Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.9 LAccepted-Finance | 1 | Accepted-Finance Accepted | |
| 2 | 2₹2.0 L+₹6,200 (3.26%)Accepted-Finance | 2 | Accepted-Finance Accepted | |
| 3 | 3₹2.0 L+₹9,560 (5.03%)Accepted-Finance | 3 | Accepted-Finance Accepted |
Tender Value
₹1.9 L
EMD Value
₹4,000
Closing Date
12 May 2021, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC-I, Kanpur
SE ETC-I, Kanpur
Work
2021_UPTCL_584792_1
ET-12/ETC-I(K)/2021-22
Open Tender
Electrical Works
Fixed-rate
90 days
Kanpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹236
PNB Account No 0727002100004177
₹4,000
18 May 2021
29 Apr 2021
13 May 2021
29 Apr 2021
12 May 2021
29 Apr 2021
120 days
Amount
Broken / removing damage chimney (Tower no. 3) up to depth of M.S. Steel reinforcement bars than 4 nos. joint M.S. Steel reinforcement bars that dia. 12 mm. and length up to 900 mm. and putting 03 nos. 6 mm. dia. M.S. Steel ring size 350X350 mm2 with 600X600X1000 mm3 RCC of ratio 1:2:4 cement, sand and stone ballast of 10 mm. size plus cooping to keep away earth deposited on tower leg and to stop detoriation of leg due to rust. The work also includes curing of extended chimney / cooping two times daily for 10 days.
Broken / removing damage chimney of tower legs and height raising of tower legs chimney of 132 KV Panki-KFCL line different – deferent location by 600X600X800mm3 size with RCC of ratio 1:2:4 cement, sand and store ballast of 10 mm. size to keep away earth deposited on tower leg and to stop detoriation of leg due to rust. The work also includes curing of extended chimney / cooping two times daily for 10 days.
Painting of tower legs of 132 KV Panki-KFCL D/C line by black rubber paint up to 500 mm. above chimney of earth leg to maintain the strength of leg by restricting. The rusting in leg due to accumulation of soil and water logging during rainy season. The work includes cleaning of rust and dust from leg and cleaning of accumulated soil / garbage on tower cooping / leg before staring the work to complete the job satisfactorily.
Pipe type earthing grouting (Location no. 8) shall be effected by making about 300 mm. dia. 3750 mm. deep pit at a distance of not less than 3650 mm. away from the stubs and filling in the pit with finally broken cop having the granule sizes not more than 25 mm. and salt in such a bay that minimum cover of 125 mm. thick salt-mixed-coke shall be maintained from the pipe on site and that the top edge of the pipe shall be at least 600 mm. below the grout line. The GS strip shall be buried not less than 600 mm. from the ground line. (The material shall be provide by the contractor)
Notes : All materials, T&P and man power shall be provided by the contractor at his own cost.
N K MISHRA
POWER CONSTRUCTION COMPANY
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .