Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
₹2.8 L
EMD Value
₹5,540
Closing Date
27 Aug 2021, 3:00 pmClosed
Executive Engineer Construction Division Leh
Executive Engineer Construction Division Leh
Providing and Laying of MS Pipe and Construction of 1 Mtr Span RCC culvert in Link Road from Thangkop village to Chomomamay to Nillabuk chowla house
2021_PWD_3385_10
104 of CDL Leh of 2021-22
Open Tender
Civil Works - Roads
Item Rate
30 days
LEH
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
Executive Engineer Construction Division Leh
₹5,540
28 Dec 2021
31 Jul 2021
28 Aug 2021
31 Jul 2021
27 Aug 2021
31 Jul 2021
Amount
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m All kinds of soil :
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1.5:3 (1 cement :1.5 coarse sand: 3 graded stone aggregate 20mm nominal size
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level
Providing and laying MS pipe crossing including earth work in cutting placing of pipe at required gradiant for efficient all complete work. 250 mm dia
Providing and laying MS pipe crossing including earth work in cutting placing of pipe at required gradiant for efficient all complete work. 300 mm dia
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
Columns, pillars, piers, abutments, posts and struts.
Suspended floors, roofs, landings, balconies and access platforms.
Edges of slabs and breaks in floors and walls Under 20 cm wide
Carrage of material from source to site by MT including, loading, unloading and stacking all complete job. A) Cement and steel avg lead 28 Kms
b) Sand avg lead 15 km
c) Agg an avg lead 15 km
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .