| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-AOC | ₹2.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.7 CrRejected-Finance | ₹2.7 Cr | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | JAI ENGINEERING L2 | THE INDIA POWER FUTURE L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. In Hard stiff clay, stiff black cotton, hard red earth,, shales, murram, stoney earth and earth mixed with small size boulders SS 20 B | 1,016 | M3 | 100 ₹1.0 L | 250 ₹2.5 L |
| 2.00 | Supplying and filling with filling sand in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification | 95 | M3 | 2,000 ₹1.9 L | 1,500 ₹1.4 L |
| 3.00 | Laying PCC 1:4:8 mix using 40mm HBG machine crushed metal concrete including cost of all labour, materials, lead, lift, curing etc. Complete. | 95 | M3 | 5,000 ₹4.8 L | 5,000 ₹4.8 L |
| 4.00 | R:C:C 1:1.5:3 using 12 to 20mm metal without form work including cost of all materials,curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site. | 347 | M3 | 11,000 ₹38.2 L | 10,600 ₹36.8 L |
| 5.00 | R:C:C 1:1.5:3 using 12 to 20mm HBG metal with form work including cost of all materials, curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site. | 362 | M3 | 18,000 ₹65.2 L | 11,200 ₹40.5 L |
| 6.00 | Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire etc.complete. | 49.7 | MT | 70,000 ₹34.8 L | 71,000 ₹35.3 L |
| 7.00 | Laying PCC 1:2:4 mix using 12-20mm HBG machine crushed metal without formwork for concrete including cost of all labour, materials, lead, lift, curing etc. Complete. | 265 | M3 | 9,000 ₹23.9 L | 7,500 ₹19.9 L |
| 8.00 | Laying PCC 1:2:4 mix using 12-20mm HBG machine crushed metal with form work for concrete including cost of all labour, materials, lead, lift, curing etc. Complete. | 213 | M3 | 10,000 ₹21.3 L | 8,500 ₹18.1 L |
| 9.00 | Transporting of Kerb stones , Placing in position, alingnment, includign cost of all materials labour charges lead, lift, etc., complete | 600 | Nos | 300 ₹1.8 L | 300 ₹1.8 L |
| 10.00 | Supplying, fabricating in M.S angle including cost of MS angle ,Flats , as per drawing and specification and galvanising ,placing in position , including cost of all materials, galvanizing charges , transportation, labour, lead, lift etc complete as directed by the dept. Engr at site | 1,642 | Kg | 100 ₹1.6 L | 150 ₹2.5 L |
Tender Value
Refer Docs
EMD Value
₹2.1 L
Closing Date
15 Dec 2025, 2:30 pmClosed
CE/TP-I/CNI
230 kv GIS SS Guindy chennai 32
Providing 110 kv 33 yard equipment plinth cable duct fire wall protection At Soorapoondi 110 33 kv ss
2025_EB_628314_1
TP1-110/2025-26 OF CE/TP-I/CNI
Open Tender
Civil Works - Others
120 days
Soorapoondi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2.1 L
8 Apr 2026
2 Dec 2025
16 Dec 2025
2 Dec 2025
15 Dec 2025
2 Dec 2025
Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. In Hard stiff clay, stiff black cotton, hard red earth,, shales, murram, stoney earth and earth mixed with small size boulders SS 20 B
Supplying and filling with filling sand in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification
Laying PCC 1:4:8 mix using 40mm HBG machine crushed metal concrete including cost of all labour, materials, lead, lift, curing etc. Complete.
R:C:C 1:1.5:3 using 12 to 20mm metal without form work including cost of all materials,curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site.
R:C:C 1:1.5:3 using 12 to 20mm HBG metal with form work including cost of all materials, curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site.
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire etc.complete.
Laying PCC 1:2:4 mix using 12-20mm HBG machine crushed metal without formwork for concrete including cost of all labour, materials, lead, lift, curing etc. Complete.
Laying PCC 1:2:4 mix using 12-20mm HBG machine crushed metal with form work for concrete including cost of all labour, materials, lead, lift, curing etc. Complete.
Transporting of Kerb stones , Placing in position, alingnment, includign cost of all materials labour charges lead, lift, etc., complete
Supplying, fabricating in M.S angle including cost of MS angle ,Flats , as per drawing and specification and galvanising ,placing in position , including cost of all materials, galvanizing charges , transportation, labour, lead, lift etc complete as directed by the dept. Engr at site
Brick work in CM 1:5 using all ll Class Ground Moulded Chamber Burnt bricks including the cost of all materilas , lead, lift, labour, Centering Charges T&P etc., complete as directed by the Engineers at site.
Plastering with cm 1:5 mix using 12mm thick including cost of all materials, labour, lead, lift etc complete as directed by the Engineers at site.
Fabriaction, galvanising and supply of foundation bolts of various sizes and nuts with 2 nos. washer in Galvanized Steel including 10 cm L at bottom and 15 cm threading with 2 nuts and washers at top including cost of all materials, labour, lead, lift etc. complete.as directed by the dept. Engineer at site
Providing Grout holes for equipment structures including cost of all materials, form work , labour, lead, lift etc. complete.
Fabrication of Template and assembling in correct position for various equipment plinth and grouting the foundation bolts including cost of all materials, labour, lead, lift etc. complete.as directed by the dept. Engineer at site
Colour washing and Painting 2 coats with approved Plastic Emulsion paint over one priming coat of plastic emulsion paint over cement plastered wall surface, ceiling and other new surface and including cleaning ,preparing the surface and curing etc.complete.
Providing, Transporting and fixing of 90 lbs rail in correct position and level as directed by dept.Engineer at site including cost of Rail ,cutting charges, transport to site etc. complete.
Supply and erection of 1.50 H.P Mono block drain pump with motor, foot valve , hose, panel Board ,main switch ,all accessoris etc .incuding cost of motor,erection charges ,wiring all labour lead and lift etc. complete.
Gravel Filling including cost of gravel,transport charges, spreading and consolidation of each layer 300 mm with power roller , labour, lead, lift etc., complete.as directed by dept. Engineer at Site
CGST in % (For Bidders inside TamilNadu)
SGST in % (For Bidders inside TamilNadu)
IGST in % (For Bidders outside TamilNadu)
stage.html
html • 0.04 MB
techsummary_751241.pdf
BOQ Comparative Chart
xlsx
finsummary_751241.pdf
Award110.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
BOQ_751241.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid