Construction of Cremation Shed with all amenties to Purisai Colony In Purisai Panchayat.
2025_RDTN_563395_1
1290/2025/A6 dt 28.05.2025
Open Tender
Civil Works - Buildings
Lump-sum
BDO Office Walajabad
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹20,000
1 Aug 2025
30 May 2025
11 Jun 2025
30 May 2025
11 Jun 2025
30 May 2025
Amount
Construction of Cremation Shed with all amenties to Purisai Colony In Purisai Panchayat.
Earth work excavation for foundation in all soils and sub - soils to full depth etc. complete as per SS 20B
Supplying and filling in foundation and basement with Filling Sand in layers not more 15 cm thick etc. complete.
Cement concrete 1:4:8 for foundation using 40mm HBG metal etc. incl all charges .complete.
Rein forced Cement concrete 1:1.5:3 mix using 20mm HBG metal for foundation and basement etc. complete.
Supplying and erecting centering of sides and soffits including supports and strutting up to 3.29m height for plane surfaces in all floors etc. complete.
Supplying and fabrication of steel including cost and conveyance and cutting, bending, tying and placing in position
B.W in cm 1:5 Mix using new Country bricks incl all cost and Conveyence incl All charges
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
Color washing Two coat with approved Emulsion Paint in all floors using best quality and approved varity of colour pigments including cost of all materials brushes and scaffolding charges etc. complete.as per std specifications
Towards the labour charges for centering the C.C.Works including all other labour charges etc, complete.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc,complete.
C.C. 1:1.5:3. Mix using 20MM ISS HBG metal including cost and conveyance and all other labour charges etc,complete.
Towards the cost and supply of 12mm thichness of Bituminous Pad etc, complete.
Earth work excavation for foundation in all soils and sub - soils etc., complete as per SS 20B
Supplying and filling in foundation and basement with Filling Sand in layers not more than15 cm thick etc. complete.
Cement concrete 1:4:8 for foundation using 40mm HBG metal etc. complete.
Reinforced Cement concrete 1:1.5:3 mix using 20mm HBG metal for foundation and basement etc. complete.
Supplying and erecting centering of sides and soffits including supports and strutting up to 3.29m height for plane surfaces in all floors etc. complete.
Supplying and erecting centering of sides and soffits including supports and strutting up to 3.29m height for plane surfaces in all floors etc. complete.
Supplying and fabrication of steel including cost and conveyance and cutting, bending, tying and placing in position.etc.complete
Brick work in cement Mortar 1:5 for super structure using country bricks etc., complete.
Plastering with Cement Mortar 1:5 (one cement and five sand) 12mm thick in all floor including curing etc. complete.
Finishing the exposed surface of RCC items in CM 1:3,10mm thick for slabs, beams etc., complete.
Finishing Top of roof with one course of press tile over set in CM 1:3
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Cement concrete 1:2:4 mix using 20mm HBG metal for ground floor etc. complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
S.SELVAM (BID ID -1364391)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .