| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹82,000Admitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹2.7 L+₹1.8 L (225.4%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹2.6 L+₹1.8 L (217.1%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Deepak Kumar Samariya L2 | M/S TIKAM CHAND DAYMA L3 | GRANTH CONSTRUCTION COMPANY L1 |
|---|---|---|---|---|---|---|
| 2.00 | Providing and fixing of fiber board for bascket ball ground having size (1.80m x 1.05m x .0025m) and including all accessories required as per direction of engineer In charge. | 4 | Nos | 66,700 ₹2,66,800 | 65,000 ₹2,60,000 | 20,500 ₹82,000 Lowest |
Tender Value
₹38.3 L
EMD Value
₹76,580
Closing Date
4 Mar 2026, 6:00 pmClosed
DC
dc
Work to develop the playground of Government Senior Secondary School (GSSS) Topdara (221890) with modern facilities.
2026_DLB_541422_2
2038
Open Tender
Miscellaneous Works
Percentage
365 days
Nagar Nigam
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
In bank account as per bid details
₹76,580
Yes
19 Mar 2026
23 Feb 2026
5 Mar 2026
23 Feb 2026
4 Mar 2026
23 Feb 2026
Providing and fixing of fiber board for bascket ball ground having size (1.80m x 1.05m x .0025m) and including all accessories required as per direction of engineer In charge.
Percentage BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Clearing Grass and Removal of Rubbish (Maximum 150mm) by manual means and disposal at a lead of 50 metres as per MoRT&H specification clause 201.
Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer Cement Concrete Grade M-15 and above and PCC blocks
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-incharge.
Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.Depth upto 1.5 m
Carriage of materials by mechanical transport including loading,unloading and stacking :: Earth 5 Km
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size).
Random rubble masonry with hard stone in foundation and plinth :Cement mortar 1:6 (1 cement : 6 coarse sand)
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level :1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for :Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
Brick work with FPS bricks of class designation 75 in superstructure above plinth level upto two stories in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand)
Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix : including Providing /mixing of syntheticfibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar1:4 (1 cement : 4 fine/ coarse sand)
Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete
Distempering with dry distemper of approved brand and manufacture (two or more coats) and of required shade on new work, over and including priming coat of whiting to give an even shade.
Painting two coats on specified surface with synthetic enamel paint of approved brand and shade, after thorough cleaning and necessary filling to give even shade as per clause 803 of MoRT&H Specification including all material, labour.On steel surface
Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
Providing and laying TMT bar reinforcement at any level in foundation/ pile/ pile cap complete as per drawing and clause 1600 of MoRT&H Specification including all material, labour and machinery.Reinforcement with TMT bar in super structure
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Providing and laying Base/sub-base using cement, sand, fly ash and coarse aggregates proportioned as per table 4 of IRC: 74/1979 and with water content ratio, slump and compressive strength as defined in the said table, mix prepared in a batching and mixing planttransported to site, laid with a fixed form or slip form paver, spread,and compacted with a vibratory roller 8-10 tonnes capacity within the time limit laid down vide clause 7.6.3 of IRC: 74-1979, construction joints properly formed at the end of day's work, cured for 14 days, all as specified in IRC: 74-1979 and as per approved plans complete including all material, labour, machinery, lighting, guarding and maintenance of diversion.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
BOQ_965185.xls
BOQ • 0.32 MB
ebid2.pdf
Tender Documents • 5.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .