| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹1.6 Cr+₹8.9 L (5.97%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹1.7 Cr+₹19.7 L (13.1%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹1.9 Cr+₹40.4 L (27.0%)Admitted-Finance 57 KAMARAJ STREET KOLAPPALUR GOBICHETTIPALAYAM ERODE 638 456 | GOBICHETTIPALAYAM | ERODE | TAMIL NADU | 638456 | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | S.HARI BALAKRISHNAN L1 | sai pranesh infrastructures L4 | SHAKTHI CONSTRUCTION L2 | A KALIPPAN L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Clearing Juliflora Jungle without uprooting including all cost of labour lead lift etc.,complete | 6,150 | Sqm | 0.09 ₹553.5 Lowest | 1 ₹6,150 | 5 ₹30,750 | 6 ₹36,900 |
| 2.00 | Conducting Check Survey and pit marking including levelling the Location including Cost of thread, nail, all lead lift etc complete. | 4 | LOC | 603 ₹2,412 Lowest | 2,500 ₹10,000 | 1,000 ₹4,000 | 1,200 ₹4,800 |
| 3.00 | Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Slush and Silt under water upto 0.75m depth requiring the aid of basket and vessels (SS20B) | 500 | Cum | 99 ₹49,500 Lowest | 250 ₹1,25,000 | 100 ₹50,000 | 200 ₹1,00,000 |
| 4.00 | SDR - (Not Requiring Blasting) Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Soft disintegrated rock, laterite, soft rock or kankar, Not requiring blasting. | 500 | Cum | 207 ₹1,03,500 | 250 ₹1,25,000 | 110 ₹55,000 Lowest | 350 ₹1,75,000 |
| 5.00 | MR-&-DMR (Not Requiring Blasting) Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in medium rock and dense medium rock Not requiring blasting | 250 | Cum | 360 ₹90,000 | 250 ₹62,500 Lowest | 250 ₹62,500 Lowest | 650 ₹1,62,500 |
| 6.00 | Dewatering Charges per hour including hire Charges for 3/5 HP Diesal Mortor with Pump | 48 | Hr | 0.09 ₹4.32 Lowest | 1 ₹48 | 200 ₹9,600 | 1 ₹48 |
| 7.00 | Providing shoring and Shuttering in foundation using wooden planks and scantling including Cost of all materials, lead,lifts, labour, etc , complete. | 286.24 | Sqm | 0.09 ₹25.76 Lowest | 1 ₹286.24 | 20 ₹5,724.8 | 1 ₹286.24 |
| 8.00 | Transport and assembling of Stub and cleat for KCR+3 | 2 | loc | 9,000 ₹18,000 | 25,000 ₹50,000 | 8,000 ₹16,000 Lowest | 20,000 ₹40,000 |
| 9.00 | Transport and assembling of Stub and cleat for QD+3 | 1 | loc | 18,000 ₹18,000 Lowest | 70,000 ₹70,000 | 18,000 ₹18,000 Lowest | 30,000 ₹30,000 |
| 10.00 | Transport and assembling of Stub and cleat for MD+3 | 1 | loc | 27,000 ₹27,000 | 80,000 ₹80,000 | 20,000 ₹20,000 Lowest | 50,000 ₹50,000 |
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
26 Mar 2026, 12:00 pmClosed
CE/TP SO/Madurai
O/o CE/TP SO/Madurai
EwE Stub setting Erection of towers LILO UDPT to Renganathapuram feeder Palani Thumbalapatti 230KVSS
2026_EB_674492_1
CE/TP SO/MDU Specn.No.034/2025-26
Open Tender
Civil Works - Others
Works
180 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.6 L
2 Jul 2026
13 Mar 2026
27 Mar 2026
13 Mar 2026
26 Mar 2026
13 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing Juliflora Jungle without uprooting including all cost of labour lead lift etc.,complete | - | Sqm | - | - |
| 2 | Conducting Check Survey and pit marking including levelling the Location including Cost of thread, nail, all lead lift etc complete. | - | LOC | - | - |
| 3 | Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Slush and Silt under water upto 0.75m depth requiring the aid of basket and vessels (SS20B) | - | Cum | - | - |
| 4 | SDR - (Not Requiring Blasting) Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Soft disintegrated rock, laterite, soft rock or kankar, Not requiring blasting. | - | Cum | - | - |
| 5 | MR-&-DMR (Not Requiring Blasting) Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in medium rock and dense medium rock Not requiring blasting | - | Cum | - | - |
| 6 | Dewatering Charges per hour including hire Charges for 3/5 HP Diesal Mortor with Pump | - | Hr | - | - |
| 7 | Providing shoring and Shuttering in foundation using wooden planks and scantling including Cost of all materials, lead,lifts, labour, etc , complete. | 286.24 | Sqm | - | - |
| 8 | Transport and assembling of Stub and cleat for KCR+3 | - | loc | - | - |
| 9 | Transport and assembling of Stub and cleat for QD+3 | - | loc | - | - |
| 10 | Transport and assembling of Stub and cleat for MD+3 | - | loc | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.19 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_810696.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .