Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.6 L+₹16,932.13 (3.82%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | R THAVAMANI | MANSOOR |
|---|---|---|---|---|---|
| 1.00 | Providing two legged scaffolding for works upto 3m heights, using 13 to 15 cm dia casuarina props, the distance between the two rows are being 1.25m and the spacing of posts being 2m. in both the rows with horizontal posts with 0.50m overlap on either side and braces at 2m c/c including longitudinal and transverse middle braces to stepup and providing a platform with country wood planks of 40mm thick and 1m width etc., including cost of all materials, labours, lead, lift, safety measures, etc.complete. | 64.8 | M2 | 31,652.21 ₹37,349.61 Lowest | 33,048 ₹38,996.64 |
| 2.00 | Dismantling the existing damaged RCC for the required width & depth as per the instructions of engineer incharge and disposing the debris 1km away from the site including cost of all materials, labours, lead, lift, curing, etc. complete. | 5.1 | M3 | 22,323.67 ₹26,341.93 Lowest | 23,460 ₹27,682.8 |
| 3.00 | Chipping the existing concrete and roughening the surface for future bonding and through cleaning the surface including cost of all materials, labours, lead, lift, curing, etc. complete. | 33.6 | M2 | 1,358.45 ₹1,602.97 Lowest | 1,512 ₹1,784.16 |
| 4.00 | Clean removal of cracked cement plaster from walls including cost of all materials, labour, lead, lift, curing, etc., complete. | 15.01 | M2 | 127.74 ₹150.73 Lowest | 180.12 ₹212.54 |
| 5.00 | Dismantling the damaged Terrace tiles and disposed away from the site as directed by the engineer incharge including cost of labour, Lead lift, T&P, etc., complete. | 38.4 | M2 | 1,770.24 ₹2,088.88 Lowest | 2,112 ₹2,492.16 |
| 6.00 | Dismantling the existing doors & windows including removal of frames, hinges & fastenings, including cost of all materials, labours, lead, devolution to stores, etc. complete. | 5.4 | M2 | 831.22 ₹980.84 Lowest | 1,161 ₹1,369.98 |
| 7.00 | Dismantling of existing brick wall including cost of materials, labours and cleaning away from the work spot lead lift, curing, etc. complete. | 3.4 | M3 | 1,164.53 ₹1,374.15 Lowest | 1,275 ₹1,504.5 |
| 8.00 | Providing centering and shuttering using steel structures & props 10 to 13cm dia, including cost of all materials, labours, lead, lift, etc. complete. | 43.75 | M2 | 43,259.56 ₹51,046.28 Lowest | 45,937.5 ₹54,206.25 |
| 9.00 | Providing RCC 1:11/2:3 using OP/PP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work. | 5.55 | M3 | 52,489.51 ₹61,937.62 Lowest | 56,055 ₹66,144.9 |
| 10.00 | Supplying & providing RTS/MS rod including cutting, bending, tying and fixing in position as per specification including binding wires, cost of all materials, labours, lead, lift, etc. complete. | 444 | Kg | 42,193.32 ₹49,788.12 Lowest | 43,512 ₹51,344.16 |
Tender Value
Refer Docs
EMD Value
₹4,700
Closing Date
6 May 2025, 2:00 pmClosed
Chief Engineer TTPS TTN 4
Office of the SE Civil TTPS TTN 4
Repair and Renovation Works to the Milk House, Cable Room and Telephone Exchange Buildings at Analmin Nagar
2025_EB_546608_1
CE SE C TTPS Spec. No 72 25 26
Open Tender
Civil Works - Others
Item Rate
60 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,700
Yes
1 Nov 2025
16 Apr 2025
7 May 2025
16 Apr 2025
6 May 2025
16 Apr 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .