Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹38.7 LAdmitted-Fee/PreQual/Technical/Finance | -20.00% | ₹38.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹43.0 L+₹4.3 L (11.2%)Admitted-Fee/PreQual/Technical/Finance 1 3604 RAM NAGAR GALI NO 2 POST OFFICE WALI ASHOK MARG EAST DELHI DELHI 110032 | SHAHDARA | DELHI | 110032 | -11.01% | ₹43.0 L+₹4.3 L (11.2%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹45.6 L+₹6.9 L (17.7%)Admitted-Fee/PreQual/Technical/Finance | -5.81% | ₹45.6 L+₹6.9 L (17.7%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹47.1 L+₹8.4 L (21.7%)Admitted-Fee/PreQual/Technical/Finance GRAM SABANO PO SIMARIA | -2.61% | ₹47.1 L+₹8.4 L (21.7%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹48.4 L
EMD Value
₹96,800
Closing Date
19 Aug 2026, 5:00 pmClosed
EE RDSD CHATRA
RDSD CHATRA
Construction of Culvert and PCC Road from Rohmar Bridge to H/O Ugal Yadav in Village-Rohmar, Panchayat-Pahra, Block-Gidhour, District-Chatra.
2026_RDSPL_117213_1
RDD/SD/CHATRA/20/2026-27/Gr_3
Open Tender
Civil Works
Percentage
90 days
CHATRA
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹96,800
21 Aug 2026
10 Aug 2026
21 Aug 2026
10 Aug 2026
19 Aug 2026
10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing Grass and Removal of Rubbish Road Land. up to a lead of 50 metres outside the periphery of the area. By Manual Means)
S.O.R. PART - A Item No. 2.02 | 0.04 | Ha | 19,760.3 | ₹790.41 |
| 2 | Construction of Embankment with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. | 105.23 | M3 | 129.9 | ₹13,669.38 |
| 3 | Compacting original ground supporting subgrade (Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of Table 300-2 for sub-grade construction).
SOR Item No. 3.20 Case-1 | 76.5 | M3 | 52.6 | ₹4,023.9 |
| 4 | Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2) S.O.R. Item No. 3.18 | 114.36 | M3 | 131.3 | ₹15,015.47 |
| 5 | Construction of Granular Sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401
(i) for grading- I Material
S.O.R. Item No. R.W.D 4.01 B (I) | 55.06 | M3 | 1,437.6 | ₹79,154.26 |
| 6 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, Plain Cement Concrete Pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
S.O.R. Item No. 6.02 | 212.4 | M3 | 5,360.4 | ₹11,38,548.96 |
| 7 | E/W in excavation for structure as per drawing and technical specification clause 305.1 including setting out, construction of shoring and brading, removal of stumps and other deleterious material and disposal utp a lead of 50m, dressing of sides and bottom backfilling in trenches with excavated suitable material. S.O.R. Item No. 3.13 (i) B | 618.52 | Cum | 55.8 | ₹34,513.42 |
| 8 | Providing and laying of dry Rubble Flooring complete as per Drawing and Technical specifications. S.O.R. Item No. 16.09 | 13.87 | Cum | 1,544.4 | ₹21,416.97 |
| 9 | Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301(14.1) S.O.R. Item No. 16.04 A | 45.54 | Cum | 1,158.4 | ₹52,753.54 |
| 10 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203of pcc M15. S.O.R. Item No. 12.08 A case II | 103.44 | Cum | 3,754.4 | ₹3,88,370.48 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
SBD03.pdf
Tender Documents • 0.60 MB
BOQ_158352.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .