| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC 5 57 CALDWELL COLONY 1ST STREET TUTICORIN 8 | TUTICORIN | TAMIL NADU | 626202 | ₹2.3 L | L1 | Accepted-AOC Work was Awarded |
| 2 | L2₹2.3 LRejected-AOC D NO 17 143 APOLLO GARDEN MADANADAR KUDIERUPPU NEAR KUMARAPURAM JN TIRUNELVELI 627 133 | TIRUNELVELI | TAMIL NADU | 627133 | ₹2.3 L | L2 | Rejected-AOC Work was Not Awarded |
| 3 | L3₹2.5 LRejected-AOC 30 OPP ALOK PRESS GHATI BADBHUNJA CHAMELI ROAD BHOPAL BHOPAL MADHYA PRADESH 462001 UDYAM MP 10 0044621 | BHOPAL | MADHYA PRADESH | 462001 | ₹2.5 L | L3 | Rejected-AOC Work was Not Awarded |
| Sl No | Description | Qty | Unit | APOLLO TRANSFORMERS AND FILTERS L2 | R K ELECTRICALS L3 | KUMAAR ENTERPRISES L1 |
|---|---|---|---|---|---|---|
| 1.00 | Charges for providing filter machine of capacity of 4500 ltrs per hour or above for oil filtration work, providing power supply connection, providing lighting arrangement After completion of filtration, disconnection of the power supply, removal of lighting arrangement. | 1 | No | 7,300 ₹8,614 | 7,650 ₹9,027 | 7,450 ₹8,791 |
| 2.00 | Charges for Transportation of the 10 KL oil storage tank from repair bay to transformer yard & return back to its original position. | 2 | Nos | 13,560 ₹16,000.80 | 14,200 ₹16,756 | 13,040 ₹15,387.20 |
| 3.00 | Charges for Draining of Transformer oil from main tank of UST-II,SST-II,UAT-2A&2B to storage tanks and Hot oil circulation. Charges for Draining of Transformer oil from main tank of UST-II to storage tanks and Hot oil circulation. | 1,280 | Ltr | 2,304 ₹2,718.72 | 2,688 ₹3,171.84 | 2,201.6 ₹2,597.89 |
| 4.00 | Charges for Draining of Transformer oil from main tank of SST -II to storage tanks and Hot oil circulation. | 1,730 | Ltr | 3,114 ₹3,674.52 | 3,633 ₹4,286.94 | 2,975.6 ₹3,511.21 |
| 5.00 | Charges for Draining of Transformer oil from main tank of UAT-2A to storage tanks and Hot oil circulation. | 5,950 | Ltr | 10,710 ₹12,637.80 | 12,495 ₹14,744.10 | 10,353 ₹12,216.54 |
| 6.00 | Charges for Draining of Transformer oil from main tank of UAT-2B to storage tanks and Hot oil circulation | 7,000 | Ltr | 12,600 ₹14,868 | 14,700 ₹17,346 | 12,180 ₹14,372.40 |
| 7.00 | Charges for Vacuum pulling, Oil filling and hot oil circulation(main tank, radiators & combined crculation) up to reaching of parameters to the satisfactory level in 3phase GT2. | 56,000 | Ltr | 1,06,400 ₹1.3 L | 1,17,600 ₹1.4 L | 1,09,200 ₹1.3 L |
| 8.00 | Drawl of new transformer oil drum from stores & transporting to transformer location, Prehot oil circulation of newly drawn oil and devoluting of released oil drum to stores. | 4 | No | 4,200 ₹4,956 | 4,800 ₹5,664 | 4,020 ₹4,743.60 |
| 9.00 | Charges for Dismantling and Assembling the Inspection covers of OLTC, Surge relays, OLTC diverter switch assembly with new gasket in Three phase GT,UST-II,SST-II,UAT-2A&2B. Charges for Dismantling and Assembling the Inspection covers of OLTC, Surge relays, OLTC diverter switch assembly with new gasket in Three phase GT. | 1 | No | 13,500 ₹15,930 | 14,200 ₹16,756 | 13,050 ₹15,399 |
| 10.00 | Charges for Dismantling and Assembling the Inspection covers of OLTC, Surge relays, OLTC diverter switch assembly with new gasket in UST-II. | 1 | No | 13,500 ₹15,930 | 14,200 ₹16,756 | 13,050 ₹15,399 |
Tender Value
Refer Docs
EMD Value
₹2,700
Closing Date
16 Feb 2026, 2:00 pmClosed
CE/TTPS
Chief Engineer / TTPS, Tuticorin
TTPS ES Circle EM I Unit II Hot Oil Circulation of 71960 litres of existing Transformer Oils of 250MVA 15 75kV 230kV 3phase GT 16MVA 15 75 7 0kV UAT 2A 15MVA 15 75 7 0kV UAT 2B 1 6MVA 6 6kV 433V UST II and 2 0MVA 6 6kV 433V SST II to reinsta
2026_EB_654587_1
CE/SE/ES/TTPS/230/2025-26
Open Tender
Electrical and Maintenance Works
30 days
TTPS
As per BQR conditions in NIT
7 documents required · 7 mandatory
₹0
₹2,700
Yes
24 Mar 2026
10 Feb 2026
17 Feb 2026
10 Feb 2026
16 Feb 2026
10 Feb 2026
Charges for providing filter machine of capacity of 4500 ltrs per hour or above for oil filtration work, providing power supply connection, providing lighting arrangement After completion of filtration, disconnection of the power supply, removal of lighting arrangement.
Charges for Transportation of the 10 KL oil storage tank from repair bay to transformer yard & return back to its original position.
Charges for Draining of Transformer oil from main tank of UST-II,SST-II,UAT-2A&2B to storage tanks and Hot oil circulation. Charges for Draining of Transformer oil from main tank of UST-II to storage tanks and Hot oil circulation.
Charges for Draining of Transformer oil from main tank of SST -II to storage tanks and Hot oil circulation.
Charges for Draining of Transformer oil from main tank of UAT-2A to storage tanks and Hot oil circulation.
Charges for Draining of Transformer oil from main tank of UAT-2B to storage tanks and Hot oil circulation
Charges for Vacuum pulling, Oil filling and hot oil circulation(main tank, radiators & combined crculation) up to reaching of parameters to the satisfactory level in 3phase GT2.
Drawl of new transformer oil drum from stores & transporting to transformer location, Prehot oil circulation of newly drawn oil and devoluting of released oil drum to stores.
Charges for Dismantling and Assembling the Inspection covers of OLTC, Surge relays, OLTC diverter switch assembly with new gasket in Three phase GT,UST-II,SST-II,UAT-2A&2B. Charges for Dismantling and Assembling the Inspection covers of OLTC, Surge relays, OLTC diverter switch assembly with new gasket in Three phase GT.
Charges for Dismantling and Assembling the Inspection covers of OLTC, Surge relays, OLTC diverter switch assembly with new gasket in UST-II.
Charges for Dismantling and Assembling the Inspection covers of OLTC, Surge relays, OLTC diverter switch assembly with new gasket in SST-II.
Charges for Dismantling and Assembling the Inspection covers of OLTC, Surge relays, OLTC diverter switch assembly with new gasket in UAT-2A.
Charges for Dismantling and Assembling the Inspection covers of OLTC, Surge relays, OLTC diverter switch assembly with new gasket in UAT-2B.
Charges for Dismantling and erection of oil circulating pump in Three phase Generator Transformer in Unit-II: Closing of butterfly isolation valves for the oil pumps, providing dummy plates for the oil lines, Dismantling of oil pump unit by disconnecting the flanges from the pipe lines, cleaning the flange surfaces, preparing the gaskets for flanges, Removal of dummy plates before erecting the overhauled pump, erecting the oil pump unit with replacement of gaskets, Connecting the flanges by tightening, opening of butterfly isolation valves for the oil pumps, checking of oil leak and arresting if any(The gasket required will be supplied by the TNPGCL).
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_784881.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid