| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 LAccepted-AOC | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹8.6 L+₹81,617 (10.5%)Rejected-Finance | L2 | Rejected-Finance Quoted rate higher than L1 bidder | |
| 3 | L3₹8.6 L+₹83,070 (10.7%)Rejected-Finance RONALDSAY ROAD JOYMAGAR BUS STAND AGARTALA WEST TRIPURA | AGARTALA | WEST TRIPURA | TRIPURA | L3 | Rejected-Finance Quoted rate higher than L1 bidder |
Tender Value
₹7.2 L
EMD Value
₹14,500
Closing Date
9 Jun 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE
HQ 137 Wks Engrs PIN 914137 Co 99 APO
REPAIR MAINT OF HT VCBs OCBs AND TRANSFORMERs GODs WITH CONNECTED WKS AT LEIMAKHONG MIL STN
2021_MES_413425_3
8531/E8
Open Tender
Miscellaneous Works
Item Rate
270 days
Leimakhong
Class E
Category b ii
2 documents required · 2 mandatory
₹500
GE 869 EWS
₹14,500
17 Jul 2021
25 May 2021
11 Jun 2021
25 May 2021
9 Jun 2021
26 May 2021
60 days
Amount
Material and labour for servicing of HT 11KV VCB of current rating upto 400A of any make and type and carry out the followign work:- (a) cleaning/decarbonizing of all contacts, lever using suitable cleaning agent and tightening of screws, nuts, bolts, etc. (b) Lubricating/greasing of all operating mechanism and moving parts, switching mechanism, de-moisturing of all parts. (c) checking of all operating mechanism adjustments, measurements of the mechanical clearances of the operating mechanism, tightening of all connections, replace the unserviceable nut, bolt & washers. engage the isolator with the supply system and testing for amooth functioning. (d) Heating/drying testing of insulators for desired IR value Note:- (i) The cost of unserviceable nut, bolt with double washers replacement of complete HT packing/gasket shall deemed to be included in the quoted rate (ii) The breaker shall be repaired through authorised service engineer of the manufacture.
Material and labour for servicing of HT OCB 11 KV alongwith CTs/PTs of current rating upto 630 A of any make and type by drawing out breaker from panel and carry out the following work :- (a) Disconnect the breaker from oil tank, draining out oil and keeping aside in barrel for re-use and then again pouring back including necessary filteration and dehydration and replacing/ adding with new transformer oil to top up the required level, filteration/replace the oil, after removing the sludge deposited and cleaning the tank. (b) Cleaning/decarbonizing of all fixed and moving contacts, levers, springs, etc by using suitable cleaning agent and tighten screws, nuts, bolts, spring etc. (c) Lubricating/greasing of all operating mechanism and moving parts, switching & tripping mechanism, automatic shuttering system, necessary brazing, turnig, polishing of main and auxiliary contact, demoisturing of insulators and other parts. (d) Checking of tripping relay, etc including interlocking if. any (e) Checking of all end terminals, tighting the nut bolt and washers, replace the unserviceable nut, bolt & washers, draw-in the breaker, put in position, engage the OCB with the supply system and testing for smooth functioning. (f) Check oil dielectric strength before and after filteration.
(g) Checking of operating mechanism adjustments, internal wiring circuit, including providing insulation by necessary taping, tightening of all connections, replacement of HRC fuse (if any found u/s), measurements of the mechanical clearances of the operating mechanism associated with the tank or pole should be made including removing moisture deposit. Note :- (i) The cost of unserviceable nut, bolt with double washers, HRC fuzes, fuze carrier base, replacement of complete HT packing/gasket shall deemed to be included in the quoted rate. (ii) The breaker shall be repaired through authorised service engineer of the manufacturer.
Material and labour for taking out Transformer from its position for repair /servicing/ rewinding of capacity 50 KVA, 11/0.433 KV installed at OMC on Two Pole structure at Engrs Offrs Mess by disconnecting /opening HV, LV Electrical connections, earthing connections along with following works:- a) Transporting transformer to workshop at Imphal and back to site by making necessary arrangements of T&P (crane, recovery, vehicle, tripoid to be arranged by the contractor) as directed. b) Opening of transformer top cover by extraction ,removing of serviceable - unserviceable nuts bolts and washers. c) Draining out of transformer oil and keeping in safe custody for reuse. d) Lifting primary coil (HT) and secondary coil (LT) , dismantaling of transformer complete part by part carefully , and display all the parts without damaging any portion for inspection of Engineer-in- Charge and BOO detailed by Garrison Engineer to ascertain the serviceability of parts and quantam of repairs involved. e) Refilling topping up of transformer oil after dehyderation and filteration in transformer. f) Re-assembeling the transformer complete with all existing serviceable parts, and new parts as ordered . g) Reinstall the Transformer at site in position as directed after repair connecting HV, LV electrical connections, earthing connections and testing to entire satisfaction on load .
Material and labour for taking out Transformer from its position for repair /servicing/ rewinding of capacity 200 KVA to 315 KVA, 11/0.433 KV by disconnecting/opeing HV, LV Electrical connections earthing connections along with following works:- a) Transporting transformer to workshop at Imphal and back to site by making necessary arrangements of T&P (crane, recovery, vehicle, tripoid to be arranged by the contractor) as directed. b) Opening of transformer top cover by extraction ,removing of serviceable - unserviceable nuts bolts and washers. c) Draining out of transformer oil and keeping in safe custody for reuse d) Lifting primary coil (HT) and secondary coil (LT) , dismantaling of transformer complete part by part carefully , and display all the parts without damaging any portion for inspection of Engineer-in- Charge and BOO detailed by Garrison Engineer to ascertain the serviceability of parts and quantam of repairs involved. e) Refilling topping up of transformer oil after dehyderation and filteration in transformer. f) Reassembeling the transformer complete with all existing serviceable parts, and new parts as ordered . g) Reinstall the Transformer at site in position as directed after repair connecting HV, LV electrical connections, earthing connections and testing to entire satisfaction on load .
Material and labour for repair /servicing to transformer at site of capacity 50 KVA to 250 KVA installed on Plinth / Pole mounted structure by opening top cover & replacing unserviceable spares / components of transformer ,without lifting core assembely reassembling after repair and testing complete all as specified and directed.
Material and labour for repair /servicing to transformer at site of capacity 300 KVA to 315 KVA installed on Plinth / Pole mounted structure by opening top cover & replacing unserviceable spares / components of transformer ,without lifting core assembely reassembling after repair and testing complete as all specified and directed.
Note:- For Sch 'A' item No 3.00 to 6.00 Major spare parts required if any for repair shall be measured and paid separately as supply only under serial item No. 8.00 to 26.00 here-in-after, where as any minor parts/misc. parts i.e. adequate size of Nut, bolts & washers etc those which are not catered in Sch 'A' and required for smooth functioning of transformer are deemed to be included in the quoted rates.
Supply only Ceramic Bush insulators on LT side as per existing size, shape and specification for capacity 300 to 315 KVA, 11/0.433 KV transformers complete all as specified and as directed.
Supply only Ceramic Bush insulators on LT side as per existing size, shape and specification for capacity 200 to 250 KVA, 11/0.433 KV transformers complete all as specified and as directed.
Supply only Ceramic Bush insulators on LT side as per existing size, shape and specification for capacity 50 to 160 KVA, 11/0.433 KV transformers complete all as specified and as directed.
Supply only brass spindle on LT side as per existing size, shape and specification for capacity 300 to 315 KVA, 11/0.433 KV transformers complete all as specified and as directed.
Supply only brass spindle on LT side as per existing size, shape and specification for capacity 200 to 250 KVA, 11/0.433 KV transformers complete all as specified and as directed.
Supply only brass spindle on LT side as per existing size, shape and specification for capacity 50 to 160 KVA , 11/0.433 KV transformers complete all as specified and as directed.
Supply only cork sheet gasket (set of four) for ceramic bushing on LT side as per existing size, shape and specification complete for capacity 300 to 315 KVA, 11/0.433 KV transformers complete all as specified and as directed.
Supply only cork sheet gasket (set of four) for ceramic bushing on LT side as per existing size, shape and specification complete for capacity 200 to 250 KVA, 11/0.433 KV transformers complete all as specified and as directed.
Supply only cork sheet gasket (set of four) for ceramic bushing on LT side as per existing size, shape and specification complete for capacity 50 to 160 KVA, 11/0.433 KV transformers complete all as specified and as directed.
Supply only Ceramic Bush insulators on HT side as per existing size, shape and specification for capacity 300 to 315 KVA, 11/0.433 KV transformers complete all as specified and as directed.
Supply only Ceramic Bush insulators on HT side as per existing size, shape and specification for capacity 200 to 250 KVA, 11/0.433 KV transformers complete all as specified and as directed.
Supply only Ceramic Bush insulators on HT side as per existing size, shape and specification for capacity 50 to 160 KVA, 11/0.433 KV transformers complete all as specified and as directed.
Supply only brass spindle on HT side as per existing size, shape and specification for capacity 300 to 315 KVA, 11/0.433 KV transformers complete all as specified and as directed.
Supply only brass spindle on HT side as per existing size, shape and specification for capacity 200 to 250 KVA, 11/0.433 KV transformers complete all as specified and as directed.
Supply only brass spindle on HT side as per existing size, shape and specification for capacity 50 to 160 KVA , 11/0.433 KV transformers complete all as specified and as directed.
Supply only top cover gasket set as per existing size, shape and specification complete for capacity 300 to 400 KVA , 11/0.433 KV transformers complete all as specified and as directed.
Supply only top cover gasket set as per existing size, shape and specification complete for capacity 200 to 250 KVA, 11/0.433 KV transformers complete all as specified and as directed.
Supply only top cover gasket set as per existing size, shape and specification complete for capacity 50 to 160 KVA, 11/0.433 KV transformers complete all as specified and as directed.
Supply only silica gel in crystal form of breather assembly of transformer capacity upto 1200 KVA at installed site complete all as specified and directed.
Material and labour for rewinding of LV side by using super enamelled copper winding wire as per relevant IS and orginal gauge/data,including insulating materials such as cotton tape, packing and sleeves etc varnishing by vaccum impregnation and baking of coil core assembly for copper wound transformer complete all as specified and as directed. Note : Rewinding of transformer LT coils shall be carried from ISO certified 2008 Coy.
Material and labour for rewinding of HV side by using super enamelled copper winding wire as per relevant Is and orginal gauge/data,including insulating materials such as cotton tape, packing and sleeves etc varnishing by vaccum impregnation and baking of coil core assembly for copper wound transformer complete all as specified and as directed. Note : Rewinding of transformer HT coils shall be carried from ISO certified 2008 Coy.
Material and labour for re-insulation of HT coil of transformer of any capacity using proper size paper insulation material to form DPC Copper wire and HT insulation material suitable for HT 11 KV transformer complete all as specified and directed. Note : Item shall be measured only where re-insulation of copper wire is required.
Material and labour for re-insulation of LT coil of transformer of any capacity using proper size paper insulation material to form DPC Copper wire and insulation material suitable for HT 11 KV transformer complete all as specified and directed. Note : Item shall be measured only where re-insulation of copper wire is required.
Supply and filling top up of transformer oil conforming to IS -335 of 1993 up to desired level of transformer oil capacity complete all as specified and as directed. Note: (i) Dielectric strength of oil should not be less than 50 KV/mm complete all as specified and directed. (ii) Transformer oil shall be brought in manufacturer sealed drum at site.
Material and labour for preparation of old painted steel or iron surfaces of transformer of 50 to 100 KVA , 11/0.433 KV capacity transformers by scrapping with steel wire brush/scrapper emery paper, etc. and applying two coats of synthetic enamel smoke grey paint over a coat of red oxide primer (painting shall be done by spray machine) including writing of SM No, MES No etc. at prominent place/location of transformer with black synthetic enamel thick paint in white back ground complete all as specified and directed.
Material and labour for preparation of old painted steel or iron surfaces of transformer of 160 to 250 KVA , 11/0.433 KV capacity transformers by scrapping with steel wire brush/scrapper emery paper, etc. and applying two coats of synthetic enamel smoke grey paint over a coat of red oxide primer (painting shall be done by spray machine) including writing of SM No, MES No etc. at prominent place/location of transformer with black synthetic enamel thick paint in white back ground complete all as specified and directed.
Material and labour for preparation of old painted steel or iron surfaces of transformer of 300 to 315 KVA , 11/0.433 KV capacity transformers by scrapping with steel wire brush/scrapper emery paper, etc. and applying two coats of synthetic enamel smoke grey paint over a coat of red oxide primer (painting shall be done by spray machine) including writing of SM No, MES No etc. at prominent place/location of transformer with black synthetic enamel thick paint in white back ground complete all as specified and directed.
Material and labour for heating,filtration and dehydration of transformer oil on site at different location with dehydration/filtration plant to achieve dielectric strength of 40 KV at 4 mm gap complete all as specified as directed by Eng-in-charge. (Any damage occurred to transformer during the process of dehydration, shall be made good by the contractor to the entire satisfaction of the Engr-in-charge at his own expenses) complete all as specified and directed.
Supply and fixing Switch Air Break Gang Operated for 11 KV grade, Triple Pole vertically mounted on insulator and fitted on steel frame , current rating 200 Amps, mechanically operated mechanism from Ground Level consisting of Operating Rod of GI Pipe 25mm bore (dia) ‘light grade’ of suitable Length worked From Ground Level and with Locking Arrangement Mild Steel Flat Iron Clamp 50x6mm including dismanting old unserviceable Switch Air Break of any descrip tion, complete all as specified and as directed
Supply and fixing Switch Air Break Gang Operated for 11 KV grade, Triple Pole vertically mounted on insulator and fitted on steel frame , current rating 400 Amps, mechanically operated mechanism from Ground Level consisting of Operating Rod of GI Pipe 25mm bore (dia) ‘light grade’ of suitable Length worked From Ground Level and with Locking Arrangement Mild Steel Flat Iron Clamp 50x6mm including dismanting old unserviceable Switch Air Break of any descrip tion, complete all as specified and as directed
Dismantling of Air Break Gang Operated Switches HT 11 KV 3 Phase, any capacity ( 200/400 ) Amps vertical / horizontal mounted including Insulators and Operating Mechanism for repair/replacement of broken / worn out components and insulators etc. with or without taking down from Pole complete all as specified and as directed Note :- (a) Parts needed to be replaced shall be measured and paid seperately as 'supply only' against appropriate Items of Schedule. However Labour component involved in replacement is included in Unit Rate quoated against this Item. The Unit Rate shall deemed to be included for handling of serviceable materials for reuse to site and as directed (b) Any minor repairs involved to make the GOD functional even if notified by Engineer-in-Charge shall be carried out by the Contractor without any extra cost to the Department.
Supply only Male Contact/ Moving Contact Blade suitable for Air Break Gang Operated Switches, 11KV, complete all as specified and as directed.
NAGALAND AGENCIES CO
M/S NIYATI NETWORK
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .