Loading…
Loading…
Tender Value
₹56.0 L
EMD Value
₹1.2 L
Closing Date
3 Sept 2026, 4:00 pmClosed
Executive Engineer
HPPWD Division Chowari
Const. of 3.00 Mtr. Span culvert at Rd 4/015 and C/o R-wall and wire crate work in between Km 1/297 to 3/194
2026_PWD_142283_2
NIT No. 5410-60 dated 28.08.2026
Open Tender
Civil Works - Roads
Percentage
60 days
Chowari
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,000
₹1.2 L
2 Sept 2026
29 Aug 2026
3 Sept 2026
29 Aug 2026
3 Sept 2026
29 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for all type of road structure such as retaining walls, breast walls, culverts, drains and parapets etcetera in all type of classification of soil, comprising of ordinary soil, ordinary rock, hard rock chiseling / wedging out rocks (where blasting is prohibited) as per drawings and MORD technical specification clause 305.1 and as per the directions of the Engineer-in-Charge including setting out, shoring and bracing, removal of stumps and other deleterious materials and disposal of materials upto any lead and upto any lift including dressing of sides and bottom and back filling in trenches with excavated suitable / approved materials to the original surface in layers not exceeding 150 mm (one hundred fifty millimeters) compacted thickness including shoring and strutting and pumping and bailing out water (surface and sub soil water) upto any depth and any quantum of water including cleaning of slush which may arise out during dewatering as per directions of Engineer-in-Charge including carriage of materials within all leads, lifts and other incidentals. The rate including the octori, royality, Malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 432.16 | Per Cubic Metre | 559.2 | ₹2,41,663.87 |
| 2 | Providing and laying plain cement concrete 1:3:6 (one cement isto three sand isto six graded crushed stone aggregate 40 millimeter (forty millimeter) nominal size including the cost of form work and curing complete as per drawing and M.O.R.D technical specifications clause 802, 803, 1202 and 1203 or as per direction of Engineer-In-Charge including carriage of materials with in all leads, lifts and other incidentals.The rate including the octori, royality, Malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 9.61 | Per Cubic Metre | 6,376.2 | ₹61,275.28 |
| 3 | Providing and laying mechnically mixed and vibrated concrete for plain cement concrete grade M-20 (M-Twenty) Design mix with cement contents not less than three hundred thirty kilogram per cubic metre and using graded crushed stone aggregate 20 mm (twenty millimetre) nominal size} in open foundation including curing and cost of form work as per drawings and MORD technical specifications calsue 802, 803, 1202 and 1203 or as per direction of Engineer-In-Charge including carriage of materials within all leads and lifts and other incidentals. The rate including the octori, royality, Malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 94.08 | Per Cubic Metre | 7,141.5 | ₹6,71,872.32 |
| 4 | Providing and laying plain cement concrete grade M-15 (1:2.5:5) (one cement isto two point five sand isto five graded) in substructure complete including the cost of form work and curing complete as per drawing and M.O.R.D technical specifications clause 802, 804, 805, 806, 807, 1202 & 1204 nominal mix and as per directions of Engineer-in-Charge including carriage of materials within all leads, lifts and other incidentals. The rate including the octori, royality, Malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 12.94 | Per Cubic Metre | 6,892.8 | ₹89,192.83 |
| 5 | Providing and laying 150 mm (one hundred fifty millimetre) thick rubble stones flooring laid in cement mortar 1:3 ( one cement: three sand) over and inclusive of cost of cement concrete bedding fifteen centimeter thick of M10 grade concrete complete as per drawing and MORD technical specifications for Rural Roads clause 1303 including hauling of materials in all leads and lifts and other incidentals. The rate including the octori, royality, Malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 5.8 | Per Cubic Metre | 11,413.4 | ₹66,197.72 |
| 6 | Providing and laying mechanically mixed and vibrated reinforced cement concrete in Sub structure as per drawing and MORD technical specification Section 802, 804, 805 and 806, 807,1202 and 1204; RCC grade M-20 (twenty twenty) Design mix with cement contents not less than three hundredfifty killograme per cubic metre and using graded crushed stone aggregate 20 mm (twenty millimetre) nominal size}, curing complete including cost of form work but excluding the cost of reinforcement for reinforced concrete work in Bed Block etcetra including carriage of materials within all leads and lifts and other incidental. The rate including the octori, royality, Malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 3.5 | Per Cubic Metre | 7,141.5 | ₹24,995.25 |
| 7 | Providing and laying mechanically mixed and vibrated Plain/reinforced cement concrete in super structure as per drawing and MORD technical specification Section 800, 1205.4 and 1205.5 RCC grade M-25 (twenty five) Design mix with cement contents not less than four hundred kg per cubic metre and using graded crushed stone aggregate 20 mm (twenty millimetre) nominal size}, curing complete including cost of form work but excluding the cost of reinforcement for reinforced concrete work in Deck slabs , wheel guard etcetra including carriage of materials within all leads and lifts and other incidental. The rate including the octori, royality, Malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 8.32 | Per Cubic Metre | 8,605.2 | ₹71,595.26 |
| 8 | Providing and laying mechanically mixed and vibrated cement concrete grade M-30 (M-thirty) design mix with cemnt contents not less than four hundred thirty killogram per cubic metre in super-structure as per drawing and MORD technical specification Sections 800 & 1400 including the cost of form work and the cost of reinforcement for reinforced concrete work in wearing coat and curing complete including hauling of materials in all leads and lifts and other incidental. The rate including the octori, royality, Malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 2.74 | Per Cubic Metre | 8,641.3 | ₹23,677.16 |
| 9 | Providing HYSD bar reinforcement in all type structure complete as per drawing and MORD technical specifications Section 1002, 1010 and 1202 including cutting, bending, binding and placing in position complete in all respect including cost of binding wire and carriage of materials within all leads and lifts and other incidental. The rate including the octori, royality, Malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | - | Per Tonne | 97,864.6 | - |
| 10 | Back filling with granular material behind abutments, return walls, wing walls and retaining walls complete as per drawings and MORD technical specification clause 1204.3.8 or as directed by the Engineer-in-Charge, including carriage of materials within all leads, lifts and other incidental. The rate including the octori, royality, Malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | - | Per Cubic Metre | 1,485.7 | - |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.45 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
sbd2.pdf
Tender Documents • 3.18 MB
BOQ_211366.xls
BOQ • 0.27 MB
corrigendum.pdf
PDF • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .