Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.9 LAdmitted-Finance | -18.30% | ₹12.9 L | L1 | Admitted-Finance |
| 2 | L2₹13.0 LAdmitted-Finance | -17.78% | ₹13.0 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical ALWAR RAJASTHAN | ALWAR | RAJASTHAN | 301001 | - | - | - | Rejected-Technical refer sheet |
Tender Value
₹15.8 L
EMD Value
₹31,680
Closing Date
6 Mar 2026, 6:00 pmClosed
se
wdsc tonk
Renovation of MIT and Anicut Block Uniara 06 nos under WDF
2026_WDSC_542334_1
NIT35-38 wdsc Tonk
Open Tender
Civil Works - Water Works
120 days
tonk
refer bids
2 documents required · 2 mandatory
₹500
refer bids
₹31,680
Yes
se office wdsc tonk
11 Mar 2026
26 Feb 2026
7 Mar 2026
26 Feb 2026
6 Mar 2026
26 Feb 2026
26 Feb 2026 - 6 Mar 2026
4 Mar 2026
as per bsr specification
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect ( Item no-1& 2 ch-v WRD BSR 05-05-2023 tonk less 10% C.P. ) 1b. Hard / dense soil
सीमेंट कंक्रीट 1 सीमेंट : 4 बजरी तथा 8 गिट्टी / 1 सीमेंट, 3 बजरी तथा6 गिट्टी पत्थर की 20 मिमी नामीय माप की नींव में डालना,कूटना तथा तराई आदि सहित एनीकट के लिए। #170(अ)1:4:8 वाईब्रटर व मिक्सर का उपयोग नही करने पर 3 प्रतिशत की कटोती की जावेगी। (RDPR BSR 01-04-2025)
,uhdV gsrq iRFkj dh fpukbZ lhesaV ctjh elkys esa 1% 6 esa #166(अ) RDPR BSR 01-04-2025
50 मिमी मोटाई में सीमेंट कंक्रीट 1:2:4 मिश्रण जिसमें 1 सीमेंट 2 बजरी 4 पत्थर की या ईंट की 12 मी. नामीय गिट्टी के साथ मिलाकर डालना, कूटना, दबाना तथा तराई आदि सहित। (RDPR BSR 01-04-2025 Item No-14a)
lhesaV IykLVj nhokj ij 1%6 vuqikr eS lhesaV es ctjh feykdj tksM+ks dks dwjsnus rFkk 14 fnu rd fu;fer rjkbZ lfgr 25 eh-eh- eksVkbZ ¼dsoy tyjks/kh lajpukvksa ds mi;ksx gsrq (RDPR BSR 01-04-2025 Item No-77 (अ)
Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect. ( Item no-16 ch-v WRD BSR 2023 tonk less 10% C.P. ) Deduct in item no. 16 (a) to (d) above if standard proctor's density to be achived is at least 90%
Compaction of earth or highly weathered strata a. by manually or plain roller , (density 90 % of Proctor) ( Item no-18 a ch-v WRD BSR 2023 tonk less 10% C.P. )
Watering of earth including cost of carriage of water (up to 1 Km ) ( Item no-28 a ch-v WRD BSR 2023 tonk less 10% C.P. )
Display Board RDPR 2025-26(Item no.23)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
BID.pdf
Tender Documents • 7.51 MB
BOQ_966801.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid