Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
9 Mar 2020, 2:00 pmClosed
Executive Engineer Hydraulic Division Kishtwar
Executive Engineer Hydraulic Division Kishtwar
please refer BOQ
2020_PHE_94064_1
e-NIT No.47 of 2019-20 Dated 02-03-2020
Open Tender
Civil Works
Item Rate
10 days
Kishtwar
please refer NIT
4 documents required · 4 mandatory
₹600
Yes
Executive Engineer Hydraulic Division Kishtwar
₹5,000
Yes
17 Mar 2020
2 Mar 2020
9 Mar 2020
2 Mar 2020
9 Mar 2020
2 Mar 2020
Amount
Constructing muthubunds,comprising boulders and wood bushes in alternate layers,including working in water conditions.
Earth work excavation over areas (exceeding 30 cm and up to 1.5mtr in depth 1. 5 Mtr, in width as well as 10 sqm. On plan) including disposal of excavated earth up to 1 mtr from cutting edge, disposed earth to be leveled and neatly dressed.100% all kinds of soil.
Slip clearance in ordinary soils disposal lead upto 50 m and lift upto 1.50 m.
Slip clearance in soil mixed with moorum / Kankar /Shingle/ boulders ,disposal lead upto 50 m and lift upto 1.50 m
Silt clearance from canals .Inclusive of initial lead and lift(50m&1.50 m respectively) Dry
Dry Random rubble masonry with hard stone in foundation and plinth. usingNallah stone without bond stone. Full rate
Labor rate.
Carriage of stone from source to site of work by manual labour/Ponies for an av. Distance of 1.00 km including loading unloading and stacking
Providing and laying in position cement concrete of specified grade, excluding the cost of centering, shuttering. All work up to plinth level. a) 1:3:6(1 cement: 3 coarse sand:6 graded stone aggregate 20 mm nominal size.
Providing and laying in-situ concrete lining using M-10 nominal mix concrete (maximum size of aggregate 20 mm nominal)
12 mm cement plaster of mix: 1:4(1 cement:4 fine sand)
Hand packing stones in wire crates, excluding cost of crates but including cost of stones.
Supply of 2nd class Kail wood in scants and in planks for wooden flumes
Supply of Iron sheets for wooden flumes.
Labour required for repair of wooden flumes regulation of water in khuls during crop season. 2nd Class Carpenter
Mazdoor.
Carriage of departmental supplies from Kishtwar to road side of work by mechanical transport including loading unloading and staking: For 47 km
For 28 km
Carriage of departmental supplies from side to site of work by manual labour/Ponies including loading unloading and staking: Cement For 16 km
For 1.50km.
Carriage of Sand and stone aggregate from source to site of work by manual labour/Ponies including loading unloading and stacking for 03 km
ARROV GROUP OF CONSTRUCTION
M/S Shees Group Of Construction
bagwan construction
FARIDIA CONSTRUCTION
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .