Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.5 LAdmitted-Finance | -35.40% | ₹3.5 L | L1 | Admitted-Finance |
| 2 | L2₹3.6 LAdmitted-Finance | -33.33% | ₹3.6 L | L2 | Admitted-Finance |
| 3 | L3₹5.0 LAdmitted-Finance | -8.00% | ₹5.0 L | L3 | Admitted-Finance |
Tender Value
₹5.4 L
EMD Value
₹10,820
Closing Date
5 Feb 2026, 4:00 pmClosed
Executive Engineer PWD (RnB) Division Doda
Executive Engineer PWD (RnB) Division Doda
As per NIT/SBD
2026_PWDJK_301743_1
e-NIT10/MCD of 2025-26
Open Tender
Civil Works
30 days
Doda
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Yes
Treasury Challan under MH 0059
₹10,820
Yes
20 Feb 2026
30 Jan 2026
6 Feb 2026
30 Jan 2026
5 Feb 2026
30 Jan 2026
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil :
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 20% boulder
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete
Carriage of Meterial by Mechanical Transport including loading and unloading and stacking complete job at site.
Carriage of Stone at an average lead of 05.00kms by MT
Carriage of Sand at an average lead of 22.00kms by MT.
Carriage of Bajree at an average lead of 10. kms by MT .
Carriage of Bajree (Above 40mm ) at an average lead of 10.00kms by MT .
Carriage of ulba at an average lead of 02.00kms by MT .
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
BOQ_979030.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid