Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Fee/PreQual/Technical/Finance | -23.87% | ₹1.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.3 L+₹36,139.80 (19.1%)Admitted-Fee/PreQual/Technical/Finance | -9.33% | ₹2.3 L+₹36,139.80 (19.1%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
13 Aug 2026, 6:00 pmClosed
Executive Engineer RnB div Zainapora
Zainapora
Repair/Renovation of Divisional Office at RnB Division Zainapora.
2026_PWDJK_319834_1
38/ZNP/RnB/e-Tendering/2026-27
Open Tender
Civil Works
Percentage
45 days
Zainapora Shopian
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
JK Bank Account Bearing No 0470010200000099
₹10,000
14 Aug 2026
6 Aug 2026
14 Aug 2026
6 Aug 2026
13 Aug 2026
6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engagagement of JCB for removal of trees, shurbs etc all complete | - | Hour | 0.2 | - |
| 2Engagagement of Labour for the work as directed by the Engineer in charge | |||||
| 3 | Demolishing brick work manually/by mechanical means includingstacking of serviceable material and disposal of unserviceable materialwithin 50 meters lead as per direction of Engineer-in-charge: In cement mortar | - | Cum | 0.6 | - |
| 4 | Dismantling doors, windows and clerestory windows (steel or wood)shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 meters lead Of area of 3 sqm. and below | - | Each | 0.8 | - |
| 5 | Dismantling wood work in frames, trusses, purlins and rafters upto 10meters span and 5 meters height including stacking the material within 50 meters lead: Of sectional area 40 sqcm. and above | - | Cum | 0.6 | - |
| 6 | Dismantling tile work in floors and roofs laid in cement mortar including
stacking material within 50 meters lead.
15.23.1 For thickness of tiles 10 mm to 25 mm | - | sqm | 1 | - |
| 7 | Dismantling wooden boardings in lining of walls and partitions, excluding
supporting members but including stacking within 50 meters lead :
15.39.3 Thickness above 25 mm upto 40 mm. | - | sqm | 1 | - |
| 8Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil | |||||
| 9 | Supplying and stacking of good earth at site including royalty (earth measured in stacks will be reduced by 20% for payment) | - | Sqm | 0.2 | - |
| 10 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth
lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | - | Sqm | 0.8 | - |
stage.html
html • 0.02 MB
finance_1060698.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_1060698.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .