Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.6 LAdmitted-Finance | -13.60% | ₹7.6 L | L1 | Admitted-Finance |
| 2 | L2₹8.0 LAdmitted-Finance | -8.55% | ₹8.0 L | L2 | Admitted-Finance |
Tender Value
₹8.8 L
EMD Value
₹17,500
Closing Date
27 Jan 2026, 11:00 amClosed
EE PWD DN Beawar
EE PWD DN Beawar
Repair and Maintainance work at SD Govt. College , Beawar
2026_CEPWD_529414_9
NIT No.16 2025-26
Open Tender
Civil Works
60 days
BEAWAR
As per Tender Documents
2 documents required · 2 mandatory
₹500
EE PWD DN Beawar
₹17,500
Yes
5 Feb 2026
21 Jan 2026
27 Jan 2026
21 Jan 2026
27 Jan 2026
21 Jan 2026
21 Jan 2026 - 27 Jan 2026
Dismantling stone slab roofing over wooden karries and battens (dismantling karries and battens to be paid for separately) including stacking of serviceable material and disposal of unserviceable material within 50 meter lead:
Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for : Suspended floors, roofs, landings, staircases, balconies girders cantilevers, bands, coping bed plates, anchor blocks,sills, chhajjas, lintel, beam, plinth beam etc
Stone slab roofing on ground floor with fine grained stone slab from approved quarry including filling of joints of parapet and slab on both sides in cement sand mortar 1:4, with ceiling pointing in cement sand mortar 1 : 3 complete as per specification and instruction of Engineer In ChargE.Add extra for subsequent story (20%)
Providing and laying cement concrete including curing, compaction etc. complete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, levelling course etc up to floor five level excluding the cost of centering and shuttering. M10 grade Nominal Mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size).
Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 10mm and down gauge) including finishing with cement mortar 1:3 (1 cement : 3 fine sand) as per standard design
Making khurras 450 x 450mm with average minimum thickness 50mm cement concrete 1 : 2:4 over P.V.C. Sheet 1 Mtr. x 1 Mtr. x 40micron finished with 12mm cement plaster 1 : 3 and one coat of neat cement, rounding edges and making and finishing the out let complete
Providing, Laying &Jointing R.C.C .class NP-2 Non-Pressure pipes (IS:458mark) of approved make with collars, jointed with C.M .1:2 or having Spigot and socket ends with flexible rubber rings joint including testing of joints etc. complete :100mm dia Internal
Repairs to plaster of thickness 12mm to 20mm in patches of area 2.5 sq. metres and under including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50 m lead With cement mortar 1 :4 ( 1 cement : 4 coarse sand)
Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying : Sqm. 372.00 (i) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. (ii) laying second layer of Fiber glass cloth when the first layer is still green . Overlaps of joints of fiber cloth should not be less than 10 cm . (iii) Third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proffing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30cm on parapet wall and tucked into groove in parapet all around (iv) fourth and final layer of brick tiling „with cement mortar or any other approved protective coarse. (which will be paid for separately) For the purpose of measurement the entire treated surface will be measured
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
TENDERDOCUMENTS.pdf
Tender Documents • 16.29 MB
NIT16.pdf
Tender Documents • 0.57 MB
BOQ_944604.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid