| 1 | L1₹37.3 CrAccepted-AOC | ₹37.3 Cr Quoted ₹38.2 Cr | L1 | Accepted-AOC BEING BOND CREATED |
| 2 | L2₹38.3 CrRejected-Finance GRAM BHIMAPAR TEHSIL NAUGARTH DISTRICT SIDDHARTHNAGAR | SIDDHARTH NAGAR | UTTAR PRADESH | 272152 | ₹38.3 Cr | L2 | Rejected-Finance BEING HEIGHER RATE FOUND |
| 3 | Rejected-Technical | - | - | Rejected-Technical FOUND NON RESPONSIVE IN PRAHARI SOFTWARE |
| 4 | Rejected-Technical | - | - | Rejected-Technical FOUND NON RESPONSIVE IN PRAHARI SOFTWARE |
| 5 | Rejected-Technical 0 | - | - | Rejected-Technical FOUND NON RESPONSIVE IN PRAHARI SOFTWARE |
Tender Value
Refer Docs
EMD Value
₹50 L
Closing Date
8 Mar 2021, 12:00 pmClosed
SE SUL-A CIRCLE PWD SULTANPUR
OFFICE OF THE SE SUL-A CIRCLE PWD SULTANPUR
AS PER NIT
2021_CEUFZ_560507_1
419/1COM-SU.A.CIRCLE/21 DT. 03.02.2021
Open Tender
Civil Works - Roads
365 days
SULTANPUR
AS PER BOQ
3 documents required · 3 mandatory
₹2,714
₹50 L
SULTANPUR
29 May 2021
27 Feb 2021
8 Mar 2021
27 Feb 2021
8 Mar 2021
27 Feb 2021
2 Mar 2021
Amount
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m including cost of all materials T&P, labour cess but excluding GST.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. including cost of all materials T&P, labour cess but excluding GST.
Construction of granular sub-base coarse by providing coarse graded Material, grading one spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 including cost of all materials T&P, labour cess but excluding GST.
Providing, laying, spreading and compacting graded Sukrut stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver. complete as per clause 406 including cost of all materials T&P, labour cess but excluding GST.
Providing, laying, spreading and compacting graded Sukrut stone aggregate to Stablised wet mix macadam (E.T.A.)specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, with 1 % OPC cement & 3.5 % emulsion laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.including cost of all materials T&P, labour cess but excluding GST.
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.35 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for D.B.M including cost of all materials T&P, labour cess but excluding GST.
Providing and laying dense graded bituminous macadam 50 mm Thick with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects including cost of all materials T&P, labour cess but excluding GST.
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared Primed surface/bitumen surface cleaned with mechanical broom for B.C including cost of all materials T&P, labour cess but excluding GST.
Providing and laying bituminous concrete 30 mm thick with 100-120 TPH batch type H.M.P. producing and average output of 75 tonne per hour using crushed aggregates of specified grading premix with bituminous binder grade VG-30 @ 5.4 percent of mix and filler, transporting the hot mix to work site , laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled vibratory and tandem rollers to achieve the desired compection as per M.O.R.T & H specification clause 508 complete in all respects including cost of all materials T&P, labour cess but excluding GST.
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing including cost of all materials T&P, labour cess but excluding GST.
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing including cost of all materials T&P, labour cess but excluding GST.
Same as above in item no 2 but for Construction of Shoulder/Patri including cost of all materials T&P, labour cess but excluding GST.
Widening of 1000 mm dia NP3 Humepipe culvert - Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m including cost of all materials T&P, labour cess but excluding GST.
Widening of 1000 mm dia NP3 Humepipe culvert - Concrete with 4 cm. gauge stone ballast, Fine sand of 1.25 F.M. and cement in proportion of 8:4:1 in foundation and under floors, including supply of all materials, labour and T&P etc. required for proper completion of the work including cost of all materials T&P, labour cess but excluding GST.
Widening of 1000 mm dia NP3 Humepipe culvert - Providing and laying 40 mm gauge brick ballast below pipe and in sides including cost of all materials T&P, labour cess but excluding GST.
Widening of 1000 mm dia NP3 Humepipe culvert - Supply of 1000 mm dia NP3 pipe including cost of all materials T&P, labour cess but excluding GST.
Widening of 1000 mm dia NP3 Humepipe culvert - laying & fixing of 1000 mm dia NP-3 pipe with collers including cost of all materials T&P, labour cess but excluding GST.
Widening of 1000 mm dia NP3 Humepipe culvert - Class 150 brick work in foundation and plinth with cement mortar 1:3 (1Cement :3 Coarse sand) including cost of all materials T&P, labour cess but excluding GST.
Widening of 1000 mm dia NP3 Humepipe culvert -Cement Pointing on Brick work with cement mortar 1:2 (1 Cement : 2 Fine sand) including cost of all materials T&P, labour cess but excluding GST.
Widening of 1000 mm dia NP3 Humepipe culvert - 12mm cement plaster in 1;3 cement & coarse sand mortar including cost of all materials T&P, labour cess but excluding GST.
Widening of 600 mm dia NP3 Hume pipe culvert-Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m including cost of all materials T&P, labour cess but excluding GST.
Widening of 600 mm dia NP3 Hume pipe culvert-Concrete with 4 cm. gauge stone ballast, Fine sand of 1.25 F.M. and cement in proportion of 8:4:1 in foundation and under floors, including supply of all materials, labour and T&P etc. required for proper completion of the work including cost of all materials T&P, labour cess but excluding GST.
Widening of 600 mm dia NP3 Hume pipe culvert-Providing and laying 40 mm gauge brick ballast below pipe and in sides including cost of all materials T&P, labour cess but excluding GST.
Widening of 600 mm dia NP3 Hume pipe culvert-Supply of 600 mm dia NP3 pipe including cost of all materials T&P, labour cess but excluding GST.
Widening of 600 mm dia NP3 Hume pipe culvert-laying & fixing of 600 mm dia NP-3 pipe with collers including cost of all materials T&P, labour cess but excluding GST.
Widening of 600 mm dia NP3 Hume pipe culvert-Class 150 brick work in foundation and plinth with cement mortar 1:3 (1Cement :3 Coarse sand) including cost of all materials T&P, labour cess but excluding GST.
Widening of 600 mm dia NP3 Hume pipe culvert- Cement Pointing on Brick work with cement mortar 1:2 (1 Cement : 2 Fine sand) including cost of all materials T&P, labour cess but excluding GST.
Widening of 600 mm dia NP3 Hume pipe culvert- 12mm cement plaster in 1;3 cement & coarse sand mortar including cost of all materials T&P, labour cess but excluding GST.
Construction of 350 mm dia NP3 Humepipe culvert -Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m including cost of all materials T&P, labour cess but excluding GST.
Construction of 350 mm dia NP3 Humepipe culvert -Providing and laying 40 mm gauge brick ballast below pipe and in sides including cost of all materials T&P, labour cess but excluding GST.
Construction of 350 mm dia NP3 Humepipe culvert -Supply of 350 mm dia NP3 pipe including cost of all materials T&P, labour cess but excluding GST.
Construction of 350 mm dia NP3 Humepipe culvert -laying & fixing of 350 mm dia NP-3 pipe with collers including cost of all materials T&P, labour cess but excluding GST.
Construction of U-Type Drain in abadi / Market portion-Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m including cost of all materials T&P, labour cess but excluding GST.
Construction of U-Type Drain in abadi / Market portion-Providing and laying in cement concrete 1:4:8 (1cement:4 fine sand:8graded stone ballast 40 mm nominal size) and curing complete including supply all materials, labour and T&P etc. required for proper completion of the work including cost of all materials T&P, labour cess but excluding GST.
Construction of U-Type Drain in abadi / Market portion-Providing and laying 20 mm gauge approved stone in M25 Concrete by laid over base concrete including supply all materials, curing , labour and T&P etc. required for proper completion of the work including cost of all materials T&P, labour cess but excluding GST.
Construction of U-Type Drain in abadi / Market portion-Reinforcement including labour cess but excluding GST.
Supply and fixing of kilometer /hectometer stone lettering and painting including cost of all material, labour, T&P etc including cost of all materials T&P, labour cess but excluding GST.
OM PRAKASH CHAUBEY
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid