| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹15.3 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹15.7 L+₹37,549.37 (2.45%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹16.1 L+₹74,282.45 (4.85%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹16.5 L+₹1.2 L (7.56%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹16.6 L+₹1.2 L (8.09%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹16.3 L
EMD Value
₹33,000
Closing Date
23 Sept 2026, 12:00 pmClosed
VC ADA
ada office ramghat raod aligarh
Construction of one Annapurna shop near Gandhi Park and one near Lal Masjid.
2026_ALIDA_1184711_3
3645
Open Tender
Civil Works
Percentage
aligarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
VC ADA
₹33,000
23 Sept 2026
11 Sept 2026
23 Sept 2026
11 Sept 2026
23 Sept 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift , including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil.DSR-2.8.1 | 58.8 | Cum | 196.68 | ₹11,564.78 |
| 2 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 8km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. DSR 2.25A+ LEAD | 34.66 | Cum | 512.56 | ₹17,765.33 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources) DSR-4.1.3 | 14.16 | Cum | 5,952.84 | ₹84,292.21 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) M-20 DSR 5.1.2 | 11.86 | Cum | 6,834.79 | ₹81,060.61 |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns,pillars, piers abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) DSR 5.2.2 | 3.56 | Cum | 8,200.27 | ₹29,192.96 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). DSR 5.3 | 15.28 | Cum | 8,693.32 | ₹1,32,833.93 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns, etc. for mass concrete DSR 5.9.1 | 10.08 | Sqm | 296.3 | ₹2,986.7 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform DSR 5.9.3 | 88.92 | Sqm | 700.61 | ₹62,298.24 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for:Lintels, beams, plinth beams, girders, bressumers and cantilevers DSR 5.9.5 | 77.64 | Sqm | 556.4 | ₹43,198.9 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts DSR 5.9.6 | 68.76 | Sqm | 726.34 | ₹49,943.14 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
DOC_RFP.pdf
Tender Documents • 9.37 MB
BOQ_2228976.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .