| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹86.1 LRejected-Finance PLOT NO 4541 8062 INDRAHARI NAGAR TURANG DIST ANGUL ODISHA 759122 | DHENKANAL | ODISHA | 759122 | ₹86.1 L | L1 | Rejected-Finance REJECTED DUE TO WITHDRAWAL OF BID |
| 2 | L2₹86.5 L+₹41,946.61 (0.49%)Rejected-Finance AT SHARMA CHHAK PO TALCHER ANGUL ODISHA DIST ANGUL ODISHA 759100 | ANUGUL | ODISHA | 759100 | ₹86.5 L+₹41,946.61 (0.49%) | L2 | Rejected-Finance REJECTED NOT BEING L1 |
| 3 | L3₹1.1 Cr+₹27.0 L (31.4%)Rejected-Finance AT BHAIRABI SAHI PO TALCHER TOWN PS TALCHER DIST ANGUL 759107 | TALCHER | ANGUL | ODISHA | 759107 | ₹1.1 Cr+₹27.0 L (31.4%) | L3 | Rejected-Finance REJECTED NOT BEING L1 |
| 4 | L4₹1.2 Cr+₹31.5 L (36.6%)Rejected-Finance | ₹1.2 Cr+₹31.5 L (36.6%) | L4 | Rejected-Finance REJECTED NOT BEING L1 |
| Sl No | Description | Qty | Unit | BIBHUTI BHUSAN DHAR L1 | PRATAP KUMAR PANI L2 | JMD CONSTRUCTION JV L4 | SANJIB KUMAR BHUTIA L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Granular Sub-base with Well Graded Material (CBR>30 or more) (Table:- 400-1 & Table 400-2)Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification.for grading- III Material | 1,750.88 | cum | 1,279 ₹22,39,375.52 Lowest | 1,284 ₹22,48,129.92 | 1,512.15 ₹26,47,593.19 | 1,454 ₹25,45,779.52 |
| 2.00 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per clause 404 of specification.By Mechanical Means:Grading- I (63 to 45 mm)Using Screening Type-A (13.2mm Agg.) | 4,377.19 | cum | 1,379 ₹60,36,145.01 Lowest | 1,384 ₹60,58,030.96 | 1,965.6 ₹86,03,804.66 | 1,891 ₹82,77,266.29 |
| 3.00 | Supplying and stacking good quality moorum at work site with all lead and royalty, all complete | 560.28 | cum | 179 ₹1,00,290.12 Lowest | 184 ₹1,03,091.52 | 279.65 ₹1,56,682.3 | 269 ₹1,50,715.32 |
| 4.00 | Spreading moorum/sand/ stone dust etc. in layers not exceeding150mm in thickness, levelling to required gradient and camber, watering and consolidation of each layer with vibratory roller (Payment to be made for compacted volume of moorum/sand). | 466.9 | cum | 79 ₹36,885.1 Lowest | 84 ₹39,219.6 | 270.26 ₹1,26,184.39 | 260 ₹1,21,394 |
| 5.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.2.8.1bish to the dumping ground within 50 metres lead. | 1.82 | cum | 49 ₹89.18 Lowest | 54 ₹98.28 | 145.12 ₹264.12 | 140 ₹254.8 |
| 6.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.82 | cum | 3,879 ₹7,059.78 Lowest | 3,884 ₹7,068.88 | 4,044.93 ₹7,361.77 | 3,891 ₹7,081.62 |
| 7.00 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 1,113.05 | kg | 89 ₹99,061.45 | 94 ₹1,04,626.7 | 82.93 ₹92,305.24 | 80 ₹89,044 Lowest |
| 8.00 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work | 34.32 | sqm | 59 ₹2,024.88 Lowest | 64 ₹2,196.48 | 76.67 ₹2,631.31 | 74 ₹2,539.68 |
| 9.00 | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC | 1 | Nos | 85,209.31 ₹85,209.31 Lowest | 85,624.62 ₹85,624.62 | 1,16,368.27 ₹1,16,368.27 | 1,11,940.75 ₹1,11,940.75 |
Tender Value
₹2.1 Cr
EMD Value
₹2.6 L
Closing Date
14 Aug 2026, 6:55 pmClosed
STAFF OFFICER CIVIL JAGANNATH AREA
Office of the General Manager MCL, Jagannath Area Po-Dera,Dist-Angul, Odisha-759103
Providing temporary diversion of coal transportation road from SILO overhead conveyor (after coal stock no.AOC-09) towards CHP concrete road with drop gate system and from OSL chhak to CHP Chhak via Coal stock-14 (new diversion) at AOCP under JA.
2026_MCL_363444_1
MCL/GM(JA)/SO(C)/e- Tender/26-27/31, Dtd-11/08/26
Open Tender
Civil Works - Roads
Item Rate
20 days
ANANTA OCP
AS PER NIT
5 documents required · 5 mandatory
₹2.6 L
16 Sept 2026
11 Aug 2026
16 Aug 2026
11 Aug 2026
14 Aug 2026
11 Aug 2026
11 Aug 2026 - 12 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Granular Sub-base with Well Graded Material (CBR>30 or more) (Table:- 400-1 & Table 400-2)Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification.for grading- III Material | 1,750.88 | cum | 2,261 | ₹39,58,739.68 |
| 2 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per clause 404 of specification.By Mechanical Means:Grading- I (63 to 45 mm)Using Screening Type-A (13.2mm Agg.) | 4,377.19 | cum | 2,939 | ₹1,28,64,561.41 |
| 3 | Supplying and stacking good quality moorum at work site with all lead and royalty, all complete | 560.28 | cum | 418.15 | ₹2,34,281.08 |
| 4 | Spreading moorum/sand/ stone dust etc. in layers not exceeding150mm in thickness, levelling to required gradient and camber, watering and consolidation of each layer with vibratory roller (Payment to be made for compacted volume of moorum/sand). | 466.9 | cum | 404.1 | ₹1,88,674.29 |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.2.8.1bish to the dumping ground within 50 metres lead. | 1.82 | cum | 217 | ₹394.94 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.82 | cum | 6,048.05 | ₹11,007.45 |
| 7 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 1,113.05 | kg | 124 | ₹1,38,018.2 |
| 8 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work | 34.32 | sqm | 114.65 | ₹3,934.79 |
| 9 | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC | 1 | Nos | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
cancelled_1.pdf
pdf • 1.12 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.76 MB
Tendernotice_2.pdf
PDF • 1.64 MB
BOQ_376365.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .