Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.3 LAccepted-AOC | ₹46.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹50.0 LRejected-Finance 173 BIHARI PURA GALI NO 4 KAMLA CINEMA VIJAY NAGAR GHAZIABAD 201009 U P | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201009 | ₹50.0 L | L2 | Rejected-Finance L2 |
| 3 | L3₹58.0 LRejected-Finance | ₹58.0 L | L3 | Rejected-Finance L3 |
| 4 | L4₹59.0 LRejected-Finance BULANDSHAHAR | HATHRAS | UTTAR PRADESH | 203001 | ₹59.0 L | L4 | Rejected-Finance L4 |
Tender Value
₹72.5 L
EMD Value
₹1.4 L
Closing Date
19 Mar 2026, 5:00 pmClosed
GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Construction of C.C road repair and dry bricks road Laying Interlocking tiles work and Brick drain in Village- Dudhera, YEA WC-06
2026_YEIDA_1122864_20
YEA/GM(PROJECT)/2026/480 DT-27/02/2026
Open Tender
Civil Works
Fixed-rate
120 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,905
₹1.4 L
30 Jun 2026
11 Mar 2026
20 Mar 2026
11 Mar 2026
19 Mar 2026
11 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation in ordinary in all of foundation tranches including dressing of side and ramming of bottom lifts upto a 1.5m including getting out the excavation soil and disposal of surplus excavated soil as directed with in a lead of 50m . AR | - | Cum | 1 | - |
| 0.0 | Supply of Earth work , banking excavated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with 1/2 tonnes roller or wooden or steel rammer and rolling every 3rd and top most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, all leads as per ( A.R. ) For all kind of soil. Construction of embankment with approved material obtained from borrow pits with all lift and leads transporting to site spreading ,grading to required slope and compacting to meet requirement of table 300-2 up to 5 km Morth 2019/3.16/305 UPPWD SOR-2020DSR-16/16.1 only for where machine can not reach | - | Cum | - | - |
| 0.0 | Preparation and consolidation of sub grade withpower road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.50 cm. depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth lead upto 50 metres. DSR-16/16.1 | - | sqm | - | - |
| 0.0 | Cement concrete with 4cm Guage Approved Stone ballast , Coarse Sand& Cement in the proportion of 8:4:1 including Supply of all material, Labour, Tools & Plants etc required for Proper completion of the work. UPPWD/SOR/281/P-17 | - | Cum | - | - |
| 5Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)UP PWD SOR 2020 /DAR-18/5.1.2 | |||||
| 6 | Reinforcement for R.C.C. work including straightening,
cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars.. UP PWD SOR 2020 /DAR-18/5.22.6 | - | Kg | 1 | - |
| 0.0 | Construction of un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30(Grade) coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm,mixed a concrete
mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid
approved fixed side
formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needie, screed and plate vibrators and| finished in continuous operation including provision of contraction and construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14 days,using curing compound (where specified) and water finishing to lines and grade as per drawing and finished with Power Trowel Cum Floter-Trimix Flooring Machine.Technical Specification Clause 1501. Including all taxes, material, T&P, Machinary. royalty, labour cess all taxes complete. Excluding GST as per E/l. | - | Cum | 1 | - |
| 0.0 | Dry brick on edge flooring in required pattern with bricks of class designation150 on a bed of earth including fillingcompressed with M-150Bricks(DAR/11.2/AR/YEIDA/BasedonUPPWD/SOR-2020) | 1 | sqm | - | - |
| 0.0 | M-150 brick work in 1:4 cement and Coarse sand of ( 2.20 fineness modulous) mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work . UPPWD/SOR/303+(305) | - | Cum | - | - |
| 0.0 | concrete with 2cm Guage Stone grit , Coarse Sand& Cement in the proportion of 4:2:1 including Supply of all material, Labour, Tools & Plants etc required for Proper completion of the work. UPPWD/SOR/279a/P-17 | - | Cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.96 MB
20.pdf
Tender Documents • 1.41 MB
BOQ_2093437.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].