Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC SECTOR 13 489 489 SECTOR 13 URBAN ESTATE 136118 | KURUKSHETRA | HARYANA | 136118 | ₹1.1 Cr | L1 | Accepted-AOC ok |
| 2 | L2₹1.1 Cr+₹74,577.48 (0.66%)Rejected-AOC | ₹1.1 Cr+₹74,577.48 (0.66%) | L2 | Rejected-AOC ok |
| 3 | L3₹1.2 Cr+₹8.5 L (7.52%)Rejected-AOC | ₹1.2 Cr+₹8.5 L (7.52%) | L3 | Rejected-AOC ok |
| 4 | L4₹1.5 Cr+₹36.6 L (32.5%)Rejected-AOC H NO 134 SECTOR 6 HANSI 125033 HARYANA HISAR | HANSI | HISAR | HARYANA | 125033 | ₹1.5 Cr+₹36.6 L (32.5%) | L4 | Rejected-AOC ok |
| 5 | L5₹1.5 Cr+₹39.5 L (35.1%)Rejected-AOC | ₹1.5 Cr+₹39.5 L (35.1%) | L5 | Rejected-AOC ok |
| Sl No | Description | Qty | Unit | THE JAGRAM BASS COOP L/C SOCIETY LTD. L7 | AJIT SINGH L5 | MUKESH KUMAR CONTRACOR L6 | SURENDER SINGH L8 | DALAL CONSTRUCTIONS AND MAN POWER SOLUTIONS L4 | MS ASHOKA CONSTRUCTION COMPANY L1 | KAVINDER CONTRACTOR L3 | DRRC INFRA PROJECTS PRIVATE LIMITED L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | 1 no job for removal of trees on banks and channel from forest deptt. @ 200000 | 1 | Nos. | 2,00,000 ₹2,00,000 | 2,00,000 ₹2,00,000 | 2,00,000 ₹2,00,000 | 2,00,000 ₹2,00,000 | 3,00,000 ₹3,00,000 | 1,40,000 ₹1,40,000 Lowest | 2,00,000 ₹2,00,000 | 1,41,500 ₹1,41,500 |
| 2.00 | SOLAR LIGHT WITH BATTERY PANNEL 100 W ITEM ARE NOT AVAILABLE IN THE HSR 2023. HENCE NS ITEM ARE REQUIRED TO ADD FOR THIS ITEM BY ANALYSING OF RATE ON LOWEST MARKET RATE MATERIAL PROVIDER BY COLLECTING QUOTATION OF THE THREE FIRMS MATERIAL PROVIDER | 16 | NO. | 10,400 ₹1,66,400 | 11,000 ₹1,76,000 | 10,400 ₹1,66,400 | 10,400 ₹1,66,400 | 14,500 ₹2,32,000 | 7,200 ₹1,15,200 Lowest | 10,400 ₹1,66,400 | 7,358 ₹1,17,728 |
Tender Value
₹1.6 Cr
EMD Value
₹3.2 L
Closing Date
6 Apr 2026, 9:00 amClosed
ANURAG GOYAL
Jui W.S. Divn. Bhiwani
Construction of reservoir to protect the agriculture land in land of village Bhakra from R.D 27000-L of Ch Bansilal Canal
2026_HRY_511645_1
20261FBAEFC2 EBC6 4758 987A 0C4B4B0A68DE128IRR
Open Tender
Civil Works
Works
120 days
BHAKRA
Construction of reservoir to protect the agriculture land in land of village Bhakra from R.D 27000-L of Ch Bansilal Canal
2 documents required · 2 mandatory
₹15,000
₹3.2 L
Yes
21 Apr 2026
30 Mar 2026
6 Apr 2026
30 Mar 2026
6 Apr 2026
30 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1 no job for removal of trees on banks and channel from forest deptt. @ 200000 | - | Nos. | 0.29 | - |
| 2SOLAR LIGHT WITH BATTERY PANNEL 100 W ITEM ARE NOT AVAILABLE IN THE HSR 2023. HENCE NS ITEM ARE REQUIRED TO ADD FOR THIS ITEM BY ANALYSING OF RATE ON LOWEST MARKET RATE MATERIAL PROVIDER BY COLLECTING QUOTATION OF THE THREE FIRMS MATERIAL PROVIDER | |||||
stage.html
html • 0.06 MB
technical_590442.pdf
techsummary_590442.pdf
BOQ Comparative Chart
xlsx
finsummary_590442.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_590442.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .