Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹8.5 L+₹1.5 L (21.7%)Accepted-Finance | L2 | Accepted-Finance L2 | |
| 3 | L3₹8.9 L+₹1.9 L (26.4%)Accepted-Finance BASGO LADAKH AUTONOMOUS HILL DEVELOPMENT COUNCIL LEH LADAKH | LEH LADAKH | LADAKH | 194101 | L3 | Accepted-Finance L3 |
Tender Value
Refer Docs
Closing Date
23 Jul 2022, 4:00 pmClosed
Executive Engineer Civil Division-II PDC Leh
Executive Engineer Civil Division-II PDC Leh
Regular Enhancement and capacity optimization of the Power Canal by way of Periodical Maintenance right from Head works to Tailrace Outfall MHS Sumoor
2022_PDNRE_6947_2
NIT-06 CD-II/PDC/L/2022-23
Open Tender
Civil Works - Others
Item Rate
240 days
Sumoor Nubra
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Yes
Payable To Pay and Accounts Officer PDC Leh
Exempted
25 Jul 2022
22 Jul 2022
25 Jul 2022
22 Jul 2022
23 Jul 2022
22 Jul 2022
Amount
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
Dismantling old protection work including cutting of crates and stacking of stones.
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix)
Slip Clearance overburden on cut and cover power canal In soils; mixed with moorum /Kankar /shingle /boulders; disposal lead upto 50 m and lift upto 1.5 m.
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed.Lead upto 25 meter beyond 1 mfrom cutting edge
Dry stone pitching, 225mm thick, including cost of stones and preparation of surface. Nallah stone
Constructing vertical bunds with sloping faces, by boulder filling (dry,hand packed tightly); including cost of stones but excluding cost of wirecrates
Hand-packing stones in wire-crates; excluding cost of crates and stones
Dumping stone excluding cost of stones.in Horizontal on level
Making knitted wire crates of approved mesh-size; including weaving,binding sides and partitions, and binding top after filling; excluding cost of filling, stones and weaving materials
Add cost of crate at LMR in Nubra
Soling of stone : Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone
CEMENT CONCRETE (CAST-IN-SITU)Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Providing and laying upto floor v level reinforced cement concrete in kerbs, steps and the like including curing but excluding the cost of centering, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for:Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills,fillets etc upto floor V level, including curing but excluding the cost of centring, shutteringand finishing with. 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mmnominal size) Plum concrete in the ratio of 70:30 (70% concrete and 30% Stones)
20mm Cement plaster of mix:1 : 4 ( 1 cement : 4 coarse sand)
15mm cement plaster on the rough side of single or half brick wall finished with a floating coat of neat cement of mix :1 : 3 ( 1 cement : 3 fine sand)
20mm cement plaster finished with a floating coat of neat cement of mix : 1 : 3 ( 1 cement : 3 fine sand)
Silt clearance inside the canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively )
Carriage of Crates from leh to site Nubra
Strengthening of 02 no escape pipes by way of welding etc as required at site ( complete job )
Carriage of construction Material to Site MT (Cement and steel TMT bars from source to site of work ) by Mechanical means
Carriage of construction Material to Site MT (Sand, aggregate and stone from source to site of work ) by Mechanical means
Carriage of construction Material to Site MT (Cement and steel TMT bars from source to site of work ) by manual means headload including loading unloading and staking at site av 400m roughly
Carriage of construction Material to Site MT (Sand, aggregate and stone from source to site of work ) by manual means headload including loading unloading and staking at site av 400m roughly
M/S LOBZANG RIGZEN
M/S TSEWANG RIGZIN
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .