Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC CINAMA ROAD ANPARA P O ANPARA SONEBHADRA 231220 UTTAR PRADESH INDIA | SONBHADRA | UTTAR PRADESH | 231220 | L1 | Accepted-AOC As per TCR |
| Sl No | Description | Qty | Unit | MANISH ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00 | Material Cost for GI Sheet , 50 Sq. Meter for each Dragline | 100 | Sq. Meter | 250 ₹25,000 Lowest |
| 2.00 | Material cost for Nut and Bolt M 10 X 75, 160 nos. for each Dragline | 320 | Nos | 17 ₹5,440 Lowest |
| 3.00 | Labour chage for subject work ( labour consist of 02 nos. skilled, 03 nos. Semiskilled and 04 nos. Unskilled manpower for a period of 12shiftdays i.e. 2 shift X 6 days) including contractor profit, for each dragline | 2 | Job | 36,530 ₹73,060 Lowest |
| 4.00 | Hiring Charges for 01 no grinder , 8 nos. Grinder stone/cutting wheel; for a period of 06 days for each dragline | 2 | Job | 2,000 ₹4,000 Lowest |
| 5.00 | Hiring of misc.tools and tackles like hammers, D-shackles, crow bars, spanner, Drill machine etc , for each job | 2 | Job | 10,000 ₹20,000 Lowest |
| 6.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - |
Tender Value
₹2.4 L
EMD Value
₹3,100
Closing Date
20 Oct 2025, 10:00 amClosed
M K Pandey
O/o AGM Bina Area, NCL District Sonebhadra U.P. Pincode @31220
Fabrication of galvanized iron cover Structures over various power cable trays of both 24/96 Saurav and Gaurav Dragline. (Work to be carried out at NCL site)
2025_NCL_344587_1
Bina/SO(Excv)/Tender/25-26/45 dt. 29.09.2025
Open Tender
Excavation Department Work
Item Rate
12 days
Onsite Job, Bina Project, NCL
As per NIT
5 documents required · 5 mandatory
₹3,100
21 Feb 2026
29 Sept 2025
21 Oct 2025
30 Sept 2025
20 Oct 2025
30 Sept 2025
30 Sept 2025 - 8 Oct 2025
Amount
Material Cost for GI Sheet , 50 Sq. Meter for each Dragline
Material cost for Nut and Bolt M 10 X 75, 160 nos. for each Dragline
Labour chage for subject work ( labour consist of 02 nos. skilled, 03 nos. Semiskilled and 04 nos. Unskilled manpower for a period of 12shiftdays i.e. 2 shift X 6 days) including contractor profit, for each dragline
Hiring Charges for 01 no grinder , 8 nos. Grinder stone/cutting wheel; for a period of 06 days for each dragline
Hiring of misc.tools and tackles like hammers, D-shackles, crow bars, spanner, Drill machine etc , for each job
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_357206.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.81 MB
ITB.pdf
Tender Documents • 0.26 MB
Conditionsofcontract.pdf
Tender Documents • 0.51 MB
Annexures.pdf
Tender Documents • 0.69 MB
BOQ_357206.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .