Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹10.8 L
EMD Value
₹11,000
Closing Date
8 Nov 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
blockdevelopmentofficerv.psivagangai
Unionofficesivagangai
DeepeningAnd DesiltingReconstructionOf WeirOfMalampattiPanchayat KatharKanmoiSFNO399
2022_RDTN_259423_1
SVG-MALAMPATTIKATHARKANMOI
Open Tender
Civil Works
Item Rate
Unionofficesivagangai
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹11,000
8 Nov 2022
31 Oct 2022
8 Nov 2022
31 Oct 2022
8 Nov 2022
31 Oct 2022
Amount
Deepening And Desilting,Reconstruction Of Weir Of Malampatti Panchayat Kathar Kanmoi(SF NO:399)
Clearing Juli Flora Jungle without Uprooting, Sl no 7 Item 9D
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete Sl no:86 Item no: 1
Tank Bund and Closing Add to relevant T.N.D.S.S no.20.A, rates for new Tank bund and closing Breaches for extra watering and consolidation By power roller including Hire Charges Sl.no;71 Item no:13
Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond
Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond
Supplying and filling in foundation and basement with filling sand including water consolidating etc.,
Cement concrete 1:4:8 mix using 40 mm IS specified grading and mixing by mixer machine including dewatering by bailing/pumping wherever necessary laying the concrete in layers and in bays with all leads and lifts vibrating, compacting and finishing the surface watering, curing including the cost components of providing rigid and smooth steel centering and strutting wherever necessary for various depth and height below and above ground level so as to attain the profile and strength specified in the drawings as per the direction of the Engineer and complying with standard specification.
Cement concrete 1:3:6 mix using 40 mm IS specified grading and mixing by mixer machine including dewatering by bailing/pumping wherever necessary laying the concrete in layers and in bays with all leads and lifts vibrating, compacting and finishing the surface watering, curing including the cost components of providing rigid and smooth steel centering and strutting wherever necessary for various depth and height below and above ground level so as to attain the profile and strength specified in the drawings as per the direction of the Engineer and complying with standard specification..
Cement concrete 1:3:6 mix using 40 mm IS specified grading and mixing by mixer machine including dewatering by bailing/pumping wherever necessary laying the concrete in layers and in bays with all leads and lifts vibrating, compacting and finishing the surface watering, curing including the cost components of providing rigid and smooth steel centering and strutting wherever necessary for various depth and height below and above ground level so as to attain the profile and strength specified in the drawings as per the direction of the Engineer and complying with standard specification..
Providing Centering and Chuttering including cost and conveyance of country wood and labour charges etc., Complete
For Centering Below ground level
for centering above g.l
Cement Concrete 1:2:4 mix using 40mm ISS HBG metal including all charges etc., complete
Supplying and fabrication of steel including cost and conveyance of
Refilling the basement with excavated earth other than sand complying the
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K.Rameshwari
VAITHILINGAM CONTRACTOR
M RAVICHANDRAN
S MUTHURAKKU
MANICKAM VAIRAVALLI
M JEGAN
P SEKAR
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .