| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.0 CrAccepted-AOC | ₹42.0 Cr | L1 | Accepted-AOC Preparation Bond for Rs. 419703740.08 Only |
| 2 | L2₹47.5 CrRejected-Finance SRSC TOWER CP 1 105 PART C PHASE II RADHIKA VIHAR MATHURA 281001 | MATHURA | MATHURA | UTTAR PRADESH | 281001 | ₹47.5 Cr | L2 | Rejected-Finance Rejected due to higher Rates |
| 3 | L3₹47.6 CrRejected-Finance | ₹47.6 Cr | L3 | Rejected-Finance Rejected due to higher Rates |
| 4 | L4₹48.1 CrRejected-Finance | ₹48.1 Cr | L4 | Rejected-Finance Rejected due to higher Rates |
| 5 | L5₹48.4 CrRejected-Finance D 172 SAKET MEERUT DISTRICT MEERUT | MEERUT | MEERUT | UTTAR PRADESH | ₹48.4 Cr | L5 | Rejected-Finance Rejected due to higher Rates |
Tender Value
₹64.7 Cr
EMD Value
₹64.7 L
Closing Date
29 Jan 2025, 12:30 pmClosed
Superintending Engineer
Office Of The Superintending Engineer Agra Circle 198 Takkar Road Pwd Agra
Widending and Strenghtning work of Kosi-Goverdhan-Sonkh-Farah road SH-142 in District Mathura Change-49.620 to 85.240
2025_CEAGR_996455_1
6005/14M-AC/2024-25 dated 16-11-2024
Open Tender
Civil Works
450 days
Mathura
Widending and Strenghtning work
2 documents required · 2 mandatory
₹2,360
₹64.7 L
Yes
Agra
12 Mar 2025
22 Jan 2025
29 Jan 2025
23 Jan 2025
29 Jan 2025
23 Jan 2025
25 Jan 2025
Amount
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. As per MORT&H Specification No. 301 (3.6).
Construction of Embankment/Patri with approved material obtained from borrow pits all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. as per MoRT&H clause 305 (3.16) & as directed by Engineer Incharge including all machinery charges & including all labour, T&P etc required for proper completion of the work. (Carted Earth).
Providing, laying spreading & compacting of granular sub-base by providing coarse graded (Gr-1) materials, spreading in uniform layers with Motor Grader on prepared surface, mixing by mix in placed method with Rotovator at OMC and compacting with in layers with smooth wheeled Vibratory Roller to achieve the desired density, complete and including all machinery charges & including all labour, T&P etc required for proper completion of the work. as directed by Engineer Incharge. As per MoRT&H clause 401(b).
Providing, Laying and spreading Material on a prepared sub grade, adding cement @ 2% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub base.
Providing, Laying and spreading Material on a prepared sub base, cement @ 4% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base.
Providing, laying, Spreading & Compacting graded stone aggregate of approved quarry to wet mix macadam (WMM) specification including premixing the material with water at O.M.C. in machenical mix plant carriege of mixed material by tipper to site, lating in uniform layers with paver in sub-base/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density complete as per MoRT&H clause 406 & as directed by Engineer Incharge including all machinery charges & including all labour, T&P etc required for proper completion of the work as per MoRT&H Specification 406.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying with 1% OPC cement and 3.50% emulsion in Uniform single layer on sub base/subgrade and compacting with the road roller to achieve th desire density.
Providing & applying Tack Coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.25Kg./Sqm. on the prepared primed granular/old painted surface, cleaned with air compressor, including all Taxes, Material, Labour, T&P etc required for proper completion of the work. (For DBM).
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-40 @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
Providing & applying Tack Coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20Kg./Sqm. on the prepared primed granular/old painted surface, cleaned with air compressor, including all Taxes, Material, Labour, T&P etc required for proper completion of the work. (For Bitumenous Surface).
Providing and laying Bituminous Concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grade premixed with bituminous binder VG-40 @ 5.40% of mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with to the required grade, level and alignment, rolling with smooth Wheeled vibratory & Tandom Rollars to acheive the desired compaction as per MORT&H Specifications clause 509 Complete in all respects.
Providing and laying cement concrete in 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing complete, Including cost of form work. in Foundation and floors. As per S.I. No. 4.1.8
RCC work Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) Ch-5 SI No- 5.1.2
Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. As per S.I. No. 6.1.1
Supply & laying of Granular Material (6.7 mm guage stone grit) in bedding Complete as dwawing and technical specification.
Flush Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 coarse sand) :Raised and cut pointing. As per S.I. No 13.31.2
12mm Cement plaster with cement mortar in proportion of 1:4 cement & coarse sand of single coat for interior plastering upto floor two level including internal rounded angles chamfers, and rounded angles not exceeding 80mm. In girth and finished even and smooth. As per S.I. No. 13.4.1
Providing and laying cement concrete in 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete, Including cost of form work. In Foundation and floors. As per S.I. No. 4.1.3
Supply and laying & fixing of 350mm dia NP-3 Hume Pipe in proper alignment, joint filling and slopes etc. Complete as dwawing and technical specification.
Supply and laying & fixing of 600mm dia NP-3 Hume Pipe in proper alignment, joint filling and slopes etc. Complete as dwawing and technical specification.
Supply and laying & fixing of 1000mm dia NP-3 Hume Pipe in proper alignment, joint filling and slopes etc. Complete as dwawing and technical specification.
Coursed rubble masonry (first sort) with hard stone in foundation and plinth with Cement mortar 1:6 (1 cement : 6 coarse sand). As per S.I. No 7.6.1
Plain/Reinforced Cement Concrete (PCC Grade M15 ) in Open Foundation complete as per Drawing and Technical Specifications. As per MORT&H Specification No. 12.08
Sand Filling in Foundation Trenches as per Drawing & Technical Specification As per MORT&H Specification No. 12.03
Reinforced Cement Concrete (M-30) in Open Foundation complete as per Drawing and Technical Specifications. As per MORT&H Specification No. 12.08G CaseII
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation Sub structure/ super-structure complete as per Drawing and Technical Specifications. As per MORT&H Specification No. 12.42
Plain/Reinforced cement concrete (RCC M-30) in sub-structure complete as per drawing and Technical Specifications. As per MORT&H Specification No. 13.05.
Furnishing and Placing Reinforced/ Prestressed cement concrete (RCC M-30) in super-structure as per drawing and Technical Specification. As per MORT&H Specification No. 14.01C Case II
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications, all complete as per clause 2702 As per MORT&H Specification no. 14.04
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications As per MORT&H Specification no. 13.08
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
Drainage Spouts complete as per drawing and Technical specification As per MORT&H Specification no. 14.09
Providing and stacking of Sand filled E.C Bag at position including all labour T&P etc. for proper completion of work and as per direction of Engineer-in-charge.
Maintainance Charge including @ Earth Work, repair of painted surface,(Bituminous) Earth Work on patri, Drain, Culvert etc as per Direction of E/I for the period of Five Year from the actual completion of work. including royalty on materials. GST shall be paid extra as applicable at the time of payment.
Maintainance of First Year (@ 0.00% of Total Work Amount of 1 to 33)
Maintainance of Second Year (@0.25% of Total Work Amount of 1 to 33)
Maintainance of Third Year (@0.50% of Total Work Amount of 1 to 33)
Maintainance of Fourth Year (@0.75% of Total Work Amount of 1 to 33)
Maintainance of Fifth Year (@1% of Total Work Amount of 1 to 33)
Srsc Infra Private Limited (BID ID -4889420)
B.P.Construction (BID ID -4888954)
M/S R P INFRAVENTURE PRIVATE LIMITED (BID ID -4877169)
Preeti Buildcon Private Limited (BID ID -4882975)
M/S CHAUDHARY ASSOCIATES (BID ID -4891459)
SRS EXPRESS PRIVATE LIMITED (BID ID -4890154)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf