Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.0 CrAccepted-AOC | ₹1.0 Cr | L-1 | Accepted-AOC Accept |
| 2 | Rejected-Technical | - | - | Rejected-Technical Reject |
| 3 | Rejected-Technical WIR DUBBE M NORK MATE CREED ARES SECTOR 11 P FIEAR HAND DIEET R | SHAHDARA | DELHI | 110031 | - | - | Rejected-Technical Reject |
Tender Value
₹1.0 Cr
EMD Value
₹2.1 L
Closing Date
7 Dec 2019, 5:00 pmClosed
Executive Engineer
O/o Executive Engineer, Provincial Division No.i, PWD BnR Branch, Rohtak
Pdg. and Laying Cement Concrete Block on DHS to Gandhra road from Km. 0.050 to 0.900 in Rohtak Distt. (Road ID-1883) Reinvited
2019_HRY_109070_2
16058-16358 dt. 16.11.19
Open Tender
Civil Works
Item-rate/Agreement basic
180 days
Rohtak
Please refer tender documents.
2 documents required · 2 mandatory
₹15,000
Executice Engineer, Prov. Division No.1, Rohtak
₹2.1 L
Yes
Rohtak
28 Sept 2020
16 Nov 2019
10 Dec 2019
16 Nov 2019
7 Dec 2019
16 Nov 2019
25 Nov 2019
Amount
Milling of distress bituminous layer upto 20mm depth in a single pass with suitable milling machine (capable of milling @ 200-300 Sqm area per Hr.) Fitted with loading conveyor for loading the milled material directly on the tucks for safe disposal with all leads and lifts complete in all respects. Note: - The quantity of milled bituminous mix material shall be a recovery item as mention in BOQ item No. 12.
Providing and laying 100 mm thick granular sub base consisting of drainage-cum- filter layer confirming to Table 400.1 Grading - VI of MoRT&H 5th edition, mixing in a mechanical mix plant at OMC, carriage of mix material to the site of work, spreading in uniform layer with motor grader on prepared surface and compacting with vibratory power roller to achieve desired density complete as per clause No. 401 of MoRT&H specifications. Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI).2. Materials to be used and operations of manufacturing shall be approved by engineer.
Manufacturing, supplying and laying of precast cement concrete rectangular block (0.45 M x 0.30 M x 0.15 M) M-30 grade using minimum cement concrete 320kg/per cum with digital batching plant duly compacted with table vibration including setting in position over bed prepared with 25mm thick fine sand and filling up the joints with fine sand (NS).
Earth work in excavation in foundations, trenches etc. in all kinds of soils, not exceeding 2 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil, clear from the edge of excavation and subsequent filling around masonry, in 15 cm. layers with compaction, including disposal of all surplus soil, as directed within a lead of 30 metres. (HSR 6.6)
Cement Concrete 1:4:8 with stone aggregate 40mm nominal size in foundation and plinth (HSR10.39)
Cement concrete 1:2:4 with stone aggregate 20 mm nominal size in foundation and plinth. (HSR 10.41)
First class bricks work laid in cement sand mortar 1:4 in foundation and plinth. (HSR 11.4).
12 mm thick cement plaster 1:4. (HSR 15.5).
Cement concrete 1:1½:3 with stone aggregate 20mm nominal size for reinforced concrete work in slabs with inclination not exceeding 25 degree with Horizontal, excluding steel reinforcement , but including centering and shuttering, laid in position, complete in all respect extra over item Nos. 10.79 to 10.94, if 1:1½:3 mix is used, instead of 1:2:4. {HSR 10.82 + 10.95 (a)}.
Fe-500 EQR/TMT steel bars for R.C.C. works, where not included in the complete rate of R.C.C. including bending, binding and placing in position complete in all respect. Note: - Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work, excluding overlaps. From the length so measured, the weight of reinforcement shall be calculated in tones on the basis of IS: 1732. Wastage, overlaps, coupling, welded joints space bars, chairs, stay, hangers and annealed steel wire or other methods for binding and placing, shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement (NS).
Preparation of berms including filling of Earth work, excavation and cutting of earth in all kind of soils including dressing the bank, side slope to given levels and templates after breaking of clouds, including the cost of rolling and watering all allowances for labour hardness wetness irrespective of all lead and lift and including compensation for earth taken from private land, fields etc. and compacted to meet requirement of table 300-2 of MoRT&H specification clause No. 305 and to the entire satisfaction of the Engineer of the work conforming to PWD specification No. 6.2 and 6.3 and 3.2 and the other specification 1990 Ist edition. As per X-section attached at DNIT at Section-9. Note: - No earth work will be allowed to be taken from PWD B&R/ROW except for surplus earth after approval from Engineer.
Recovery items: The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing bituminous layer have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under :- (i) Bituminous mix material @ Rs.1250/- P. Cum. Note: - All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price. Note: - 1)In case of any difference in the unit& nomenclature of any of the HSR items depicted in this DNIT and that given in HSR, the unit and Nomenclature given in HSR shall be applicable. 2) In case of any difference in the unit of any Non-schedule item depicted in this DNIT and the conventional unit of that N.S. item as per practice in this department, the conventional unit as per practice shall be applicable.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .