Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹75.6 LAccepted-AOC 273001 | GORAKHPUR | UTTAR PRADESH | 273001 | L1 | Accepted-AOC Quoted lowest amount | |
| 2 | L2₹76.0 L+₹37,858.60 (0.50%)Rejected-AOC 0 | L2 | Rejected-AOC Quoted higher rate than L1 | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹77.5 L
EMD Value
₹1.6 L
Closing Date
1 Mar 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE Sixth Circle IW Lucknow
Office of SE Sixth Circle IW Lucknow
Reconstruction of 8 No. VRB on Sonhar Dy. And its Minors
2023_UPIDC_770468_3
16/SE-6/2022-23(LOT-2)
Open Tender
Civil Works - Bridges
Item Rate
90 days
Unnao
As per pre qualification document
4 documents required · 4 mandatory
₹2,354
₹1.6 L
Yes
20 Mar 2023
23 Feb 2023
1 Mar 2023
23 Feb 2023
1 Mar 2023
23 Feb 2023
Amount
E/w in cutting in foundation of Culvert / Guide wall on channels Below 10 Cumecs including lead upto 30 M. And lift upto 1.5 M and disposal and back filling (For V.R.B. at Km 5.335 Sonhar Dy, V.R.B. at Km 1.035 of Shuklapur Mr.,V.R.B. at Km 3.451 of Pahutera Mr. & V.R.B. at Km 1.313 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
Laying Plain Cement Concrete (M -7.5) in foundation 1:4:8 with stone grit including cost of material, labour, T&p etc, complete (For V.R.B. at Km 5.335 Sonhar Dy, V.R.B. at Km 1.035 of Shuklapur Mr.,V.R.B. at Km 3.451 of Pahutera Mr. & V.R.B. at Km 1.313 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
Laying Plain Cement Concrete in foundation 1:4:8 with Brick Ballast including cost of material, labour, T&p etc, complete. (For V.R.B. at Km 5.335 Sonhar Dy, V.R.B. at Km 1.035 of Shuklapur Mr.,V.R.B. at Km 3.451 of Pahutera Mr. & V.R.B. at Km 1.313 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
Laying Plain Cement Concrete 1:6:12 with stone grit including cost of material, labour, T&p etc, complete.(For V.R.B. at Km 5.335 Sonhar Dy, V.R.B. at Km 1.035 of Shuklapur Mr.,V.R.B. at Km 3.451 of Pahutera Mr. & V.R.B. at Km 1.313 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
Class 150 Brick work in 1:4 CM including 3 M lift and 60 M lead including all cost of material, labour, T&P etc. complete.(For V.R.B. at Km 5.335 Sonhar Dy, V.R.B. at Km 1.035 of Shuklapur Mr.,V.R.B. at Km 3.451 of Pahutera Mr. & V.R.B. at Km 1.313 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
Centring and shuttering For R.C.C. Work including rent of shuttering & all cost of labour and material T&P etc. required for porper completion of the work/M2.(For V.R.B. at Km 5.335 Sonhar Dy, V.R.B. at Km 1.035 of Shuklapur Mr.,V.R.B. at Km 3.451 of Pahutera Mr. & V.R.B. at Km 1.313 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
Laying R.C.C (M -20)1:1.5:3 in Slab,Karb & Abetment Cap with stone grit including cost of material, labour, T&p etc, complete(For V.R.B. at Km 5.335 Sonhar Dy, V.R.B. at Km 1.035 of Shuklapur Mr.,V.R.B. at Km 3.451 of Pahutera Mr. & V.R.B. at Km 1.313 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
(Steel Reinforcement) Bending ,Binding, Cutting and Placing in position reinforcement including all cost of labour and material T&P etc. required for porper completion of the work/MT.(For V.R.B. at Km 5.335 Sonhar Dy, V.R.B. at Km 1.035 of Shuklapur Mr.,V.R.B. at Km 3.451 of Pahutera Mr. & V.R.B. at Km 1.313 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
Providing & Fixing 75 mm dia PVC weep holes complete in all respect including cost of all material, labour and T&P etc.(For V.R.B. at Km 5.335 Sonhar Dy, V.R.B. at Km 1.035 of Shuklapur Mr.& V.R.B. at Km 3.451 of Pahutera Mr. ) Workdone as per Drawing & direction of engineer-in-charge.
Making / Fixing of expansion joint (For V.R.B. at Km 5.335 Sonhar Dy, V.R.B. at Km 1.035 of Shuklapur Mr.,V.R.B. at Km 3.451 of Pahutera Mr. & V.R.B. at Km 1.313 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
JOINT FILLER BOARD INCLUDING ALL COST OF MATTERIAL LABOUR T&P ETC(For V.R.B. at Km 5.335 Sonhar Dy, V.R.B. at Km 1.035 of Shuklapur Mr.,V.R.B. at Km 3.451 of Pahutera Mr. & V.R.B. at Km 1.313 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
Cement Pointing in 1:2 cement mortar including all cost of material, labour, T&P etc complete.(For V.R.B. at Km 5.335 Sonhar Dy, V.R.B. at Km 1.035 of Shuklapur Mr.,V.R.B. at Km 3.451 of Pahutera Mr. & V.R.B. at Km 1.313 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
Supplying and fixing of Wheel Gard [(L-1100x300Dia,12mm 8 no. main bar,8mm Ring with RCC-M20) including ,Earth work and fixing in position with CC M20 (600x600x400mm) in 1:1.5:3 with stont grit .](For V.R.B. at Km 5.335 Sonhar Dy, V.R.B. at Km 1.035 of Shuklapur Mr.,V.R.B. at Km 3.451 of Pahutera Mr. & V.R.B. at Km 1.313 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
Supplying and fixing sign board [ On angle iron frame 40x40x6 mm 25x5 mm flat iron bracing sand 18 SWG (1.25mm)MS sheet with one coat of red oxide primer,Painting, Writing including Earth work and fixing in position with C:C M-10 (450x300x300mm) with stone grit .](For V.R.B. at Km 5.335 Sonhar Dy, V.R.B. at Km 1.035 of Shuklapur Mr.,V.R.B. at Km 3.451 of Pahutera Mr. & V.R.B. at Km 1.313 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
E/W IN MAKING APPROCH ROAD FOR DIVERSION INCLUDING ALL COST OF METTRIAL LABOUR T&P ETC (For V.R.B. at Km 5.335 Sonhar Dy, V.R.B. at Km 1.035 of Shuklapur Mr.,V.R.B. at Km 3.451 of Pahutera Mr. & V.R.B. at Km 1.313 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
E/W IN REMOVING/CUTTING OF DIVERSION INCLUDING WITH ALL COST OF METTRIAL LABOUR T&P ETC For (V.R.B. at Km 5.335 Sonhar Dy, V.R.B. at Km 1.035 of Shuklapur Mr.,V.R.B. at Km 3.451 of Pahutera Mr. & V.R.B. at Km 1.313 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
DISMANTELLING OF EXISTING DAMGED OLD STRUCTURE RCC Work INCLUDING WITH ALL COST OF METERIAL LABOUR T&P ETC.As per direction of Eng-in- charge (V.R.B. at Km 1.035 of Shuklapur Mr.,V.R.B. at Km 3.451 of Pahutera Mr. & V.R.B. at Km 1.313 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
Demolishing old brick work in Cement mortar manually/By mechanical means I/C stacking of unserviceable material withint 50 metres lead(V.R.B. at Km 5.335 Sonhar Dy, V.R.B. at Km 1.035 of Shuklapur Mr.,V.R.B. at Km 3.451 of Pahutera Mr. & V.R.B. at Km 1.313 of Parauli Mr.
F Painting (Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade New work (Two or more coats applied @ 1.67 ltr/ 10 sqm)( apex Ultima,wethercoat, all Gard)(For V.R.B. at Km 5.335 Sonhar Dy, V.R.B. at Km 1.035 of Shuklapur Mr.,V.R.B. at Km 3.451 of Pahutera Mr. & V.R.B. at Km 1.313 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
Dewatering at site (Hiring & engaging Diesel Pump of 5 H.P. with POL For Dewatering at site.Workdone as per direction of Engineer-in-charge.)(For V.R.B. at Km 5.335 Sonhar Dy, V.R.B. at Km 1.035 of Shuklapur Mr.& V.R.B. at Km 3.451 of Pahutera Mr. ) Workdone as per Drawing & direction of engineer-in-charge.
M-15 Brick on Eadge Pitching in 1:4 CM including preparation of sub grade including cost of Material,Labour T&P etc.(For V.R.B. at Km 5.335 Sonhar Dy, V.R.B. at Km 1.035 of Shuklapur Mr.,V.R.B. at Km 3.451 of Pahutera Mr. & V.R.B. at Km 1.313 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
E/w in cutting in foundation of Culvert / Guide wall on channels Below 10 Cumecs including lead upto 30 M. And lift upto 1.5 M and disposal and back filling as per Drawing & direction of engineer-in-charge.(For V.R.B. at Km 15.711, V.R.B. at Km 20.628 & V.R.B. at Km 21.972 of Sonhar Dy.) Workdone as per Drawing & direction of engineer-in-charge.
Laying Plain Cement Concrete (M -7.5) in foundation 1:4:8 with stone grit including cost of material, labour, T&p etc, complete.Workdone as per as per Drawing & direction of engineer-in-charge.(For V.R.B. at Km 15.711, V.R.B. at Km 20.628 & V.R.B. at Km 21.972 of Sonhar Dy.) Workdone as per Drawing & direction of engineer-in-charge.
Laying Plain Cement Concrete in foundation 1:4:8 with Brick Ballast including cost of material, labour, T&p etc, complete.Workdone as per as per Drawing & direction of engineer-in-charge(For V.R.B. at Km 15.711, V.R.B. at Km 20.628 & V.R.B. at Km 21.972 of Sonhar Dy.) Workdone as per Drawing & direction of engineer-in-charge..
Laying Plain Cement Concrete 1:6:12 with stone grit including cost of material, labour, T&p etc, complete.Workdone as per as per Drawing & direction of engineer-in-charge.(For V.R.B. at Km 15.711, V.R.B. at Km 20.628 & V.R.B. at Km 21.972 of Sonhar Dy.) Workdone as per Drawing & direction of engineer-in-charge.
Class 150 Brick work in 1:4 CM including 3 M lift and 60 M lead including all cost of material, labour, T&P etc. complete.Workdone as per Drawing & direction of engineer-in-charge.(For V.R.B. at Km 15.711, V.R.B. at Km 20.628 & V.R.B. at Km 21.972 of Sonhar Dy.) Workdone as per Drawing & direction of engineer-in-charge.
Centring and shuttering For R.C.C. Work including rent of shuttering & all cost of labour and material T&P etc. required for porper completion of the work/M2.For bridge slab above 3.00m span.Workdone as per as per Drawing & direction of engineer-in-charge.(For V.R.B. at Km 15.711, V.R.B. at Km 20.628 & V.R.B. at Km 21.972 of Sonhar Dy.) Workdone as per Drawing & direction of engineer-in-charge.
Laying R.C.C (M -20)1:1.5:3 in Slab,Karb & Abetment Cap with stone grit including cost of material, labour, T&p etc, complete.Workdone as per as per Drawing & direction of engineer-in-charge.(For V.R.B. at Km 15.711, V.R.B. at Km 20.628 & V.R.B. at Km 21.972 of Sonhar Dy.) Workdone as per Drawing & direction of engineer-in-charge.
(Steel Reinforcement) Bending ,Binding, Cutting and Placing in position reinforcement including all cost of labour and material T&P etc. required for porper completion of the work/MT.Workdone as per as per Drawing & direction of engineer-in-charge.(For V.R.B. at Km 15.711, V.R.B. at Km 20.628 & V.R.B. at Km 21.972 of Sonhar Dy.) Workdone as per Drawing & direction of engineer-in-charge.
Providing & Fixing 75 mm dia PVC weep holes complete in all respect including cost of all material, labour and T&P etc. Workdone as per as per Drawing & direction of engineer-in-charge.(For V.R.B. at Km 15.711, V.R.B. at Km 20.628 & V.R.B. at Km 21.972 of Sonhar Dy.) Workdone as per Drawing & direction of engineer-in-charge.
Making / Fixing of expansion joint (For V.R.B. at Km 15.711, V.R.B. at Km 20.628 & V.R.B. at Km 21.972 of Sonhar Dy.) Workdone as per Drawing & direction of engineer-in-charge.
JOINT FILLER BOARD INCLUDING ALL COST OF MATTERIAL LABOUR T&P ETC (For V.R.B. at Km 15.711, V.R.B. at Km 20.628 & V.R.B. at Km 21.972 of Sonhar Dy.) Workdone as per Drawing & direction of engineer-in-charge.
Cement Pointing in 1:2 cement mortar including all cost of material, labour, T&P etc complete.(For V.R.B. at Km 15.711, V.R.B. at Km 20.628 & V.R.B. at Km 21.972 of Sonhar Dy.) Workdone as per Drawing & direction of engineer-in-charge.
Supplying and fixing of Wheel Gard [(L-1100x300Dia,12mm 8 no. main bar,8mm Ring with RCC-M20) including ,Earth work and fixing in position with CC M20 (600x600x400mm) in 1:1.5:3 with stont grit .](all work Done as par direction of Engineer-in- charge) including cost of all material, Labour T&P etc (For V.R.B. at Km 15.711, V.R.B. at Km 20.628 & V.R.B. at Km 21.972 of Sonhar Dy.) Workdone as per Drawing & direction of engineer-in-charge..
Supplying and fixing sign board [ On angle iron frame 40x40x6 mm 25x5 mm flat iron bracing sand 18 SWG (1.25mm)MS sheet with one coat of red oxide primer,Painting, Writing including Earth work and fixing in position with C:C M-10 (450x300x300mm) with stone grit .](For V.R.B. at Km 15.711, V.R.B. at Km 20.628 & V.R.B. at Km 21.972 of Sonhar Dy.) Workdone as per Drawing & direction of engineer-in-charge.
E/W IN MAKING APPROCH ROAD FOR DIVERSION INCLUDING ALL COST OF METTRIAL LABOUR T&P ETC.(For V.R.B. at Km 15.711, V.R.B. at Km 20.628 & V.R.B. at Km 21.972 of Sonhar Dy.) Workdone as per Drawing & direction of engineer-in-charge.
E/W IN REMOVING/CUTTING OF DIVERSION INCLUDING WITH ALL COST OF METTRIAL LABOUR T&P ETC.(For V.R.B. at Km 15.711, V.R.B. at Km 20.628 & V.R.B. at Km 21.972 of Sonhar Dy.) Workdone as per Drawing & direction of engineer-in-charge.
DISMANTELLING OF EXISTING DAMGED OLD STRUCTURE RCC Work INCLUDING WITH ALL COST OF METERIAL LABOUR T&P ETC.(For V.R.B. at Km 15.711, V.R.B. at Km 20.628 & V.R.B. at Km 21.972 of Sonhar Dy.) Workdone as per Drawing & direction of engineer-in-charge.
Demolishing old brick work in Cement mortar manually/By mechanical means I/C stacking of unserviceable material withint 50 metres lead (For V.R.B. at Km 15.711, V.R.B. at Km 20.628 & V.R.B. at Km 21.972 of Sonhar Dy.) Workdone as per Drawing & direction of engineer-in-charge.
F Painting (Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade New work (Two or more coats applied @ 1.67 ltr/ 10 sqm)( apex Ultima,wethercoat, all Gard)(For V.R.B. at Km 15.711, V.R.B. at Km 20.628 & V.R.B. at Km 21.972 of Sonhar Dy.) Workdone as per Drawing & direction of engineer-in-charge.
Dewatering at site (Hiring & engaging Diesel Pump of 5 H.P. with POL For Dewatering at site.Workdone as per direction of Engineer-in-charge.)(For V.R.B. at Km 15.711, V.R.B. at Km 20.628 & V.R.B. at Km 21.972 of Sonhar Dy.) Workdone as per Drawing & direction of engineer-in-charge.
M-15 Brick on Eadge Pitching in 1:4 CM including preparation of sub grade including cost of Material,Labour T&P etc.(For V.R.B. at Km 15.711, V.R.B. at Km 20.628 & V.R.B. at Km 21.972 of Sonhar Dy.) Workdone as per Drawing & direction of engineer-in-charge.
E/w in cutting in foundation of Culvert / Guide wall on channels Below 10 Cumecs including lead upto 30 M. And lift upto 1.5 M and disposal and back filling (For V.R.B. at Km 3.150 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
Laying Plain Cement Concrete (M -7.5) in foundation 1:4:8 with stone grit including cost of material, labour, T&p etc, complete.(For V.R.B. at Km 3.150 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
Laying Plain Cement Concrete in foundation 1:4:8 with Brick Ballast including cost of material, labour, T&p etc, complete.(For V.R.B. at Km 3.150 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
Laying Plain Cement Concrete 1:6:12 with stone grit including cost of material, labour, T&p etc, complete.(For V.R.B. at Km 3.150 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
Class 150 Brick work in 1:4 CM including 3 M lift and 60 M lead including all cost of material, labour, T&P etc. complete.(For V.R.B. at Km 3.150 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
Centring and shuttering For R.C.C. Work including rent of shuttering & all cost of labour and material T&P etc. required for porper completion of the work/M2.(For V.R.B. at Km 3.150 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
Laying R.C.C (M -20)1:1.5:3 in Slab,Karb & Abetment Cap with stone grit including cost of material, labour, T&p etc, complete.(For V.R.B. at Km 3.150 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
(Steel Reinforcement) Bending ,Binding, Cutting and Placing in position reinforcement including all cost of labour and material T&P etc. required for porper completion of the work/MT.(For V.R.B. at Km 3.150 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
Providing & Fixing 75 mm dia PVC weep holes complete in all respect including cost of all material, labour and T&P etc. (For V.R.B. at Km 3.150 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
Making / Fixing of expansion joint For V.R.B. at Km 3.150 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
JOINT FILLER BOARD INCLUDING ALL COST OF MATTERIAL LABOUR T&P ETC (For V.R.B. at Km 3.150 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
Cement Pointing in 1:2 cement mortar including all cost of material, labour, T&P etc complete.(For V.R.B. at Km 3.150 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
Supplying and fixing of Wheel Gard [(L-1100x300Dia,12mm 8 no. main bar,8mm Ring with RCC-M20) including ,Earth work and fixing in position with CC M20 (600x600x400mm) in 1:1.5:3 with stont grit .](For V.R.B. at Km 3.150 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
Supplying and fixing sign board [ On angle iron frame 40x40x6 mm 25x5 mm flat iron bracing sand 18 SWG (1.25mm)MS sheet with one coat of red oxide primer,Painting, Writing including Earth work and fixing in position with C:C M-10 (450x300x300mm) with stone grit .](For V.R.B. at Km 3.150 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
E/W IN MAKING APPROCH ROAD OF DIVERSION INCLUDING ALL COST OF METTRIAL LABOUR T&P ETC.(For V.R.B. at Km 3.150 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
E/W IN REMOVING/CUTTING OF DIVERSION INCLUDING WITH ALL COST OF METTRIAL LABOUR T&P ETC.(For V.R.B. at Km 3.150 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
DISMANTELLING OF EXISTING DAMGED OLD STRUCTURE RCC Work INCLUDING WITH ALL COST OF METERIAL LABOUR T&P ETC.(For V.R.B. at Km 3.150 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
Demolishing old brick work in Cement mortar manually/By mechanical means I/C stacking of unserviceable material withint 50 metres lead (For V.R.B. at Km 3.150 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
F Painting (Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade New work (Two or more coats applied @ 1.67 ltr/ 10 sqm)( apex Ultima,wethercoat, all Gard)(For V.R.B. at Km 3.150 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
Dewatering at site (Hiring & engaging Diesel Pump of 5 H.P. with POL For Dewatering at site.(For V.R.B. at Km 3.150 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
M-15 Brick on Eadge Pitching in 1:4 CM including preparation of sub grade including cost of Material,Labour T&P etc.(For V.R.B. at Km 3.150 of Parauli Mr.) Workdone as per Drawing & direction of engineer-in-charge.
M/S RAJ CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .