Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.5 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹3.9 L+₹1.4 L (55.6%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹4.0 L+₹1.5 L (60.3%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹4.2 L+₹1.7 L (66.7%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-expired contractor card |
Tender Value
₹4 L
EMD Value
₹8,000
Closing Date
24 Sept 2026, 6:00 pmClosed
XEN REW JAMMU
XEN REW JAMMU
Constt. of Lane from Transformer to h/o Subash Singh, Drain from Raj Kumar house to Sushil Mehra Pyt Kot Lower A Garhi Morh Block Bhalwal scheme CDF YEAR 2026-27
2026_RDPR_324993_1
e-NIT No. 604 REW J of 2026-27 dated 17-09-2026
Open Tender
Civil Works
Percentage
45 days
XEN REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH 0515
₹8,000
19 Oct 2026
17 Sept 2026
25 Sept 2026
17 Sept 2026
24 Sept 2026
17 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site clearance labour engaged for prepration of site and removal of unhygenic material | 2 | no. | 553 | ₹1,106 |
| 2 | Earthwork in excavation by mechanical means in trenches for foundations,drains,pipes,cables etc(not exceeding 1.5m in width)including dressing of sides and ramming of bottom lifts upto 1.5m inc.getting out excavated earth and disposal of surplus excavated earth as directed:in all kinds of soil | 80.8 | cum | 256.85 | ₹20,753.48 |
| 3 | Providing and laying in position of cement concrete of specified grade excluding the cost of centring and shuttering - all work upto plinth level. 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregates 40 mm nominal size) | 5.23 | cum | 4,826.5 | ₹25,242.6 |
| 4 | Providing and laying in position of cement concrete of specified grade excluding the cost of centring and shuttering - all work upto plinth level. 1:3:6(1 cement : 5 coarse sand : 10 graded stone aggregates 20mm nominal size) | 22.7 | cum | 5,733.6 | ₹1,30,152.72 |
| 5 | Centering and shuttering including strutting,propping etc and removal of formFoundations,footings,bases of columns etc.for mass concrete | 155 | sqm | 286.35 | ₹44,384.25 |
| 6 | supply of stone | 9.77 | cum | 700 | ₹6,839 |
| 7 | P/L RBM (River bed material) including supply carriage and laying all job complete | 360 | cum | 425 | ₹1,53,000 |
| 8 | Carriage of sand and Agg 10 Km by MT | 37.5 | cum | 344.49 | ₹12,918.38 |
| 9 | carriage of stone by avg mt lead of 7 kms | 9.77 | cum | 273 | ₹2,667.21 |
| 10 | ADD SIGN BOARD | 1 | no. | 3,000 | ₹3,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
BOQ_1097050.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .