Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹20.1 L
EMD Value
₹21,000
Closing Date
10 Nov 2023, 3:00 pmClosed
Block Development Officer BP
BDO Office Thally
Krishnagiri Dt-Thally Block-NNT-2023-24-1. Construction Of 60000 Litres Capacity OHT(12m Stagging) At Uliveeranapalli H_O Kalukondapalli-Package No-Tly-53
2023_RDTN_385715_1
Roc_3851_2023_R4_12_08_2023
Open Tender
Civil Works - Water Works
Item Rate
180 days
BDO Office Thally
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹21,000
BDO Office Thally
18 Nov 2023
4 Nov 2023
10 Nov 2023
4 Nov 2023
10 Nov 2023
4 Nov 2023
6 Nov 2023
Amount
CONSTRUCTION OF 60000 LITRES CAPACITY OHT(12m stagging) AT ULIVEERANAPALLI H/O KALUKONDAPALLI - Rs.20.08 lakhs
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers Below 1.50m from GL
Up to GL
Above GI and Upto 4.50m height
Above 4.50m and Upto 7.32m Ht from GL
Above 7.32m and upto 10.98m Ht from GL
Above 10.98m and upto 14.64m Ht from GL
Above 14.64m and upto 18.30m Ht from GL
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
Columns above 3.30m upto 5.30m HT from GL
Columns above 4.30m upto 5.30m HT from GL
Columns above 5.30m upto 6.30m HT from GL
Columns above 6.30m upto 7.30m HT from GL
Columns above 7.30m upto 8.30m HT from GL
Columns above 7.30m upto 8.30m HT from GL
Columns above 9.30m upto 10.30m HT from GL
Columns above 10.30m upto 11.30m HT from GL
Columns above 11.30m upto 11.40m HT from GL
Below GL and upto 3.30m HT above GL
From 5.30m to 6.30m Ht above GL
From 8.30m to 9.30m Ht above GL
From 11.30m to 12.30m Ht above GL
Curved Surface Upto 3.30m height
From 3.30m to 4.30m height
Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.
Provision for Photographic charges
Provision for chlorinator
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SR Enterprises
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .