| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.7 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹9.2 L+₹42,650 (4.88%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹9.3 L+₹58,150 (6.65%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MAA MUNDESWARI ENTERPRISES L3 | J S B INFRA L1 | M/s adrsh Enterprises L2 |
|---|---|---|---|---|---|---|
| 1.00Replacement of 11Kv VCB Pannel at 33/11 KV S/S Kashi under UEDD VIII Varanasi | ||||||
| 1.01 | Loading unloading & carriage of 11KV VCB Pannel from store to site | 9 | No | 40,050 ₹40,050 | 39,600 ₹39,600 Lowest | 41,400 ₹41,400 |
| 1.02 | Dismenmtling of old and damage 11KV VCB Pannel and shifting from inside to out side of control room | 8 | Job | 40,000 ₹40,000 | 31,200 ₹31,200 Lowest | 33,600 ₹33,600 |
| 1.03 | Shifting of 11KV Pannel from out side to inside the control room and errection the pannel in alignment with connection & jumpering etc. | 9 | Job | 63,900 ₹63,900 | 61,200 ₹61,200 Lowest | 65,250 ₹65,250 |
| 1.04 | Disconnect 11KV Cable from 11KV Old VCB And reconnection of cable after erection and installation of new 11kv VCB Pannel with HT Tape And nut Bolts as required | 8 | Job | 32,800 ₹32,800 | 30,400 ₹30,400 Lowest | 33,600 ₹33,600 |
| 1.05 | Earthing of all equipment with earth strip | 2 | Job | 17,200 ₹17,200 | 17,000 ₹17,000 Lowest | 17,200 ₹17,200 |
| 1.06 | Loading and unloading of damage pannel from site to store | 9 | No | 38,700 ₹38,700 | 37,800 ₹37,800 Lowest | 38,250 ₹38,250 |
| 2.00Replacement of 11Kv VCB Pannel at 33/11 KV S/S M.E.S. under UEDD V Varanasi | ||||||
| 2.01 | Loading unloading & carriage of 11KV VCB Pannel from store to site | 4 | No | 17,800 ₹17,800 | 17,600 ₹17,600 Lowest | 18,400 ₹18,400 |
| 2.02 | Dismenmtling of old and damage 11KV VCB Pannel and shifting from inside to out side of control room | 4 | Job | 20,000 ₹20,000 | 15,600 ₹15,600 Lowest | 16,800 ₹16,800 |
Tender Value
Refer Docs
EMD Value
₹13,000
Closing Date
11 Sept 2025, 3:00 pmClosed
SUPERINTENDING ENGINEER
UEDC-II, CHANDRIKA NAGAR COLONY, SIGRA, VARANASI
The work for Replacement of 11Kv VCB Pannel at 33/11 KV S/S Kashi, M.E.S, Pannalal Park and Ledhupur Under EE, UECD-II, Varanasi in Business Plan 2025-26 on Semi Turn Key Basis
2025_PVVNV_1068760_1
12/UEDC-II(V)/2025-26
Open Tender
Electrical Works
Lump-sum
120 days
UEDD-V, VI, VIII
PLEASE REFER AS PER TENDER DOCUMENT
2 documents required · 2 mandatory
₹3,835
EE, UECD-II, VARANASI
₹13,000
17 Sept 2025
26 Aug 2025
11 Sept 2025
26 Aug 2025
11 Sept 2025
26 Aug 2025
Replacement of 11Kv VCB Pannel at 33/11 KV S/S Kashi under UEDD VIII Varanasi
Loading unloading & carriage of 11KV VCB Pannel from store to site
Dismenmtling of old and damage 11KV VCB Pannel and shifting from inside to out side of control room
Shifting of 11KV Pannel from out side to inside the control room and errection the pannel in alignment with connection & jumpering etc.
Disconnect 11KV Cable from 11KV Old VCB And reconnection of cable after erection and installation of new 11kv VCB Pannel with HT Tape And nut Bolts as required
Earthing of all equipment with earth strip
Loading and unloading of damage pannel from site to store
Replacement of 11Kv VCB Pannel at 33/11 KV S/S M.E.S. under UEDD V Varanasi
Loading unloading & carriage of 11KV VCB Pannel from store to site
Dismenmtling of old and damage 11KV VCB Pannel and shifting from inside to out side of control room
Shifting of 11KV Pannel from out side to inside the control room and errection the pannel in alignment with connection & jumpering etc.
Disconnect 11KV Cable from 11KV Old VCB And reconnection of cable after erection and installation of new 11kv VCB Pannel with HT Tape And nut Bolts as required
Earthing of all equipment with earth strip
Loading and unloading of damage pannel from site to store
Replacement of 11Kv VCB Pannel at 33/11 KV S/S M.E.S. under UEDD V Varanasi
Loading unloading & carriage of 11KV VCB Pannel from store to site
Dismenmtling of old and damage 11KV VCB Pannel and shifting from inside to out side of control room
Shifting of 11KV Pannel from out side to inside the control room and errection the pannel in alignment with connection & jumpering etc.
Disconnect 11KV Cable from 11KV Old VCB And reconnection of cable after erection and installation of new 11kv VCB Pannel with HT Tape And nut Bolts as required
Earthing of all equipment with earth strip
Loading and unloading of damage pannel from site to store
Replacement of 11Kv VCB Pannel at 33/11 KV S/S Ledhupur under UEDD VI Varanasi
Loading unloading & carriage of 11KV VCB Pannel from store to site
Dismenmtling of old and damage 11KV VCB Pannel and shifting from inside to out side of control room
Shifting of 11KV Pannel from out side to inside the control room and errection the pannel in alignment with connection & jumpering etc.
Disconnect 11KV Cable from 11KV Old VCB And reconnection of cable after erection and installation of new 11kv VCB Pannel with HT Tape And nut Bolts as required
Earthing of all equipment with earth strip
Loading and unloading of damage pannel from site to store
Other Misc. Work.
M/s adrsh Enterprises (BID ID -5527194)
MAA MUNDESWARI ENTERPRISES (BID ID -5527238)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .