Chief Engineer, KNN
Chief Engineer Office, KNN, Motijheel
Renovation work on the urinal located at Tikoniya Park, Swaroop Nagar in Tilak Nagar under Ward-61, Zone-04.
2026_NNKAN_1197073_1
283/AA-4/26-27
Open Tender
Civil Works
Percentage
30 days
ward-61
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹29,219
15 Oct 2026
15 Oct 2026
21 Oct 2026
15 Oct 2026
21 Oct 2026
15 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick work or stone work in lime or cement mortar and Including stacking of materials as directed by Engineer-In-Charge within a distance of 60 meters 1200 feet\. Dismantling brick work or stone work in lime or cement mortar and Including stacking of materials as directed by Engineer-In-Charge within a distance of 60 meters 1200 feet | 3.48 | cum | 580 | ₹2,017.01 |
| 2 | Earth Work-E/W in Excavation in trenches for foundation pipe cable in ordinary soil including 1.5left and 50m and dressing of side and ramming of bottom and disposal of surplus axcavated earth Earth work in execavation in foundation and under plinth area lift 1.5 m lead 30 m with all charges complete | 4 | cum | 174 | ₹696 |
| 3 | Concrete/R.C.C. Work-4.1.8 Providing and laying In position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:4:8 (1 Cement : 4 coarse sand (zone-Ill) : 8 graded stone aggregate 40 mm (nominal size)- | 0.83 | cum | 5,740 | ₹4,775.68 |
| 4 | Concrete/R.C.C. Work-RCC work with cement approved coarse sand and 20mm approved stone ballast in proportion for raft foundation with 1:1.5:3 (1 cemnt 1.5 C. sand 20 mm size stone ballast) RCC work with cement approved coarse sand and 20mm approved stone ballast in proportion for raft foundation with 1:1.5:3 (1 cemnt 1.5 C. sand 20 mm size stone ballast) including bending binding and fixing of reinfocement in position casting cutting of wall and satisfaction of the engineer in charge including cost of all material etc all complete (ch-5, sn-15, ref- 5.2.2)- | 2.98 | cum | 8,600 | ₹25,634.11 |
| 5 | M.S. or iron in plain work such as hevey size as fabrication of M.S. M.S. or iron in plain work such as hevey size as fabrication of M.S | 2.33 | qtl | 7,200 | ₹16,776 |
| 6 | Class-150 brick work in 1:4 cement, c. sand in foundation and pilnth etc all complete. Brick work with common burnt clay (non modular) bricks of class-150 in foundation and plllinth in. Cement mortar 1:4 (1 cement : 4 coarse sand)- | 0.53 | cum | 6,600 | ₹3,506.58 |
| 7 | Providing and laying Vitrified tiles In different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % Size of TIie 600x600 mm Providing and laying Vitrified tiles In different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, In all colours & shade, In skirting. riser of steps, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), Jointing with grey cement slurry @ 3.3 kg/ sqm including grouting the init with white cement & matching pigments etc. complete | 2.63 | sqm | 1,024 | ₹2,695.68 |
| 8 | Tile work in skirting risers of steps and dado up to 2m height over 12mm thick bed of cement mortar 1:3 (1 cement : 3coarse sand) 8mm thick Tile work in skirting risers of steps and dado up to 2m height over 12mm thick bed of cement mortar 1:3 (1 cement : 3coarse sand) 8mm thick etc all comp- | 43.2 | sqm | 975 | ₹42,120 |
| 9 | Brick work with common burnt clay (non modular) bricks of class -150 in super structure Cement mortar 1:4 (1 cement: 4 coarse sand) Brick work with common burnt clay (non modular) bricks of class -150 in super structure above plinth level up to floor V level in all shapes and sizes. Cement mortar 1:4 (1 cement: 4 coarse sand)- | 2.29 | cum | 7,500 | ₹17,172 |
| 10 | New Finishing walls with Putty approved brand and manufacture and of required shade on undacorated wall surface Finishing walls with Putty approved brand and manufacture and of required shade on undacorated wall surface to give even shade over including curing and cost of all material, labour, T&P etc. required for proper completion of work | 4.32 | sqm | 135 | ₹583.2 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.55 MB
BOQ_2261670.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .