Tender Value
₹41.0 L
EMD Value
₹85,000
Closing Date
8 Jan 2026, 10:30 pmClosed
Visvesvaraya Jala Nigam Limited
Usha R V
Shifting of Existing 11 KV BESCOM Power Line coming across Chitradurga Branch Canal from km 61.230 to 73.00 km at Hosadurga and Holalkere Taluk in Chitradurga District
VJNL/2025-26/EL/WORK_INDENT446
VJNL/2025-26/EL/WORK_INDENT446
Open
Electrical
Two Tender Document System(Two Cover)
VJNL Division UBP NO 7 Office Hiriryur
9 documents required · 9 mandatory
Satisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
Proposals for subcontracting components of works amounting to more than 20% of the contract price (for each, the qualifications and experience of the identified sub-contractor in the relevant fields should be attached)
The intending bidder should have satisfactorily completed (at least 90% of the Contract Value) as a prime contractor at least one similar nature of work such as Shifting & stringing of conductor for HT Line of not less than 11KV along with distribution Transformer centre Costing not less than Rs.20.47 Lakh (usually not less than 50% of estimated value of contract) here value of contract implies final cost of work executed as per contract during last 5 years(i.e 2020-21 to 2024-25). An additional weight of 10% each year will be added to the cost of work done to bring it to the present price level. The work done certificate should be obtained from the competent authority, not below the rank of Executive Engineer of the concerned division.
A valid copy of CEIG Registered Class-I Electrical contractor license.
Copy of the GST Registration certificate.
Copy of the PAN
Valid Employees Provident Fund Registration Certificate along with latest 3 months paid challan copy prior to the tender notification .
Latest income tax returns filed for the assessment year 2025-26
Scanned signature of the bidder/authorized representative, in case of a firm or company, to be attached while uploading the bid documents. Also in case of authorized representative, scanned copy of power of attorney should be uploaded.
The available tender capacity of the bidder should be greater than the total tender value. The available tender capacity will be calculated as follows Assessed Available Tender Capacity (A multiply N multiply 2.5 minus B) A max value of Electrical engineering works executed in any one year during the last five years. (updated to 2024 25 price level) taking into account the completed as well as works in progress. N number of years prescribed for the completion of the works for which tenders are invited (N equal to tender period n divided by 12) B is value at the 2024 25 price level of existing commitments and ongoing works to be completed during the next n divided by 12 years Note. The statements showing the value of existing commitments and ongoing works as well as the stipulated period of completion remaining for each of the works listed should be countersigned by the employer in charge not below the rank of an Executive Engineer or equivalent officer.
The intending bidder should have in the last 5 years(i.e 2020-21 to 2024-25), achieved in at least two financial years a Minimum financial turnover (in all classes of Electrical works only) of Rs. 40.95 Lakhs (Usually not less than the estimated annual payments under this contract).Audited balance sheet certified by the chartered Accountant of two financial years in which required turnover is achieved along with IT returns filed for the said years are to be uploaded. An additional weightage of 10% per year will be added to bring it to the present price level. All documents/certificates issued by Chartered Accountant (CA) should have a UDIN - Unique Document Identification Number generated through the ICAI portal. Any such certificates without UDIN will be treated as an invalid document.
₹1,030
₹85,000
31 Dec 2025
31 Dec 2025
9 Jan 2026
7 Jan 2026
Shifting of Existing 11 KV BESCOM Power Line coming across Chitradurga Branch Canal from km 61.230 to 73.00 km at Hosadurga and Holalkere Taluk in Chitradurga District
PSCC Pole 9m Length 300 Kg. (Material Code :200005, Page No:3 in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
PSCC Pole 9m Length 200 Kg. (Material Code :200006, Page No:3, in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
PSCC Pole 8m Length 200 Kg. (Material Code :200004, Page No:3, in CSR 2023-24 for 11Kv System Volume-VI)no
---- As directed by Engineer in charge of the work
11 Mt Length Stun Pole (500Kg) ---- As directed by Engineer in charge of the work
3 Pin Cross bar clamp and Bolt nuts ---- As directed by Engineer in charge of the work
PSCC Pole 9m Length DP Structure ---- As directed by Engineer in charge of the work
11 kV, 200 Amps Single Break GOS. (Material Code : 304212, Page No:11, in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
Horizontal Cross bar. (Material Code :279013, Page No:3, in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
4 Pin Cross Bar.(Material Code :279014, Page No:5, in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
11 kV, 45 kN Polymeric Insulator (Material Code :283320, Page No:5 , in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
11 kV, 5 kN Composite/Polymeric Pin Insulator (24 mm dia FRP Rod) ( Material Code :283008, Page No:5 , in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
1.1 kV Ceramic Pin Insulator (Shell only). (Material Code :283053, Page No:5, in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
1.1 kV GI Pin for 1.1 kV Ceramic Shell Insulator.(Material Code :283053, Page No:5, in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
MS Fish Plate. (Material Code : 279800 Page No:5, in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
8 KV Strain Insulator. (Material Code :283158, Page No:5, in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
PSC Pole clamp.( Material Code :279510, Page No:4, in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
PSCC Pole clamp. (Material Code :279511, Page No:4, in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
HT Gye Set. (Material Code :279550, Page No:4, in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
Rabbit Conductor. (Material Code :284108, Page No:5, in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
Bolt and Nuts washer ---- As directed by Engineer in charge of the work
Other Materials ---- As directed by Engineer in charge of the work
Dismantling old Pole ---- As directed by Engineer in charge of the work
Installation of New Pole ---- As directed by Engineer in charge of the work
Dismantling of Transformer and Installation of Transformer ---- As directed by Engineer in charge of the work
Dismantling and Installation of Double Pole Set ---- As directed by Engineer in charge of the work
Bracings Erection and Dismantling ---- As directed by Engineer in charge of the work
Dismantling of Bracings ---- As directed by Engineer in charge of the work
HT Gye Set. ---- As directed by Engineer in charge of the work
Erection and Dismantling PVC Wiring Kit (Item No. 15.04, Page No. 49 of Labour charges in CSR 2023-24 for 11 kV System Volume-VI) ---- As directed by Engineer in charge of the work
Dismantling of Conductor 2/4 ACSR ---- As directed by Engineer in charge of the work
Stringing of Conductor.( Item No.6.02 Page No.46 of Labour charges in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
Erection and Dismantling Dolo Cut out. .( Item No.13.01 Page No.48 of Labour charges in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
PSCC Pole 9m Length DP Structure ---- As directed by Engineer in charge of the work
PSCC Pole 9m Length 200 Kg. (Material Code :200006, Page No:3 , in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
PSCC Pole 8m Length 200 Kg (For Studd). (Material Code :200004, Page No:3, in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
MS Fish Plate Bolt Nuts Including washer ---- As directed by Engineer in charge of the work
11 KV Horizontal Bracings HTST Support Clamp and Bolt Nut ( for PSCC POLE) M.S ---- As directed by Engineer in charge of the work
11 kV, 5 kN Composite/Polymeric Pin Insulator (24 mm dia FRP Rod) (Material Code :283008, Page No:5, in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
11 kV, 45 kN Polymeric Insulator (Material Code :283320, Page No:5, in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
HT Gye Set.( Material Code :279550, Page No:4, in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
Rabbit Conductor Including 1.5% SAG (Material Code: 284108, Page No: 5, in CSR 2023-24 for 11 kV System Volume-VI) ---- As directed by Engineer in charge of the work
Spiral Earth Electrode ---- As directed by Engineer in charge of the work
PSCC Pole 9m Length DP Structure ---- As directed by Engineer in charge of the work
PSCC Pole 9m Length 200 Kg ---- As directed by Engineer in charge of the work
PSCC Pole 8m Length 200 Kg (For Studd). ---- As directed by Engineer in charge of the work
11 KV Horizontal Bracings HTST Support Clamp and Bolt Nut ---- As directed by Engineer in charge of the work
HT Gye Set. ---- As directed by Engineer in charge of the work
Rabbit Conductor Including 1.5% SAG .( Item No.6.02 Page No.46 of Labour charges in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
Spiral Earth Electrode ---- As directed by Engineer in charge of the work
Erection of 25kva transformer on 9m long PSCC double pole along with the supply materials tools and tackles as per KPTCL/BESCOM design ---- As directed by Engineer in charge of the work
11 kV, 5 kN Composite/Polymeric Pin Insulator (24 mm dia FRP Rod) (Material Code :283008, Page No:5, in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
11 kV, 45 kN Polymeric Insulator( Material Code :283320, Page No:5, in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
HT Gye set assembly. (Material Code :279550, Page No:4, in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
11KV/433 VOLTS 63 KVA Transformer including oil 4 star ---- As directed by Engineer in charge of the work
11KV/433 VOLTS 63 KVA Transformer including oil 4 star ---- As directed by Engineer in charge of the work
Pipe type Earthlings material ---- As directed by Engineer in charge of the work
Caution Board ---- As directed by Engineer in charge of the work
Anti climbing Device ---- As directed by Engineer in charge of the work
8SWG GI Wire. (Material Code: 281110 Page No:5, in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
7/10 SWG Gye wire .(Material Code: 281110 Page No:5, in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
Lightening arrestor(Surge arrestor) 9KV, 5KV Metal Oxide. (Material Code: 281110 Page No:5, in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
LT Safety Kit .( Material Code: 301107 Page No:9, in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
LT wiring kit ---- As directed by Engineer in charge of the work
11KV HG Fuse Unit (03 no’s) ---- As directed by Engineer in charge of the work
11KV GOS 200AMPS Single break ---- As directed by Engineer in charge of the work
H Frame Set for fixing 11 kV, 200 Amps Single Break GOS (for DP structure for providing New GOS for sectionalization) MS. (Material Code: 279149, Page No: 11, in CSR 2023-24 for 11 kV System Volume-VI...
Erection of 25kva transformer on 9m long PSCC double pole along with the supply materials tools and tackles asper KPTCL/BESCOM design ---- As directed by Engineer in charge of the work
Gye set assembly ---- As directed by Engineer in charge of the work
Gye set concrete (polimer) ---- As directed by Engineer in charge of the work
11KV/433 VOLTS 63 KVA Tranformer including oil 4 star. .( Item No.8.01 Page No.46 of Labour charges in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
11KV/433 VOLTS 25 KVA Tranformer including oil 4 star.( Item No.8.01 Page No.46 of Labour charges in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
Pipe type Earthing material ---- As directed by Engineer in charge of the work
Caution Board.(Vide Item No.5.15 Page No.45 of Labour charges in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
Anti climbing Device ---- As directed by Engineer in charge of the work
Lightening arrestor(Surge arrestor) 9KV, 5KV Metal Oxide(3 no’s) ---- As directed by Engineer in charge of the work
LT Safety Kit . .( Item No.15.03 Page No.49 of Labour charges in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
LT wiring kit.( Item No.15.04 Page No.49 of Labour charges in CSR 2023-24 for 11Kv System Volume-VI) ---- As directed by Engineer in charge of the work
11KV HG Fuse Unit (03 nos) ---- As directed by Engineer in charge of the work
11KV GOS 200AMPS Single break ---- As directed by Engineer in charge of the work
Area-specific loading charges on material and labour ---- As directed by Engineer in charge of the work
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Shifting 11 KV Bid Document.doc
Tender Document • 44.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .