| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.6 LAccepted-Finance | ₹4.6 L | L-1 | Accepted-Finance ACCEPTED |
| 2 | L-2₹4.8 LAccepted-Finance | ₹4.8 L | L-2 | Accepted-Finance ACCEPTED |
| 3 | L-3₹5.3 LAccepted-Finance | ₹5.3 L | L-3 | Accepted-Finance ACCEPTED |
| 4 | L-4₹5.4 LAccepted-Finance | ₹5.4 L | L-4 | Accepted-Finance ACCEPTED |
| Sl No | Description | Qty | Unit | M/S EKTA SERVICES L4 | Chirakshi Construction Co. L1 | ABS Infra L2 | NISHANT BANSAL L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 3.31 | Cum | 1,500 ₹4,965 | 500 ₹1,655 | 500 ₹1,655 | 80 ₹264.8 Lowest |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources). | 3.31 | Cum | 6,500 ₹21,515 | 7,200 ₹23,832 | 5,850 ₹19,363.5 Lowest | 6,500 ₹21,515 |
| 3.00 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 1,993.56 | Kg | 150 ₹2,99,034 | 105 ₹2,09,323.8 Lowest | 115 ₹2,29,259.4 | 130 ₹2,59,162.8 |
| 4.00 | Welding by gas or electric plant including transportation of plant at site etc. complete. | 2,507.53 | CM | 15 ₹37,612.95 | 3.3 ₹8,274.85 Lowest | 10 ₹25,075.3 | 20 ₹50,150.6 |
| 5.00 | Applying priming coat: With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel work (second coat). | 278.7 | Sqm | 100 ₹27,870 | 30 ₹8,361 Lowest | 100 ₹27,870 | 155 ₹43,198.5 |
| 6.00 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work. | 309.61 | Sqm | 130 ₹40,249.3 | 120 ₹37,153.2 Lowest | 120 ₹37,153.2 Lowest | 160 ₹49,537.6 |
| 7.00 | Plantation of Grass (selection No.1 Doob grass including watering and maintenance of the lawn for 30 days). | 1,581.62 | Sqm | 30 ₹47,448.6 Lowest | 70 ₹1,10,713.4 | 35 ₹55,356.7 | 50 ₹79,081 |
| 8.00 | Cost for Land preparation, with good earth, manure. Pulverisation, Fertilizers, Insecticides for 1581.62 sqm. | 1 | Job | 40,000 ₹40,000 | 40,000 ₹40,000 | 55,000 ₹55,000 | 12,000 ₹12,000 Lowest |
| 9.00 | Labour charges for watering, maintenance etc. For Two Months. | 1 | Job | 25,000 ₹25,000 | 20,000 ₹20,000 Lowest | 30,000 ₹30,000 | 20,000 ₹20,000 Lowest |
Tender Value
₹5.0 L
EMD Value
₹4,992
Closing Date
2 Jul 2026, 12:00 pmClosed
Executive Engineer
O and M Division 220 KV Substation Punjabi Bagh BBMB Delhi 110035
Land scapping along with Mtc footpath and fencing in open area available in RB and NRB complex at 220KV Sub-station BBMB Punjabi Bagh Delhi.
2026_BBMB_276470_1
ENIT-05/OMD/2026-27
Open Tender
Civil Works
Item Rate
90 days
220 KV Delhi Substation
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹4,992
7 Jul 2026
5 May 2026
3 Jul 2026
5 May 2026
2 Jul 2026
5 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 3.31 | Cum | - | - |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources). | 3.31 | Cum | - | - |
| 3 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 1,993.56 | Kg | - | - |
| 4 | Welding by gas or electric plant including transportation of plant at site etc. complete. | 2,507.53 | CM | - | - |
| 5 | Applying priming coat: With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel work (second coat). | 278.7 | Sqm | - | - |
| 6 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work. | 309.61 | Sqm | - | - |
| 7 | Plantation of Grass (selection No.1 Doob grass including watering and maintenance of the lawn for 30 days). | 1,581.62 | Sqm | - | - |
| 8 | Cost for Land preparation, with good earth, manure. Pulverisation, Fertilizers, Insecticides for 1581.62 sqm. | 1 | Job | - | - |
| 9 | Labour charges for watering, maintenance etc. For Two Months. | 1 | Job | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
DNIT.pdf
Tender Documents • 1.36 MB
BOQ_322943.xls
BOQ • 0.32 MB
corrigendum1.pdf
PDF • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].