₹20.3 L | 150 ₹10.1 L | 445 ₹30.0 L | 210 ₹14.2 L | 260 ₹17.6 L | 422 ₹28.5 L | 100 ₹6.8 L | 80 ₹5.4 L | 290 ₹19.6 L |
| 3.00 | Laying C.C. 1:2:4 {Aggregate (Single size) 10 to 40mm} with Plum for C.C. Blocks including all cost of material, labour and T&P complete. | 2,555 | CuM | 3,209 ₹82.0 L | 3,518.5 ₹89.9 L | 4,600 ₹1.2 Cr | 3,490 ₹89.2 L | 3,500 ₹89.4 L | 4,150 ₹1.1 Cr | 3,371 ₹86.1 L | 4,150 ₹1.1 Cr | 4,300 ₹1.1 Cr | 3,271 ₹83.6 L |
| 4.00 | Providing & Laying stone masonary in 1:4 cement mortar including all cost of material, labour and T&P complete | 131.6 | CuM | 2,695 ₹3.5 L | 3,300 ₹4.3 L | 4,350 ₹5.7 L | 3,340 ₹4.4 L | 3,000 ₹3.9 L | 3,400 ₹4.5 L | 3,144 ₹4.1 L | 4,000 ₹5.3 L | 4,278 ₹5.6 L | 3,250 ₹4.3 L |
| 5.00 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Concrete of M30 grade with minimum cement content of 350 kg /cum including all cost of material, labour and T&P complete. | 144 | CuM | 4,750.5 ₹6.8 L | 5,250 ₹7.6 L | 5,600 ₹8.1 L | 5,800 ₹8.4 L | 6,800 ₹9.8 L | 5,400 ₹7.8 L | 5,541 ₹8.0 L | 5,500 ₹7.9 L | 4,900 ₹7.1 L | 5,200 ₹7.5 L |
| 6.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.including all cost of material, labour and T&P complete. | 101.74 | Qtl | 5,305.5 ₹5.4 L | 5,800 ₹5.9 L | 6,600 ₹6.7 L | 6,300 ₹6.4 L | 7,500 ₹7.6 L | 7,000 ₹7.1 L | 6,127 ₹6.2 L | 6,000 ₹6.1 L | 7,000 ₹7.1 L | 5,960 ₹6.1 L |
| 7.00 | Bituminous Concrete Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.2 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete in all respects | 11.75 | CuM | 8,190 ₹96,232.50 | 7,100 ₹83,425 | 6,500 ₹76,375 | 8,240 ₹96,820 | 10,000 ₹1.2 L | 10,100 ₹1.2 L | 7,760 ₹91,180 | 9,000 ₹1.1 L | 10,562 ₹1.2 L | 8,200 ₹96,350 |
| 8.00 | Supply and laying of old / used Empty cement bags with filling of local earth/RBM/Silt, hand sewing with suja & sutli and placing in position within 60M royalty etc. complete. | 17,812.55 | No | 2 ₹35,625.10 | 12 ₹2.1 L | 24 ₹4.3 L | 13 ₹2.3 L | 10 ₹1.8 L | 2 ₹35,625.10 | 13 ₹2.3 L | 10 ₹1.8 L | 10 ₹1.8 L | 11.5 ₹2.0 L |
| 9.00 | Dry/Wet Shoal with shingle excavation for making bund for doing necessary job including all lift and lead upto 2Km. by power transport including all cost of labour and T&P etc complete. | 623.4 | CuM | 180 ₹1.1 L | 180 ₹1.1 L | 100 ₹62,340 | 210 ₹1.3 L | 200 ₹1.2 L | 210 ₹1.3 L | 198 ₹1.2 L | 100 ₹62,340 | 270 ₹1.7 L | 150 ₹93,510 |
| 10.00 | Supply & Laying 100cm dia Hume pipe i/c cariage from factory to work site i/c all cost of material, labour and T&P etc complete | 85 | RM | 3,090 ₹2.6 L | 3,040 ₹2.6 L | 3,000 ₹2.5 L | 3,450 ₹2.9 L | 4,000 ₹3.4 L | 3,200 ₹2.7 L | 3,243 ₹2.8 L | 4,000 ₹3.4 L | 4,114 ₹3.5 L | 3,200 ₹2.7 L |
Tender Value
₹2.7 Cr
EMD Value
₹5.3 L
Closing Date
30 Dec 2025, 2:00 pmClosed
SE GNSM Meerut
Office of SE GNSM Meerut
As per the NIT
2025_UPIDC_1101011_2
06/SE/2025-26
Open Tender
Civil Works
90 days
Haridwar
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,130
₹5.3 L
Office of SE GNSM Meerut
7 Apr 2026
23 Dec 2025
30 Dec 2025
23 Dec 2025
30 Dec 2025
23 Dec 2025
24 Dec 2025
Excavation shoal (Wet) without water with disposal 3.0 km i/c all cost of material, labour and T&P etc.
Centering and Shuttering for C.C. block including all cost of material, labour and T&P complete.
Laying C.C. 1:2:4 {Aggregate (Single size) 10 to 40mm} with Plum for C.C. Blocks including all cost of material, labour and T&P complete.
Providing & Laying stone masonary in 1:4 cement mortar including all cost of material, labour and T&P complete
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Concrete of M30 grade with minimum cement content of 350 kg /cum including all cost of material, labour and T&P complete.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.including all cost of material, labour and T&P complete.
Bituminous Concrete Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.2 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete in all respects
Supply and laying of old / used Empty cement bags with filling of local earth/RBM/Silt, hand sewing with suja & sutli and placing in position within 60M royalty etc. complete.
Dry/Wet Shoal with shingle excavation for making bund for doing necessary job including all lift and lead upto 2Km. by power transport including all cost of labour and T&P etc complete.
Supply & Laying 100cm dia Hume pipe i/c cariage from factory to work site i/c all cost of material, labour and T&P etc complete
Cement Pointing in1:2 CM or R.R stone masonary including all cost of material, labour and T&P etc. complete
Scraping old varnish and paints. including all cost of material, labour and T&P complete.
Painting 1st coat over priming coat (but excluding cost of priming coat) on steel and other metal surface including cleaning the surface of all dirt, dust and other foreign matter, sand papering and stopping including cost of materials labour Tools and Plants etc as required for proper completion of work. Paint shall be used as per standard I.S. specification. including all cost of material, labour and T&P complete.
Providing and applying 2 coats of water base cement paint to SQM unplastered concrete surface after Cleaning the surface of dirt, dust, oil, grease, efforescence and applying paint @ of 1 liter for 2 SQM including all cost of material, labour and T&P complete.
Providing & filling Boulder 20 to 40 Kg in scoured portion of launching apron i/c all cost of material, labour and T&P etc.
Providing & Laying R.B.M. including all cost of material, labour and T&P etc.
Dewatering including all cost of material, labour and T&P etc.
Removal of Bund after completion of work i/c lead upto 1.00 Km i/c all cost of material, labour and T&P etc. complete.
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Please Enable Macros to View BoQ information
stage.html
html • 0.07 MB
technical_2029136.pdf
techsummary_2029136.pdf
finance_2029136.pdf
BOQ Comparative Chart
xlsx
finsummary_2029136.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
BOQ_2029136.xls
BOQ • 0.27 MB
TDLOT2.pdf
Tender Documents • 1.48 MB
Download all tender documents and submit your bid