Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹21.3 LAccepted-AOC | ₹21.3 L | 1 | Accepted-AOC accept |
| 2 | 2₹23.2 LRejected-AOC | ₹23.2 L | 2 | Rejected-AOC reject |
| 3 | 3₹25.2 LRejected-AOC MEERUT UTTAR PRADESH 250110 INDIA UDYAM UP 56 0008622 | MEERUT | UTTAR PRADESH | 250110 | ₹25.2 L | 3 | Rejected-AOC reject |
| Sl No | Description | Qty | Unit | M/s S.S. Refregeration L1 | Hi-tech power transmission L3 | SHASHI ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 1.00Part-(A) INCREASING CAPACITY OF 33/11KV S/S AVAS VIKAS FROM 2X5 MVA TO 3X5 MVA (SPN) | ||||||
| 2.00Supply of following materials by firm | ||||||
| 3.00 | MS Round Bar 32 mm dia | 2,372 | Kg. | 72 ₹1.7 L | 75 ₹1.8 L | 72 ₹1.7 L |
| 4.00 | GI STRIP Flat 50x6mm | 125 | MTR | 280 ₹35,000 | 285 ₹35,625 | 280 ₹35,000 |
| 5.00 | DC supply system with one no. float cum boost charger & 01 battery set for 24V. DC supply system with 200A.H. battery capacity with cabnet | 1 | NO | 1,30,000 ₹1.3 L | 1,55,000 ₹1.6 L | 1,45,000 ₹1.4 L |
| 6.00Loading, unloading and safe carriage of the following materials from any Store Centre of Electricity store division bareilly to the site of work including measuring, weighing, loading, unloading at both ends and proper stacking at safe site. | ||||||
| 7.00 | M.S. Channel 125x65mm | 563.1 | kg. | 2 ₹1,126.20 | 2.5 ₹1,407.75 | 10 ₹5,631 |
| 8.00 | M.S.Angle 75x75x8mm | 536.98 | kg. | 2 ₹1,073.96 | 2.5 ₹1,342.45 | 10 ₹5,369.80 |
| 9.00 | MS Angles 50x50x6mm | 68.6 | kg. | 2 ₹137.20 | 2.5 ₹171.50 | 10 ₹686 |
| 10.00 | MS Channel 100x50x2028mm (For top channel & fuse set) | 3 | No. | 500 ₹1,500 | 600 ₹1,800 | 650 ₹1,950 |
Tender Value
₹25.5 L
EMD Value
₹25,500
Closing Date
18 Sept 2025, 12:00 pmClosed
SE EWC
Bareilly
Increasing capacity of 33/11 KV Sub Stations and Cable laying,Reconductring, Strenthening works under EDC Shahjahanpur, Badaun
2025_MVVNL_1071058_1
08/EWC(B)/2025-26
Open Tender
Electrical Works
30 days
Shahjahanpur Badaun
as per tender form
3 documents required · 3 mandatory
₹3,540
SE EWC
₹25,500
Yes
10 Dec 2025
3 Sept 2025
18 Sept 2025
3 Sept 2025
18 Sept 2025
3 Sept 2025
Amount
Part-(A) INCREASING CAPACITY OF 33/11KV S/S AVAS VIKAS FROM 2X5 MVA TO 3X5 MVA (SPN)
Supply of following materials by firm
MS Round Bar 32 mm dia
GI STRIP Flat 50x6mm
DC supply system with one no. float cum boost charger & 01 battery set for 24V. DC supply system with 200A.H. battery capacity with cabnet
Loading, unloading and safe carriage of the following materials from any Store Centre of Electricity store division bareilly to the site of work including measuring, weighing, loading, unloading at both ends and proper stacking at safe site.
M.S. Channel 125x65mm
M.S.Angle 75x75x8mm
MS Angles 50x50x6mm
MS Channel 100x50x2028mm (For top channel & fuse set)
M.S angle lron 65x65x6mm, 2700mm long @ 5.8 Kg/Mt (bracing)
33 KV Post insulator
33 KV Lightening Arrestor
33 KV 400 A Bus Isolator
33 KV VCB 800A 750 MVA
Control pannel I/C for 33 KV Single T/F
33 kv O/D CT CTR 200/100/1-1-1 A
33 KV PT (outdoor) 33KV/110V
11 KV VCB I/C CTR 600/300/5A
11 KV VCB O/G CTR 200/100/5A
11 KV Bus coupler
11 KV 3x300 mm2 XLPE Cable
11 KV 3x185 mm2 XLPE Cable
11 KV Cable jointing Kit 3x185 mm2 I/D
11 KV Cable jointing Kit 3x185 mm2 O/D
11 KV Cable jointing Kit 3x300 mm2 I/D
11 KV Cable jointing Kit 3x300 mm2 O/D
STP Pole 11 mtr long
Earthing Complete
Stay set complete 16x1800mm
11 KV disc insulator
11 KV disc fitting
Cost of ACSR Dog conductor
Earthing of indoor & outdoor equipments of Sub-Station after proper welding of joints and painting of earth strip above soil with proper clamp etc. as per RESPO approved drawing & resistance of earthing should be not more than 2Ω as per details given below.
Laying of M.S. Bar of 32mm dia for making the complete earthmat in the trenches in S/s Yard of 750mm depth and 500mm width with their straightening, cutting accordingly and welding with overlap joint of 100mm cross joint, T joint.
Making and driving of 3 Mtr. Long electrodes from 32mm dia M.S. Bar having one end conical 150mm long by heat tempering including cutting upto 750mm depth from ground level and welding with earth mat.
Making of triangular bridge by using M.S. electrodes and G.I. Strip 50x6mm with providing of well type pipe earthing upto 20 Mtr. Depth below G/L including welding etc. by boaring process at LA and two side of 11 KV S/G including cost of GI Pipe of size 40mm dia 15 Mtr Long of ISI mark.(all material provided by firm)
welding & laying of G.S. strip 50x6mm size with structures and all equipments in switchyard and control room, M.S. Bar including cutting, binding and proper fixing etc. complete. The welding and laying of G.S. Strips to L.A. with full length of structures and also the M.S. bridge near L.A. structures.
Supply of following materials for construction of power tf plinth
Supply of 90 LBS Rail pieces for T/F (44.64 KG. PER MTR.)
Supply of bricks as per standard
Supply of cement as per standard
Supply of sand as per standard
Supply of stone ballast 20mm as per standard
Supply of steel rebar 12mm as per standard
Supply of brick bat as per standard
Construction of new transformer plinth of size 4.5x3.5 Mtr. for upto 10 MVA Transfomer having depth 0.5 Mtr. below ground level & 0.5 Mtr. above ground level. The work including excavation of foundation. base & concreting of foundation base of CC 1:6:12 ratio (cement, fine sand & brick ballast) first class brick work of cement morter of ratio 1:4 for masonry & lintring work of transformer plinth of RCC work of ratio 1:2:4 (cement, coarse sand and store grit of 20mm using MS Bars of 10mm dia(tor) for reinforcement of linter including cutting, bending & binding of MS bars of required plinth size & shape. The work also includes laying of 2 Nos. 3.5 Mts. long rail pieces after cutting in proper size & shape & fitting etc. The plinth will be made as per RESSPO/Approved drawing suitable for 10 MVA transformer & shall be plastered of walls of ratio 1:4 (cement & fine sand)/finished on top and sides of the plinth. ( Only erection )
Fabrication, erection and grouting of the following structures as per RESSPO/ Approved Drawing and its, plinth 30cm above ground level as directed by the Engineer Incharge, Grouting of structure will be done in 1:4:8 ratio of cement, sand & coarse aggregate with material including all accessories
Bus Isolator Structure
Post insulator Structure
33 KV VCB Structure
33 KV CT Structure
33 KV PT Structure
Fuse Set Structure
Lightening Arrestor Structure
Mounting and installation, including Mechnical & electrical fixing and adjusting of the following equipments on their respective structures including proper adjustment:
33 KV Bus Isolator
33 KV Fuse Set (Provided by firm)
Lightening Arrestor
33 KV VCB
33 KV Post insulator
Insttalation and conection of 24 V Battery set with charger (To be provided by firm I.S.I. mark only of DC System with one float cum boost charger & battery set for 24V. System with 150A.H. Capacity with cabinet).
Complete laying and termination of copper control cable in PVC Pipe 4" dia from 5 MVA power T/F and 33 KV VCB in the out door switch yard in the Transformer relay control panel inside the control room including cost of all materials and labour required for proper completion of works as per RESSPO drawings.
Control Cable 4x2.5 mm2
Control Cable 2x2.5 mm2
Laying of dog conductor alongwith cost of all required calmps and connectors etc. as per RESSPO Approved drawing from bus bar to L.A., C.T., V.C.B., Bus Isolator etc. complete with sagging and making vertical/Horizontal jumper connections through PG clamps and connecting all the equipments with each others through connecting clamps, (All type of insulator, fitting, PG clamp etc. provided by Firm).
Making of M.S. Angle Ladder type frame of Angle (75x75x6mm) & M.S. Strip (50x6mm) near power transformer for power cable with concreting in 1:4:8 ratio of cement, sand & coarse aggregate and proper clamping (50x6mm) of the same with transformer cable (All type of, grouting material etc. will be provided by The firm).
Making of M.S. Angle frame of (75x75x6mm) in the shape of "L" to connect T/F Neutral by copper flexible strip with proper clamping including cost of copper strip. Earthing of Power T/F Neutral shall be done separately including welding with M.S. bar Electrode bridge 1 No. after making in triangular shape and proper connection with well type earthing etc. Grouting of structure will be done in 1:4:8 ratio of cement, sand & coarse aggregate ( All type laying material will be provided by the Firm except steel cables ).
Laying of 11KV cable of different size from power T/F to control room I/C and control room to D/P outside Sub-Station over a pad of river sand . Cable shall be laid 500mm below the ground in the yard by covering three sides with Ist Class brick and Ganga sand (All type laying material will be provided by the Firm except 11 KV cables ).
11 KV Cable hoisting with GI Pipe 6" dia (All type of material provided by the Firm).
Erection and grouting of double pole structure of STP Poles including stays for 11KV out door feeders, complete in all respect as per RESSPO drawing along with grouting material about 3 meter 6" dia G.I. pipe along with required elbow shall be provided at D/P for power cable including provision of 03 Nos. feeders name plate on D/P. (all type of grouting material provided by the Firm).
Erection of 11 KV incoming, outgoing and bus coupler panels (with testing & setting of relays) in substation control room including grouting of Anchor bolts of panel and making of pocket for power cable to insert in panel from trench and complete filling of control room's tranches by river sand.
Erection & testing of single T/F Control panel in substation control room including grouting of anchor bolts of panel and making of pocket for control cable to insert in panel from trench and complete filling of control room's tranches by river sand.
Termination of 11 KV Different size XLPE cable by filling 11 KV heat shrinkable type cable boxes including proper connection with LV side of T/F switch gear panels and double poles by providing suitable connectors.
Work related maintinance of old and used 5 MVA Transformer.
Attending of leakage of power transformer (Replacement of damage gasket kit etc)(all required material will be provided by firm.)
Centrifusing of transformer oil.
Replacement of damage brether and silica jel.(all required material will be provided by firm.)
Replacement of damage WTI and OTI.(all required material will be provided by firm.)
Painting of old transformer.(all required material will be provided by firm.)
Replacement of damage buchholz relay(all required material will be provided by firm.)
Replacement of damaged 33kv, 11kv bushings (all required material will be provided by firm.)
Carriage and top up of transformer oil from any store/workshop of Bareilly Zone 1, Bareilly Zone 2
Shifting of existing 11 KV VCB panel and re arrange its in control room including its power cable, control cable and busbar connections.
Painting of the fabicated structures with one coat of red oxide primer and two coats of synthetic enamel alumm. Paint/green paint of ISI Mark alongwith earthing strip above ground level.
Providing of rubber matting sheet 8/10mm
Part-(B) INCREASING CAPACITY OF 33/11 KV S/S BAHADUR GANJ FROM 5+10 MVA TO 2X10 MVA (SHAHJAHANPUR)
Loading, unloading and safe carriage of the following materials from any Store Centre of Electricity store division bareilly to the site of work including measuring, weighing, loading, unloading at both ends and proper stacking at safe site.
Making of triangular bridge by using M.S. electrodes and G.I. Strip 50x6mm with providing of well type pipe earthing upto 15 Mtr. Depth below G/L including welding etc. by boaring process at TF neutral and body earthing including cost of all required material as GI Pipe of size 40mm dia, round bar 32 mm dia, etc.(all material provided by firm)
welding & laying of G.I. strip 50x6mm size with structures and all equipments in switchyard and control room, M.S. Bar including cutting, binding and proper fixing etc. complete. The welding and laying of G.S. Strips to L.A. with full length of structures and also the M.S. bridge near L.A. structures. All required material will be provided by firm.
Mounting and installation, including Mechnical & electrical fixing and adjusting of the following equipments on their respective structures including proper adjustment:
24 V Battery set with charger (To be provided by firm I.S.I. mark only of DC System with one float cum boost charger & battery set for 24V. System with 150A.H. Capacity with cabinet).
Lightening Arrestor
Dismentaling of following damage equipment.
Lightening Arrestor
Complete laying and termination/connection of copper control cable in PVC Pipe 4" dia from 10 MVA power T/F, 33 KV VCB and 33KV C.T. in the outdoor switchyard to the transformer control and relay panel inside the control room including cost of all materials and labour required for proper completion of works as per RESSPO drawings.(all material will be provided by firm)
Control Cable 4x2.5 mm2
Control Cable 2x2.5 mm2
Shifting and dragging of 33/11 KV 5 MVA transformer from its plinth to safe site in switchyard at store centre substation alongwith proper disconnection of its HT, LV, control cable and earthing connection and doing connection of HT (33kv) and LT(11kv) side of 10MVA power transformer after installation of 10MVA power transformer.
Repairing of existing 33KV VCB in switchyard including repalcement of all required accessories as relay, motor, intrruptor etc. All type of material should be provided by the firm.
Repairing of damage 33KV control pannal including all damage realay,indictor,t&c swich,control wirering etc.All type of material should be provided by the firm.
Painting of the all newly and existing structures with one coat of red oxide primer and two coats of synthetic enamel alumm. Paint/green paint of ISI Mark alongwith earthing strip above ground level.
Carriage of old scrap material from site to store center Pilibhit.
Repairing of complete switchyard fencing and its painting.
Part-(C) REPLACEMENT OF DAMAGE 33 KV3X300 XLPE U/G CABLE NEAR DWIRIYA MOD OF 33 KV LINE HATHODA SHAHJAHANPUR
Loading, unloading and safe carriage of the following materials from any Electy. Store Center of Electricity store division of Bareilly zone.to site of work including measuring, weighing, loading, unloading at both ends and proper stacking at safe site.
33 KV 3x300mm XLPE Cable
33KV 3x300mm cable joitng kit O/D
Single CKT cable laying by drill method
Hoisting of 33 KV 3X300 Sq. mm. XLPE cable on double pole with GI PIPE 6'' DIA including its jumpering complete with clamps, nuts and bolts. (ALL MATERIAL PROVIDED BY FIRM )
Fixing of 33 KV JOINTING KIT O/D TYPE
Part-(D) RECONDUCTORING & ENTERPOLLING OF 33KV DEEWAN JOGRAJ LINE , EDD II SHAHJAHANPUR ,FROM DEEWAN JOGRAJ TO 132 KV S/S PAINA SHAHJAHANPUR
Loading, unloading and safe carriage of the following materials from any Electy. Store Center of Electricity store division of Bareilly zone to site of work
9.0 M long PCC pole
33 KV cross arm
33 KV pin insulator
M.S. Earthing rod
ACSR Dog conductor
33 KV disc insulator B&S type 70 KN
Disc fitting Dog/Racoon 70 KN
Complete Stay set complete
Erection of the following supports including cutting, making holes, fixing of all types of accessories digging of pits complete in all respect, as per RESSPO drawing.All types of clamps, stone pad, nut, bolt washers would be provided by the contractor.
Single support of PCC pole 9 mtr long.
Erection/fixing for stay set with stay wire and clamp as per RESSPO drawing including binding, clamping, tightening, and nozzeling etc. complete in all respect including its grouting in ratio 1:4:8 before back filling of the pits as per RESSPO schedule. All clamps, nuts, bolts, cement. brick, ballast, sand etc would be provided by the contractor.
Replacement of following damage material of above 33 KV Line.(Material provided by Department.)
Pin Insulators wih Pins
Disc Insulator with fittings
X-arms
33 KV F Clamp (provided by firm)
33 KV X ARM holding clamp (provided by firm)
Concreting of all type of supports in 1:4:8 ratio from bottom of pole to ground level and plinthing of supports upto 300mm above ground level by using cement ,stone ballast and sand in ratio 1:4:8 as per RESSPO drawing with watering/curing properly upto proper setting of plinthing.All matrial would be provided by the contractor.
Laying and sagging of 3 phase ACSR Dog conductor of 33 KV Line Deewan jograg Shahjahanpur including jumpering, hoisting, fixing of all type of insulators, binding, jointing and its clamping etc. in all respect.
Laying and Resagging of 3 phase ACSR Dog conductor of existing 33 KV Line Deewan jograj Shahjahanpur including jumpering, hoisting, fixing of all type of insulators, binding, jointing and its clamping etc. in all respect.
Earthing of each PCC Poles of the line is to be done by inserting the MS earth rod (1800x20mm) into soil by hammering and properly fastning with GI wire to each support by nut & bolt. Earthing rod must be 0.15Mtr.above from the plinth of the support. All type nut & bolt would be given by the contractor.
Clearing of the line route by cutting of tree branches during erection of line and also upto the time of energisation completely as per direction of Incharge.
Fixing of danger board and number plate and G.I barbed wire on each pole including proper clamping. All material would be provided by firm.
strenghtening of tilted pole with grouting
Part-(E) 33KV UG CABLE REPLACEMENT AT DIFFERENT LOCATION OF 33KV LINE DISTRICT HOSPITAL BADAUN
Loading, unloading and safe carriage of the following materials from any Electy. Store Center of Electricity store division of Bareilly zone.to site of work including measuring, weighing, loading, unloading at both ends and proper stacking at safe site.
33 KV 3x300mm XLPE Cable
33KV 3x300mm cable joitng kit O/D
Single CKT cable laying by drill method
Hoisting of 33 KV 3X300 Sq. mm. XLPE cable on double pole with GI PIPE 6'' DIA including its jumpering complete with clamps, nuts and bolts. (ALL MATERIAL PROVIDED BY FIRM )
Fixing of 33 KV JOINTING KIT O/D TYPE
Part-(F) 33KV SINGLE CIRCUIT CABLE FROM 33KV LINE KACHAHARI TO 33KV BAY UNDER 132KV NAWADA, BADAUN
Loading, unloading and safe carriage of the following materials from any Electy. Store Center of Electricity store division of Bareilly zone.to site of work including measuring, weighing, loading, unloading at both ends and proper stacking at safe site.
33 KV 3x300mm XLPE Cable
33KV 3x300mm cable joitng kit O/D
Single CKT cable laying by drill method
Hoisting of 33 KV 3X300 Sq. mm. XLPE cable on double pole with GI PIPE 6'' DIA including its jumpering complete with clamps, nuts and bolts. (ALL MATERIAL PROVIDED BY FIRM )
Fixing of 33 KV JOINTING KIT O/D TYPE
SHASHI ENTERPRISES (BID ID -5541791)
Hi-tech power transmission (BID ID -5530105)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid