SE Civil RRVPNL Bikaner
66 KV GSS Sangalpura Bikaner
Const. of outer approach path for 220 KV GSS Panchu
2026_RRVPN_531648_10
NIT 17 (2025-26) SE CIVIL BIKANER
Open Tender
Civil Works
Percentage
120 days
220 KV GSS Panchu
As per Bid Document
2 documents required · 2 mandatory
₹1,180
AO( T and C) RRVPNL
₹42,240
Yes
30 Jan 2026
30 Jan 2026
10 Feb 2026
30 Jan 2026
9 Feb 2026
30 Jan 2026
B-44/1.8 Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils
B-54/3.1.6 Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).
B-69 /6.1.6 Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in:Cement Mortar 1:6 ( 1-Cement : 6-Sand).
B-139/12.3.2 Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish :20mm thick.
B-12/12.43.1 Painting exterior surface of Wall with 100% acrylic exterior paint of approved brand and manufacture to give an even shade with two or more coats including prepartion of base with sand papering, primer, putty, etc complete in all respect including scaffolding and safety provision :New Work
B-56/3.8Providing & fixing precast cement concrete coping 1 : 2 : 4 mix 50mm thick complete as per specification :
S-247/3.16.3 P&F rigid PVC Pipe (IS:4985 mark) class II/ (4 Kg. /Cm2.) approved quality /make including joining the pipe with solvent cement rubber ring and lubricant.: 110 mm dia
R-3.5 (iii)Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3
R/3.3 Construction of embankment with approved materials deposited at site obtained from roadway cutting and excavation from drain and foundation or other structures graded and compacted to meet requirement of Tables 300-1 and 300-2 as per MoRTH Specification Clause 305.
R/4.1 (A ) (iii) Construction of granular sub-base by providing well graded material, spreading in uniform layers on prepared surface, mixing by manual mean method at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. .For Grading III Material
R-16.76 Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 602.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 31.5 mm, mixed in a concrete mixer of not less than 0.5 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed Side Formwork (steel channel, laying and fixing of 150 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using water finishing to lines and grade as per drawing and MoRTH Specification Clause 602 including vaccum dewatering process with all required equipments (Dowel Bars will be paid seprately)
B-135/11.38.1 (B)Providing and laying of paver block as per IS 15658 : 2006 (Indian standard for precast concrete block for paving- specification) and IRC : SP:63-2004 (guidelines for the use of interlocking concrete block pavement)M-30, 60 mm thick to be used in non traffic areas like building premises, monument premises, land scapes, public gardens/ park, domestic drives, paths and patios, Embankment slopes, sand stabilization Area etc.( As per table 1 of IS 15658:2006 Category ‘B’ Denated only two side like I,Z,T shape etc. as per IRC SP 63:2004
R-16.35.4 Supply & fixing of M-20 grade precast cement concrete Kerb or Dand upto 60 cm length over 20 mm thick base of cement mortar 1:6 including jointing earth work, painting & jointing with cement mortar 1:4 of size 20 x 25 cm
R-14.5 (i) Providing and laying pitching on slopes laid over prepared filter media as per drawing and MoRTH specifications Clause 2504.2.1 Stone/Boulder
B-12.31.1 Pointing on stone masonry in cement sand mortar 1:3 (1 cement : 3 sand) : Flush / Ruled/ Struck or weathered pointing.
Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor three level.Tremo Mechanically treated bars(Confirming of relevent IS Code) 4.13.3
Providing and laying in position specified grade of reinforced cement concrete for all RCC structural elements upto plinth level including curing compaction finishing with rendering in cement sand mortar 1:3 (1-Cement:3-coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. M20 grade Nominal Mix (1-Cement:1.5 coarse sand:3-graded stone aggregate 20 mm nominal size) (B-4.1.)
R-3.4(I) Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3
G-4.1 Carriage of Earth, Sand, Lime, Morrum manure or sludge(Total Lead 7.50 km and LESS 50 m hence total lead taken as 7.45 Km )
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
Agreementbiddoc.pdf
Tender Documents • 2.97 MB
BOQ_950503.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .