| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.4 LAccepted-Finance | L1 | Accepted-Finance BOQ Accepted | |
| 2 | Rejected-Technical | - | Rejected-Technical BQR No.2 - 24-25 Turn over not enclosed |
| Sl No | Description | Qty | Unit | SANTHANAKUMAR ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00 | Charges for removal , cleaning and disposal of spillage and accumulated coal daily in the conveyor 25 A/B areas, Including cost of consumables. T&P s hire charges etc., complete | 175 | Operation | 8,57,500 ₹10,11,850 Lowest |
| 2.00 | Charges for Monitoring and renewal of the running equipments of conveyor 25A/B. And its auxillary equipments, floors simple maintenance works, (Example: damaged idler,idler frame, replacement, damaged skirt rubber, return scrapper replacement , Oil changing/ Oil top up/ Oil checking, minor chock removal etc) to keep the equipments in running condition and other related works in shift duties etc., complete. | 525 | Operation | 10,50,000 ₹12,39,000 Lowest |
| 3.00 | Charges for assisting works for belt joint in conveyor 25A/B including arresting the belt by providing clamps lifting the counter weight dismantling the idlers and idler frames and skirt board assembly and re-fixing the same after vulcanizing the joint including T&P hire charges cost of consumables etc., complete. | 4 | Nos. | 2,08,000 ₹2,45,440 Lowest |
| 4.00 | Charges for assisting works for pulley lagging works in conveyor 25A/B including arresting the conveyor belt lifting the counter weight and normalizing the system after pulley lagging, trial operation including T&P hire charges cost of consumables etc., complete. | 2 | Nos. | 1,04,000 ₹1,22,720 Lowest |
| 5.00 | Charges for overhauling and inspection of pulley bearings and replacement if necessary in tail pulley / tail snub pulley /bend pulley /take up movable pulley in conveyor 25A/B including arresting the conveyor belt lifting the counter weight and normalizing the system after bearing overhauling, trial operation including the cost of consumables, T&P hire charges etc., complete. | 2 | Operation | 1,68,000 ₹1,98,240 Lowest |
| 6.00 | Charges for overhauling and inspection of pulley bearings and replacement if necessary in head pulley / head snub pulley in conveyors 25A/B including arresting the conveyor belt lifting the counter weight and normalizing the system after trial operation including T&P hire charges and cost of consumables etc., complete. | 1 | Operation | 90,000 ₹1,06,200 Lowest |
| 7.00 | Charges for overhauling and inspection of gear coupling in conveyor-25A/B & replacement of necessary including arresting the conveyor belt lifting the counter weight dismantling the gear coupling removal of old grease, cleaning the gear teethes, arranged for inspection, packing the new grease and normalizing the system after trial operation including T&P hire charges, cost of consumables etc., complete. | 1 | Operation | 67,000 ₹79,060 Lowest |
Tender Value
Refer Docs
EMD Value
₹20,600
Closing Date
21 Sept 2026, 2:00 pmClosed
Chief Engineer/TTPS
O/o CE/TTPS
ICHP- Removal, cleaning and disposal of the spilled and accumulated coal in Conveyor-25A B area, conveyor equipments, inspection pulley bearings periodical greasing, assisting for conveyor cut and joint, pulley lagging
2026_EB_701769_1
CE/TTPS/SE/MI/103/2026-2027
Open Tender
Miscellaneous Works
Works
180 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹20,600
Yes
25 Sept 2026
5 Sept 2026
22 Sept 2026
5 Sept 2026
21 Sept 2026
5 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for removal , cleaning and disposal of spillage and accumulated coal daily in the conveyor 25 A/B areas, Including cost of consumables. T&P s hire charges etc., complete | 175 | Operation | 55 | ₹9,625 |
| 2 | Charges for Monitoring and renewal of the running equipments of conveyor 25A/B. And its auxillary equipments, floors simple maintenance works, (Example: damaged idler,idler frame, replacement, damaged skirt rubber, return scrapper replacement , Oil changing/ Oil top up/ Oil checking, minor chock removal etc) to keep the equipments in running condition and other related works in shift duties etc., complete. | 525 | Operation | 55 | ₹28,875 |
| 3 | Charges for assisting works for belt joint in conveyor 25A/B including arresting the belt by providing clamps lifting the counter weight dismantling the idlers and idler frames and skirt board assembly and re-fixing the same after vulcanizing the joint including T&P hire charges cost of consumables etc., complete. | 4 | Nos. | 55 | ₹220 |
| 4 | Charges for assisting works for pulley lagging works in conveyor 25A/B including arresting the conveyor belt lifting the counter weight and normalizing the system after pulley lagging, trial operation including T&P hire charges cost of consumables etc., complete. | 2 | Nos. | 55 | ₹110 |
| 5 | Charges for overhauling and inspection of pulley bearings and replacement if necessary in tail pulley / tail snub pulley /bend pulley /take up movable pulley in conveyor 25A/B including arresting the conveyor belt lifting the counter weight and normalizing the system after bearing overhauling, trial operation including the cost of consumables, T&P hire charges etc., complete. | 2 | Operation | 55 | ₹110 |
| 6 | Charges for overhauling and inspection of pulley bearings and replacement if necessary in head pulley / head snub pulley in conveyors 25A/B including arresting the conveyor belt lifting the counter weight and normalizing the system after trial operation including T&P hire charges and cost of consumables etc., complete. | 1 | Operation | 55 | ₹55 |
| 7 | Charges for overhauling and inspection of gear coupling in conveyor-25A/B & replacement of necessary including arresting the conveyor belt lifting the counter weight dismantling the gear coupling removal of old grease, cleaning the gear teethes, arranged for inspection, packing the new grease and normalizing the system after trial operation including T&P hire charges, cost of consumables etc., complete. | 1 | Operation | 55 | ₹55 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
BOQ_843555.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .