Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC | L1 | Accepted-AOC LOWEST/NEGOTIATED | |
| 2 | L2₹3.2 L+₹34,007 (11.9%)Rejected-Finance | L2 | Rejected-Finance 2ND LOWEST | |
| 3 | Rejected-Technical 0 GAURI PARGANA PURVI MATA MANDIR BIJNOR LUCKNOW UTTAR PRADESH 226008 | LUCKNOW | UTTAR PRADESH | 226008 | - | Rejected-Technical NOT QUALIFIED |
Tender Value
Refer Docs
EMD Value
₹3,000
Closing Date
21 Aug 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER
ELECTRICITY URBAN DISTRIBUTION CIRCLE, BUNGLOW NO.-9, OLD POWER HOUSE COLONY, RAILWAY STATION ROAD, GORAKHPUR
WORK AGAINST SACTIONED PACKAGE IN DEPOSIT SCHEME
2023_PVVNV_829690_1
20/EUDC(G)/2023-24
Open Tender
Electrical Works
Lump-sum
30 days
AREA OF EUDC GKP
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SUPERINTENDING ENGINEER EUDC
₹3,000
21 Nov 2023
16 Aug 2023
22 Aug 2023
16 Aug 2023
21 Aug 2023
16 Aug 2023
Amount
fo|qr uxjh; forj.k [k.M&prqFkZ xksj[kiqj ds vUrxZr tek ;kstuk esa Lohd`r iSdst la[;k 21@2023&24 ¼Jh lq/khj izrki flag] xaxkuxj dkyksuh] c’kkjriqj] xksj[kiqj gsrq fo|qrhdj.k dk dk;Z½ ds dk;ksZ dks lseh VuZdh ds vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k %&
Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :-
PCC Pole 8.5 mtr long
ABC LT Cable (3x95+1x70+1x16)
ACSR Weasel Conductor
Earthing Complete
Supply of following material/fitting complete in all respect :-
Distribution Box with Clamp (Distribution box shall be made from 20 SWG CRCA sheet by Deep Drown method with powder coating & size of box shall be 418 mm X 300mm X 120 mm (Roof of the box shall be tapered on both sides to drain the rain water)
Clamp for Distribution Box
Insulated dead end clamp with I hook
Insulated suspension clamp with I hook
LT Insulation piereing connector for line to line jumpering in ease of Tapping
Nuts & bolts
XLPE PVC Insulator 1x35 sq. mm cable for energizing D.b
LT Clamp for PCC
LT Shackle Insulator 100x115 mm
The excavation of 1 No foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of single Pole with fixing of necessary clamps & accessories (Top Channel, Dropper Angle etc.) as per required. All required materials such as Holding clamp/PCC clamp, Nuts & Bolts off size etc will be provided by the contractor. Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor). All work will be done as per RESPO Norms & relevent IS Specification.
Earthing of PCC Pole by MS earthing Rod & 6 SWG earthing Wire as per RESPO Norms.
Laying, stringing, sagging, binding and jumpering of ABC (3X95+1X70+1X16) Sq.mm. Cable of LT Line with fixing of Distribution Box with Clamp, Insulated Dead end clamp with I hook, Suspension clamp with I hook(Insulated), LT insulated Piercing connector, XLPE 1X35 Sq.mm. Al. cable for enerzing DB, XLPE 1X16 Sq.mm.
Laying, stringing, sagging, binding and jumpering of ACSR Weasel conductor for LT Line with fixing of LT Clamps/other clamps, Shackle insulator and nuts&bolts off size as per required.
fo|qr uxjh; forj.k [k.M&izFke xksj[kiqj ds vUrxZr tek ;kstuk esa Lohd`r iSdst la[;k 32@2023&24 ¼Jh fot; ukFk ;kno] yglM+h] xksj[kiqj ds [ksr ds mij ls xqtj jgs 11 ds0oh0 jkex<+ QhMj dks vU;= f’k¶V djus dk dk;Z½ ds dk;ksZ dks lseh VuZdh ds vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k %&
Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :-
PCC Pole 8.5 mtr long
11 KV Pin Insulator with pin
11 KV Disc insulator with fitting
ACSR Weasel conductor
Earthing complete
11 KV X-Arm
11 KV T Off Chanel
Stay set complete
11 KV F bracket
Supply of following material/fitting complete in all respect :-
Holding Clamp with nuts & bolts
Nuts & bolts of different sizes
The excavation of 1 No foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of single Pole with fixing of necessary clamps & accessories (Top Channel, Dropper Angle etc.) as per required. All required materials such as Holding clamp/PCC clamp, Nuts & Bolts off size etc will be provided by the contractor. Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor). In case of STP Pole Making plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that No rainwater gets accumulated on the top. All work will be done as per RESPO Norms & relevent IS Specification.
Laying, stringing, sagging, binding and jumpering of ACSR Weasel conductor for HT Line with fixing of HT Clamps/other clamps and nuts&bolts off size as per required.
Erection and grouting of stay in CC ratio 1:4:8 of Cement, Sand and Stone Ballast including cost of grouting material with nozelling and binding of stay wire (Complete work)
Earthing of ST Pole by MS earthing Rod & 6 SWG earthing Wire as per RESPO Norms.
Dismantling of Line materials and safe loading, unloading and carraige of dismantled material from work site to departmental store (As per site requirement)
fo|qr uxjh; forj.k [k.M&f}rh; xksj[kiqj ds vUrxZr tek ;kstuk esa Lohd`r iSdst la[;k 34@2023&24 ¼okMZ ua0 60 :Lreiqj esa iwoZ ik”kZn vkokl ds ihNs cM+k xgjk uydwi ds 15 fd0ok0 ds fo|qrhdj.k dk dk;ZZ½ ds dk;ksZ dks lseh VuZdh ds vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k %&
Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :-
25 KVA Transformer 11/.4 KVA
ST Pole 11 mtr long
11 KV Top Channel
11 KV Droper Angle
11 KV Substation Base Angle
11 KV Pin with pin
11 KV Pin Insulator
11 KV Disc insulator
11 KV Disc Fitting
Guarding Angle
ACSR Weasel conductor
11 KV TPMO with polymeric insulator
Stay set complete with 5 kg wire
Earthing complete
LT PVC Cable 4*25sq.mm
X-Arm M.S Angle 65X65X6 mm V Type
MS T-Off with bolt & nuts
F-BRACKET
Supply of following material/fitting complete in all respect :-
Clamp for Top, dropper angle etc with nuts & bolts
Nuts & bolts of different sizes
AI Lugs
GI Wire for Guarding (6mm)
The excavation of 2 No foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of double Pole with fixing of necessary clamps & accessories (Top Channel, Dropper Angle etc.) as per required. All required materials such as Holding clamp/STP clamp, Nuts & Bolts off size etc will be provided by the contractor. Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor). Making plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that No rainwater gets accumulated on the top. All work will be done as per RESPO Norms & relevent IS Specification.
The excavation of 1 No foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of single Pole with fixing of necessary clamps & accessories (Top Channel, Dropper Angle etc.) as per required. All required materials such as Holding clamp/STP clamp, Nuts & Bolts off size etc will be provided by the contractor. Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor). Making plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that No rainwater gets accumulated on the top. All work will be done as per RESPO Norms & relevent IS Specification.
Painting of Pole by double coating Aluminum & Red oxide paint. Paint will be provided by contractor
Earthing of ST Pole by MS earthing Rod & 6 SWG earthing Wire as per RESPO Norms.
Laying, stringing, sagging, binding and jumpering of ACSR Weasel conductor for LT/HT Line with fixing of V cross arm, F-Bracket &other clamps and nuts&bolts off size as per required.
Erection and grouting of stay in CC ratio 1:4:8 of Cement, Sand and Stone Ballast including cost of grouting material with nozelling and binding of stay wire (Complete work)
Fabrication, errection, commissioning & Testing of 25 KVA T/F on Double Pole with all accessories including make its LT and HT connection. All necessary materials such as Holding clamp, Al.Lugs (Confirming to IS 8309), Z Clamp, Nuts & Bolts will be supplied by the Contractor.
Erection of TPMO
Chemical earthing of Transformer (Body/Neutral) as per IS Code 3043 - 1987 specification (Materials will be provided by contractor)
Guarding of HT Lines including fixing of Guarding angle & G.I. wire (6 mm)
fo|qr uxjh; forj.k [k.M&prqFkZ xksj[kiqj ds vUrxZr tek ;kstuk esa Lohd`r iSdst la[;k 35@2023&24 ¼jkIrhuxj Qst&1] ikuh Vadh ds uhps jkIrhuxj] xksj[kiqj esa xgjs uydwi ds 15 fd0ok0 ds fo|qrhdj.k dk dk;Z½ ds dk;ksZ dks lseh VuZdh ds vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k %&
Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :-
25 KVA Transformer
ST Pole 11 mtr long
ACSR Weasel Conductor
MS Angle (Dropper) 100X50X2028 mm
11 KV Pin Insulator
11 KV Pin with Nut
11 KV Dise Insulator
11 KV Dise Fitting
11 KV Fuse set
MS Top Channel (125x65x2240)mm
MS Angle 75X75X6X2028 mm eith clamp & bolts & nut ( T/F base)
Earthing Complete
T-off Channel
Stay complete (stay rod 16X1800 mm stay wire 5 kg stay clamp bolt & nuts)
LT PVC Cable 3.5X35 sq.mm
Supply of following material/fitting complete in all respect :-
Holding Clamp for Top, dropper channel fuse set etc with nuts & bolts
Nuts & bolts of different sizes
Cu Z Clamp
Al Lugs
The excavation of 2 No foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of double Pole with fixing of necessary clamps & accessories (Top Channel, Dropper Angle etc.) as per required. All required materials such as Holding clamp/STP clamp, Nuts & Bolts off size etc will be provided by the contractor. Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor). Making plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that No rainwater gets accumulated on the top. All work will be done as per RESPO Norms & relevent IS Specification.
Painting of Pole by double coating Aluminum & Red oxide paint. Paint will be provided by contractor
Earthing of ST Pole by MS earthing Rod & 6 SWG earthing Wire as per RESPO Norms.
Laying, stringing, sagging, binding and jumpering of ACSR Weasel conductor for LT/HT Line with fixing of LT Clamps/other clamps, Shackle insulator and nuts&bolts off size as per required.
Fabrication, errection, commissioning & Testing of 25 KVA T/F on Double Pole with all accessories including make its LT and HT connection. All necessary materials such as Holding clamp, Al.Lugs (Confirming to IS 8309), Z Clamp, Nuts & Bolts will be supplied by the Contractor.
Erection of Fuse set
Chemical earthing of Transformer (Body/Neutral) as per IS Code 3043 - 1987 specification (Materials will be provided by contractor)
fo|qr uxjh; forj.k [k.M&prqFkZ xksj[kiqj ds vUrxZr tek ;kstuk esa Lohd`r iSdst la[;k 36@2023&24 ¼‘kfDruxj f’kokiqje dkyksuh] ‘kkgiqj] xksj[kiqj esa xgjs uydwi ds 15 fd0ok0 ds fo|qrhdj.k dk dk;Z½ ds dk;ksZ dks lseh VuZdh ds vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k %&
Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :-
25 KVA Transformer
ST Pole 11 mtr long
ACSR Weasel Conductor
MS Angle (Dropper) 100X50X2028 mm
11 KV Pin Insulator
11 KV Pin with Nut
11 KV Disc Insulator
11 KV Disc Fitting
11 KV Fuse set
MS Top Channel (125x65x2240)mm
MS Angle 75X75X6X2028 mm eith clamp & bolts & nut ( T/F base)
Earthing Complete
T-off Channel
LT PVC Cable 3.5X35 sq.mm
Supply of following material/fitting complete in all respect :-
Holding Clamp for Top, dropper channel, Fuse set etc with nuts & bolts
Nuts & bolts of different sizes
Cu Z Clamp
Al Lugs
The excavation of 2 No foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of double Pole with fixing of necessary clamps & accessories (Top Channel, Dropper Angle etc.) as per required. All required materials such as Holding clamp/STP clamp, Nuts & Bolts off size etc will be provided by the contractor. Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor). Making plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that No rainwater gets accumulated on the top. All work will be done as per RESPO Norms & relevent IS Specification.
Painting of Pole by double coating Aluminum & Red oxide paint. Paint will be provided by contractor
Earthing of ST Pole by MS earthing Rod & 6 SWG earthing Wire as per RESPO Norms.
Laying, stringing, sagging, binding and jumpering of ACSR Weasel conductor for LT/HT Line with fixing of LT Clamps/other clamps, Shackle insulator and nuts&bolts off size as per required.
Fabrication, errection, commissioning & Testing of 25 KVA T/F on Double Pole with all accessories including make its LT and HT connection. All necessary materials such as Holding clamp, Al.Lugs (Confirming to IS 8309), Z Clamp, Nuts & Bolts will be supplied by the Contractor.
Erection of Fuse set
Chemical earthing of Transformer (Body/Neutral) as per IS Code 3043 - 1987 specification (Materials will be provided by contractor)
fo|qr uxjh; forj.k [k.M&prqFkZ xksj[kiqj ds vUrxZr tek ;kstuk esa Lohd`r iSdst la[;k 38@2023&24 ¼Jh uouhr dqekj] 1442] egknsoiqje~] HkSjkiqj] xksj[kiqj }kjk vkosfnr fo|qr la;kstu gsrq ,y0Vh0 ykbu ds fuekZ.k dk dk;Z½ ds dk;ksZ dks lseh VuZdh ds vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k %&
Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :-
ACSR Weasel Conductor
PCC Pole 8.5 mtr
Supply of following material/fitting complete in all respect :-
Shackle insulator
LT clamp
Nuts & bolts
The excavation of 2 No foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of double Pole with fixing of necessary clamps & accessories (Top Channel, Dropper Angle etc.) as per required. All required materials such as Holding clamp/PCC clamp, Nuts & Bolts off size etc will be provided by the contractor. Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor). All work will be done as per RESPO Norms & relevent IS Specification.
Laying, stringing, sagging, binding and jumpering of ACSR Weasel conductor for LT Line with fixing of LT Clamps/other clamps, Shackle insulator and nuts&bolts off size as per required.
fo|qr uxjh; forj.k [k.M&prqFkZ xksj[kiqj ds vUrxZr tek ;kstuk esa Lohd`r iSdst la[;k 47@2023&24 ¼okMZ ua0 43] jkeizhr pkSjkgk] dkyh efUnj] xksj[kiqj esa feuh uydwi gsrq fo|qrhdj.k dk dk;Z½ ds dk;ksZ dks lseh VuZdh ds vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k %&
Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :-
PCC Pole 8.5 mtr. Long
ABC LT Cable (3x95+1x70+1x16)
Stay complete
11 KV Cable 3.5X35 sq mm
Earthing Complete
Supply of following material/fitting complete in all respect :-
Distribution box
Clamp for Distribution Box
Insulated dead end clamp with I hook
Insulated suspension clamp with I hook
LT Insulation piereing connector for line to line jumpering in ease of Tapping
Nuts & bolts
XLPE PVC Insulator 1x35 sq. mm cable for energizing D.B
LT Clamp for PCC
LT Shackle Insulator 100x115 mm
The excavation of 1 No foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of single Pole with fixing of necessary clamps & accessories (Top Channel, Dropper Angle etc.) as per required. All required materials such as Holding clamp/PCC clamp, Nuts & Bolts off size etc will be provided by the contractor. Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor). All work will be done as per RESPO Norms & relevent IS Specification.
Earthing of PCC Pole by MS earthing Rod & 6 SWG earthing Wire as per RESPO Norms.
Laying, stringing, sagging, binding and jumpering of ABC (3X95+1X70+1X16) Sq.mm. Cable of LT Line with fixing of Distribution Box with Clamp, Insulated Dead end clamp with I hook, Suspension clamp with I hook(Insulated), LT insulated Piercing connector, XLPE 1X35 Sq.mm. Al. cable for enerzing DB, XLPE 1X16 Sq.mm.
Erection and grouting of stay in CC ratio 1:4:8 of Cement, Sand and Stone Ballast including cost of grouting material with nozelling and binding of stay wire (Complete work)
fo|qr uxjh; forj.k [k.M&prqFkZ xksj[kiqj ds vUrxZr tek ;kstuk esa Lohd`r iSdst la[;k 48@2023&24 ¼okMZ ua0 29] yksfg;k uxj] jkIrhuxj xksj[kiqj esa feuh uydwi ds la;kstu gsrq fo|qrhdj.k dk dk;Z½ ds dk;ksZ dks lseh VuZdh ds vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k %&
Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :-
25 KVA Transformer
PCC Pole 8.5 mtr. Long
11 KV Cross arm
MS Top Channel (125x65x2240)mm
MS angle (Dropper) 100X50X2028 mm
MS angle 75X75X6X2028 mm With clamp & bolts & nut (T/F base)
11 KV Pin Insulator with Pin
11 KV Dise Insulator with fitting
ACSR Weasel Conductor
11 KV Fuse set
Stay complete (stay rod 16X1800 mm stay wire 5 kg stay clamp bolt & nuts)
Earthing Complete
LT PVC Cable 3.5X35 sq.mm
11 KV T-off Channel
Supply of following material/fitting complete in all respect :-
Holding Clamp for Top, dropper channel fuse set etc with nuts & bolts
Nuts & bolts of different sizes
AI Lugs
The excavation of 2 No foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of double Pole with fixing of necessary clamps & accessories (Top Channel, Dropper Angle etc.) as per required. All required materials such as Holding clamp/PCC clamp, Nuts & Bolts off size etc will be provided by the contractor. Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor). Making plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that No rainwater gets accumulated on the top. All work will be done as per RESPO Norms & relevent IS Specification.
The excavation of 1 No foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of single Pole with fixing of necessary clamps & accessories (Top Channel, Dropper Angle etc.) as per required. All required materials such as Holding clamp/STP clamp, Nuts & Bolts off size etc will be provided by the contractor. Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor). Making plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that No rainwater gets accumulated on the top. All work will be done as per RESPO Norms & relevent IS Specification.
Earthing of PCC Pole by MS earthing Rod & 6 SWG earthing Wire as per RESPO Norms.
Laying, stringing, sagging, binding and jumpering of ACSR Weasel conductor for HT Line with fixing of V cross arm, T-off channel, other clamps and nuts&bolts off size as per required.
Erection and grouting of stay in CC ratio 1:4:8 of Cement, Sand and Stone Ballast including cost of grouting material with nozelling and binding of stay wire (Complete work)
Fabrication, errection, commissioning & Testing of 25 KVA T/F on Double Pole with all accessories including make its LT and HT connection. All necessary materials such as Holding clamp, Al.Lugs (Confirming to IS 8309), Z Clamp, Nuts & Bolts will be supplied by the Contractor.
Erection of Fuse Set
Chemical earthing of Transformer (Body/Neutral) as per IS Code 3043 - 1987 specification (Materials will be provided by contractor)
J S B INFRA
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .