Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC CINAMA ROAD ANPARA P O ANPARA SONEBHADRA 231220 UTTAR PRADESH INDIA | SONBHADRA | UTTAR PRADESH | 231220 | ₹1.5 L Quoted ₹1.3 L | L1 | Accepted-AOC As per TCR |
| Sl No | Description | Qty | Unit | MANISH ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00 | Material Cost for GI Sheet , 50 Sq. Meter for each Dragline | 100 | Sq. Meter | 250 ₹25,000 |
| 2.00 | Material cost for Nut and Bolt M 10 X 75, 160 nos. for each Dragline | 320 | Nos | 17 ₹5,440 |
| 3.00 | Labour chage for subject work ( labour consist of 02 nos. skilled, 03 nos. Semiskilled and 04 nos. Unskilled manpower for a period of 12shiftdays i.e. 2 shift X 6 days) including contractor profit, for each dragline | 2 | Job | 36,530 ₹73,060 |
| 4.00 | Hiring Charges for 01 no grinder , 8 nos. Grinder stone/cutting wheel; for a period of 06 days for each dragline | 2 | Job | 2,000 ₹4,000 |
| 5.00 | Hiring of misc.tools and tackles like hammers, D-shackles, crow bars, spanner, Drill machine etc , for each job | 2 | Job | 10,000 ₹20,000 |
| 6.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - |
Updated dates
Tender Value
₹2.4 L
EMD Value
₹3,100
Closing Date
20 Oct 2025, 10:00 amClosed
M K Pandey
O/o AGM Bina Area, NCL District Sonebhadra U.P. Pincode @31220
Fabrication of galvanized iron cover Structures over various power cable trays of both 24/96 Saurav and Gaurav Dragline. (Work to be carried out at NCL site)
2025_NCL_344587_1
Bina/SO(Excv)/Tender/25-26/45 dt. 29.09.2025
Open Tender
Excavation Department Work
12 days
Onsite Job, Bina Project, NCL
As per NIT
5 documents required · 5 mandatory
₹3,100
21 Feb 2026
29 Sept 2025
21 Oct 2025
30 Sept 2025
20 Oct 2025
30 Sept 2025
30 Sept 2025 - 8 Oct 2025
Amount
Material Cost for GI Sheet , 50 Sq. Meter for each Dragline
Material cost for Nut and Bolt M 10 X 75, 160 nos. for each Dragline
Labour chage for subject work ( labour consist of 02 nos. skilled, 03 nos. Semiskilled and 04 nos. Unskilled manpower for a period of 12shiftdays i.e. 2 shift X 6 days) including contractor profit, for each dragline
Hiring Charges for 01 no grinder , 8 nos. Grinder stone/cutting wheel; for a period of 06 days for each dragline
Hiring of misc.tools and tackles like hammers, D-shackles, crow bars, spanner, Drill machine etc , for each job
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_357206.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.81 MB
ITB.pdf
Tender Documents • 0.26 MB
Conditionsofcontract.pdf
Tender Documents • 0.51 MB
Annexures.pdf
Tender Documents • 0.69 MB
BOQ_357206.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid