Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹15,500
Closing Date
20 Nov 2023, 2:00 pmClosed
EE, ECWD, SAHARANPUR
EE, ECWD, SAHARANPUR
1) Pole Installation work on 33 KV line Mandi Sameti Road 2) Increasing Capacity Substation Hushen Basti Saharanpur
2023_PVVNL_849626_3
33/ECWD/SRE/2023-24
Open Tender
Electrical Works
Lump-sum
45 days
SAHARANPUR
PLEASE REFER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹3,540
EE, ECWD, SAHARANPUR
₹15,500
1 Dec 2023
11 Nov 2023
20 Nov 2023
11 Nov 2023
20 Nov 2023
13 Nov 2023
11 Nov 2023 - 11 Nov 2023
1. Supply of following material G.I. Angle (65×65×6)mm
G.I. Channel (100×50)mm
G.I Wire No. 6 SWG
G.I Wire No. 8 SWG
M.S. Earthing Rod
V Type Cross Arm 33 KV
Cross Arm Holding clamp for PCC Pole 9 M + S.T. Pole 11 M long & 13M long
Guarding Clamp for S.T. Pole 11 M & 13M long
F Bracket for 33 KV
Danger Board with clamp for PCC Pole 9 M + S.T. Pole 11 M long & 13M long
Number Plate with clamp for PCC Pole 9 M + S.T. Pole 11 M long & 13M long
Aluminum Binding wire
Barbed wire
Read Oxide Paint
Aluminium paint
M.S. Bolts Nuts & Washers
Earth wire clamp with Nut & Bolts
Eye bolt
Concreting of support
Stone pad (300×300×75)mm
Turn Buckle
Guarding Angle 75×75×8
GI wire 16SWG for binding
Supply of Heat shrinkable Out door jointing kits suitable for 11KV, 3x300q.mm XLPE cable (Raychem / Dension or PVVNL Approved vender).
33 KV Line Isolator
2. Safe carriage of with loading & unloading at both ends respectively. (under jurisdiction of PVVNL) a) Steel Tublar Pole SP-72 13M (Bottom Portion Galvanized)
d) 33 KV Pin Isulators (Polymer)
e) ACSR Dog Conductor
f) 33/11 KV,10MVA Transformer
g) 11KV XLPE cable 3x300mm²
4. Dismantling of Existing ( 5 MVA-1 Nos) Transformer Kept at suitable place outside switchyard a) Disconnecting HT cable connection from 33KV side & 11KV side of 05MVA Power transformer for removing power transformer from plinth after proper shutdown. Dismantling of 11KV cable support structure, copper bus bar structure, M.S.Frame etc.
b) Disconnecting copper flexible/Earthing strip from Power transformer neutral & Dismantling neutral earthing system to facilitate removal of Power transformer from plinth.
c) Disconnecting Earthing strip from body of 05MVA Power transformer
d) Draining of transformer oil from conservator, radiators of existing 05 MVA T/F, at 33/11 KV S/S Hussen Basti (SRE) into the dry & clean drums and stacking at the safe place in Substation outside of switchyard. Empty drums shall be provided by contractor.
e) Removal of conservator, radiators and other accessories from existing 05 MVA Power transformer.
f) Safe Shifting of 05 MVA Power transformer main body and other accessories from the substation switchyard to outside the switchyard at suitable place assigned by concern J.E/S.D.O (Distribution).
g) Re-assembling of conservator, radiators and other accessories to existing 05 MVA Power transformer.
h) Re-filling the transformer oil (old & used in existing 5MVAT/F)
5 Miscellaneous Electrical works of Increasing Capacity of 33/11 KV Substation Hussen Basti (Saharanpur) (2×5) to (10+5) MVA. Installation of 33/11 KV, 10 MVA Transformer : a) Shifting of available 10 MVA 33/11 KV, Transformer to transformer plinth in Switch Yard.
b) Erection of shifted Transformer at plinth by fixing all accessories like radiators, conservator tank, filling the transformer oil to desired level and ensuring that there is no leakage, complete job in all respect.
6. Water level earthing by Boring and lowering of G.I. pipe size 40 mm dia & thickness 2mm into the ground at 20 Mtr depth or upto the water level with the lower end of solid copper cone Approx 225 mm long and 750 gm in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 SWG from the cone up to the ground surface where it will be bolted to the G.I. earth Strip for Transformer neutral connection, the earth strip will be welded to the G.I. pipe and neutral earthing support.
b) Fabrication and erection of neutral earthing L Type support made of M.S. Channel size 100x50mm. Structure shall be 4 Mtr. long with 1 Mtr. Arms and 0.75Mtr bracing. Structure shall be grouted in ratio 1:3:6 in block size 300x300x1000mm including plinth and painted with one coat of Ready Mixed primer and Two coat of enamel Aluminium paint work includes connecting neutral bushing rod of power Transformer and M.S. Earthing strip with the help of flexible copper bond, M.S. Bolt and washer with stone Pad of size (300x300x75mm).
7.ai) Fabrication and erection of cable support made of two pieces of M.S. Channel (100x50x6)mm, 2.75 meter long, joined to each other by means of 5 Nos. M.S. Angle (50x50x6) mm pieces of size 0.75Mtr long each by welding at equal intervals and grouting in a block of size (300x1000x1000)mm in C.C. 1:3:6 complete with one coat of ready mixed primer and two coats of Al. paint. Work includes providing of three Nos. M.S. clamps made of (50x6)mm M.S. Flat for holding the cable including nuts and bolts with stone Pad of size (300x300x75mm).
b) Fixing 110mm dia 2mm thick 2M long G.I.Pipe over 11KV, 3x300Sq.mm XLPE Cable before mounting the 2No. Cable on cable support structure. Work includes fixing of Clamp, sealing of top and bottom end of the G.I.Pipe. One end of G.I.Pipe is to be buried under earth about 500mm.
Fabrication of copper bus bar of size (2500×50×6)mm in L.V. side of 10 MVA 33/11 KV, power transformer. Work includes connection of outside bus bar in L.V. side busing rod of Power Transformer and other side with outdoor 11 KV cable box as well as providing empire tape and H.T. tape etc. for proper insulation work.
H.T. Power Cable Laying : i) Laying 11 KV, (3x300)/(3×185) mm2 XLPE Cable from power transformer to 11 KV incoming switch gear and 11 KV incoming switch gear to Double pole in the cable trench and 0.45 m wide, 0.90m depth. Providing 150 mm local sand for cushion beneath and 150 mm above the cable (quality of local sand required 0.375 cum/m in length). The cable shall be dully protected by brick. On both side of cable by laying brick vertically and bricks would also be laid bricks along the cable (minimum 18 Nos. of bricks are to be laid top and outer side along the single cable. The work includes digging of trenches, laying of cable in under ground trenches, joining of terminal's, back filling of earth and testing and commissioning of power cable etc. Spare cable shall be left over and laid in the trenches in shape of 6 m ring at both ends.
ii) Laying and dressing of 11 KV (3x300)/(3×185) mm2 power cable in air/Trench.
Preparation of 11 KV Power Cable ends: Making of cable end termination by Heat shrinkable Out door jointing kits suitable for 11KV, 3x300q.mm XLPE cable. Providing, fixing and crimping of proper size good quality lugs complete in all respect.
Making of cable end termination by Heat shrinkable indoor jointing kits suitable for 11KV, 3x300q.mm XLPE cable. Providing, fixing and crimping of proper size good quality lugs complete in all respect.
Installation of 33 KV Isolators with Structure: Assembling and installation of Line Isolator on the isolator structure. Adjusting of operating mechanism in proper alignment so as to ensure smooth operation of the same. In case of Line Isolator proper operation of earth links shall also be ensured. The work includes fabrication for proper fixing if required.
Erection of Following material A- Erection of support after excavation of foundation pit in mix soil/normal soil/soft & hard rock and its back filling and leveling etc. The size of the pit will be (900×600)mm and having depth of 1/6th of the full length of the support & Erection of support. The work includes carriage and handling of supports from site store to pit site. (i) 13 M Long STP, SP-72 Round Pole
B- Fixing of all clamps, Cross Bracing Sets 3.5 Mtr. from M.S. Angle 65×65×6mm/50×50×6mm & other accessories on the supports as per drawing. Work includes cutting of holes and providing M.S. Bolts of 16×40mm size in the middle of cross bracing with 1 no. spring washer. The work also includes carriage & handling of accessories from sectional store to pit site as well as any fabrication work if required. (i) Single Pole (a) 13 M Long STP, SP-72 Round Pole
Grouting of supports in CC 1:4:8 (Cement, sand & 40 mm brick ballast) Grouting will be done in the block of size (450×450)mm ×1/6th of full length of the support, up to ground level, 300 mm plinth above the ground level with C.C. 1:3:6 (Cement, Course sand and Stone grit) with muffing as per drawing, work includes back filling and proper ramming. (i) 13 M Long STP, SP-72 Round Pole
Earthing of supports with MS earth Rod of (20×2500)mm long including excavation of pit and driving M.S. Rod 3.0 M apart from support and 0.5m below the ground level and connecting below the earth electrodes with the help of G.I. wire no. 8 SWG and earthing lugs.
Guarding between two poles like single poles, double poles, four poles, etc. to guard LT, 33 KV Line telephone and river crossing, road crossing etc. with G.I. wire no. 6 SWG and G.I. wire no. 8 SWG, including cutting with fabrication and fixing of guarding channel with clamps nut & bolts etc. as per drawing.
Laying, spreading, lifting and final sagging of 3 phases of ACSR Dog conductor in accordance with profile and sag chart including binding, Jumpering and fixing of P.G. Clamp as per requirement in 03 Nos. conductor in parallel.
Providing & fixing of danger board at each location as per specification of the drawing with clamps etc.
Painting of following supports/structures with 2 coats of synthetic enamel paint after one coat of ready mix primer including cost of all material, as well as rubbing/cleaning of surface as required for proper completion of work. Painting will be done by post office red paint from top to cross arm and remaining by Aluminium paint. (a) 13 Mtr, SP-72 Poles including all channels/X-Arms/Clamps etc (i) Single supports
Wrapping of barbed wire on 33 KV PCC Poles/SP-55 ST & SP-72 ST Poles as anti-climbing device for a length of 0.9 Mtr., wire pitch/gap 13mm and fixing upper and lower end keeping lower end at a height of 2.75 Mtr. from the ground complete with supply and fixing of lower end & upper end clamps made of M.S. Flat 40×5mm complete with nuts & bolts & all other required material.
Numbering of each supports by preparing background with dark yellow paint in the size of 150mm dia and writing support number 100mm high with black paint.
Material required Locl store.(Site to Store Saharanpur)
Supply & Fixing of Stone Pad (300×300×75)mm
Power T/F Plinth Repair
Saraswati Electricals & Contractors
M/S KUMAR TRADERS KAKA NAGAR
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .