Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.0 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹26.6 L+₹1.6 L (6.36%)Admitted-Finance 02 | L2 | Admitted-Finance | |
| 3 | L3₹27.9 L+₹2.9 L (11.5%)Admitted-Finance 0 BAANGAD WALTERGANJ BASTI BASTI UTTAR PRADESH 272182 | BASTI | UTTAR PRADESH | 272182 | L3 | Admitted-Finance | |
| 4 | L4₹34.1 L+₹9.1 L (36.4%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | Rejected-Technical 00 MIYA BAZAR NAGAR NIGAM SHOP HATTHI ASTHAN MAYA BAZAR GORAKHPUR UTTAR PRADESH 273001 | GORAKHPUR | UTTAR PRADESH | 273001 | - | Rejected-Technical Certificate of Competence of BP approved by Executive Engineer not enclosing hence bid is rejected. |
| Sl No | Description | Qty | Unit | M/S CHAUDHARY CONSTRUCTION COMPANY L3 | SRD ENTERPRISES L4 | M/S DURGA ENTERPRISES L2 | IKRAM ENGINEERING WORKS L1 |
|---|---|---|---|---|---|---|---|
| 1.00Material-Lines&Cable Decentralised.A1 | |||||||
| 1.01 | CLAMP FOR CHANNEL | 88 | No | 17,652.8 ₹17,652.8 | 17,600 ₹17,600 Lowest | 22,880 ₹22,880 | 22,880 ₹22,880 |
| 1.02 | 11 KV CROSS ARM HOLDING CLAMP | 26 | No | 5,215.6 ₹5,215.6 | 5,200 ₹5,200 Lowest | 6,760 ₹6,760 | 6,500 ₹6,500 |
| 1.03 | F- BRACKET(Ex GST) | 23 | No | 4,535.6 ₹4,535.6 Lowest | 6,900 ₹6,900 | 5,980 ₹5,980 | 6,900 ₹6,900 |
| 1.04 | DEAD END CLAMP WITH EYE HOOK(Ex GST) | 64 | No | 16,972.8 ₹16,972.8 | 28,800 ₹28,800 | 5,504 ₹5,504 Lowest | 10,880 ₹10,880 |
| 1.05 | SUSPENSION CLAMP WITH EYE HOOK(Ex GST) | 117 | No | 32,619.6 ₹32,619.6 | 35,100 ₹35,100 | 30,420 ₹30,420 Lowest | 40,950 ₹40,950 |
| 1.06 | Stay Clamps | 3 | No | 805.8 ₹805.8 | 900 ₹900 | 780 ₹780 | 750 ₹750 Lowest |
| 1.07 | TOP CHANNEL | 3 | No | 601.8 ₹601.8 Lowest | 2,400 ₹2,400 | 2,580 ₹2,580 | 2,700 ₹2,700 |
| 1.08 | DROPPER CHANNEL 100*50*1028MM | 6 | No | 3,366 ₹3,366 Lowest | 4,800 ₹4,800 | 9,288 ₹9,288 | 4,800 ₹4,800 |
| 1.09 | CLAMP FOR CHANNEL | 21 | No | 4,212.6 ₹4,212.6 Lowest | 16,800 ₹16,800 | 5,460 ₹5,460 | 5,250 ₹5,250 |
Tender Value
Refer Docs
EMD Value
₹34,000
Closing Date
17 Jun 2026, 4:00 pmClosed
Superintending Engineer
Superintending Engineer EDC-SANTKABIRNAGAR
Work for capacity enhancement of transformers at 99 locations under the Business Plan for the year 2026 27 under the Executive Engineer Electricity Distribution Division Khalilabad
2026_PVVNV_1155359_1
05/EDC(SKN)/2026-27
Open Tender
Electrical Works
Lump-sum
90 days
Santkabirnagar
As per Tender Specification
2 documents required · 2 mandatory
₹3,540
SE EDC SKN
₹34,000
24 Jun 2026
29 May 2026
18 Jun 2026
29 May 2026
17 Jun 2026
29 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Material-Lines&Cable Decentralised.A1 | |||||
| 1.01 | CLAMP FOR CHANNEL | 88 | No | - | - |
| 1.02 | 11 KV CROSS ARM HOLDING CLAMP | 26 | No | - | - |
| 1.03 | F- BRACKET(Ex GST) | 23 | No | - | - |
| 1.04 | DEAD END CLAMP WITH EYE HOOK(Ex GST) | 64 | No | - | - |
| 1.05 | SUSPENSION CLAMP WITH EYE HOOK(Ex GST) | 117 | No | - | - |
| 1.06 | Stay Clamps | 3 | No | - | - |
| 1.07 | TOP CHANNEL | 3 | No | - | - |
| 1.08 | DROPPER CHANNEL 100*50*1028MM | 6 | No | - | - |
| 1.09 | CLAMP FOR CHANNEL | 21 | No | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
TD_05.docx
Tender Documents • 0.16 MB
BOQ_2164332.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .