| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 CrAdmitted-Finance | ₹4.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.0 Cr+₹49.9 L (11.1%)Admitted-Finance | ₹5.0 Cr+₹49.9 L (11.1%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Tax exemption/declaration of no objection not submitted |
| 4 | Rejected-Technical | - | - | Rejected-Technical EMD not submitted |
| 5 | Rejected-Technical | - | - | Rejected-Technical Declaration of bidders not submitted, Non litigation/police varification Certificate not Submitted. |
| Sl No | Description | Qty | Unit | M/S D H ENTERPRISE L1 | M/s G T Enterprises L2 |
|---|---|---|---|---|---|
| 1.001. SH: Community hall at Leneriang village | |||||
| 2.00Earth work in excavation over area i/c disposal of excavated earth lead up to 50m and lift up to 1.5m and disposed soil to be levelled and neatly | |||||
| 3.00 | a) Hard Soil - 40 % | 6,081.6 | Cum | 25 ₹1,52,040 Lowest | 31.5 ₹1,91,570.4 |
| 4.00 | b) Hard Soil - 60 % | 9,122.4 | Cum | 35 ₹3,19,284 Lowest | 43 ₹3,92,263.2 |
| 5.00 | Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m. | 98.42 | Cum | 279.48 ₹27,506.42 Lowest | 379.48 ₹37,348.42 |
| 6.00 | Providing and laying in foundations and plinth cement concrete 1 : 5 : 10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. | 27.52 | Cum | 5,549.01 ₹1,52,708.76 Lowest | 5,851.01 ₹1,61,019.8 |
| 7.00 | Reinforcement of RCC work including bending, binding and placing in position complete.a) Mild steel. | 3,030.85 | Kg | 97.06 ₹2,94,174.3 Lowest | 117.07 ₹3,54,821.61 |
| 8.00Centring and shuttering including strutting proping etc. and removal of form work for: | |||||
| 9.00 | a) Foundations and plinth. | 112.33 | Sqm | 498.2 ₹55,962.81 Lowest | 507.19 ₹56,972.65 |
| 10.00 | c) Columns, pillars and piers. | 141.12 | Sqm | 801.9 ₹1,13,164.13 Lowest | 878.81 ₹1,24,017.67 |
Tender Value
₹5.0 Cr
EMD Value
₹5.0 L
Closing Date
3 Apr 2026, 4:00 pmClosed
Block development Officer Parsi Parlo
Block Development Officer CD Block Parsi Parlo Kurung Kumey District, Arunachal Pradesh.
C/o Community Hall under VVP Scheme under Parsi Parlo CD Block
2026_DRDAP_3345_1
PP/VVP/NIT/2026-27/01
Open Tender
Civil Works
Item Rate
365 days
Parsi Parlo
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
BDO, CD Block, Parsi Parlo, RD, Parsi Parlo
₹5.0 L
Yes
18 Jun 2026
27 Mar 2026
6 Apr 2026
27 Mar 2026
3 Apr 2026
27 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 11. SH: Community hall at Leneriang village | |||||
| 2Earth work in excavation over area i/c disposal of excavated earth lead up to 50m and lift up to 1.5m and disposed soil to be levelled and neatly | |||||
| 3 | a) Hard Soil - 40 % | 6,081.6 | Cum | - | - |
| 4 | b) Hard Soil - 60 % | 9,122.4 | Cum | - | - |
| 5Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m. | |||||
| 6Providing and laying in foundations and plinth cement concrete 1 : 5 : 10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. | |||||
| 7Reinforcement of RCC work including bending, binding and placing in position complete.a) Mild steel. | |||||
| 8Centring and shuttering including strutting proping etc. and removal of form work for: | |||||
| 9a) Foundations and plinth. | |||||
| 10c) Columns, pillars and piers. | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_3541.xls
BOQ • 0.53 MB
Tenderdocuments.pdf
Tender Documents • 1.52 MB
TenderNotice.pdf
PDF • 0.11 MB
Communitydate.pdf
PDF • 0.10 MB
communityHallsbd.pdf
PDF • 0.12 MB
Corrigendum-II.pdf
PDF • 0.07 MB
ExtensionCorrigendum.pdf
PDF • 0.09 MB
Corrigendum-I.pdf
PDF • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .