Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Finance 2 523 GS COLONY GS COLONY WARD NO 13 NADIA WEST BENGAL 741250 | NADIA | WEST BENGAL | 741250 | +0.00% | ₹1.6 L | L1 | Admitted-Finance |
| 2 | L2₹1.6 L+₹3,923.65 (2.50%)Admitted-Finance 174 BAKSARA L M C SARANI JAMRULTALA HOWRAH WEST BENGAL 711110 | HOWRAH | WEST BENGAL | 711110 | +2.50% | ₹1.6 L+₹3,923.65 (2.50%) | L2 | Admitted-Finance |
| 3 | L3₹1.6 L+₹8,004.25 (5.10%)Admitted-Finance 159B M G ROAD HARIDEVPUR KOLKATA WEST BENGAL 700082 UDYAM WB 10 0018308 | KOLKATA | WEST BENGAL | 700082 | +5.10% | ₹1.6 L+₹8,004.25 (5.10%) | L3 | Admitted-Finance |
Tender Value
₹1.6 L
EMD Value
₹3,500
Closing Date
3 Sept 2026, 1:00 pmClosed
OFFICE OF EE(CIVIL)
THE KOLKATA MUNICIPAL CORPORATION 97 AND 98 GARFA MAIN ROAD
SUPPLY AND SPREADING SILVER SAND FOR FESTIVAL PURPOSE AT DIFFERENT PLACES IN WARD-108.
2026_KMC_1039528_1
KMC/EE(C)/BR-XII/108/26-27
Open Tender
CIVIL WORKS
Percentage
75 days
BOROUGH XII
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3,500
10 Sept 2026
26 Aug 2026
5 Sept 2026
26 Aug 2026
3 Sept 2026
26 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | MATERIALS AND LABOUR 1. Building (A) Materials delivered and stacked at site: 6)d)Silver Sand. Note: 1. The above rates are inclusive of all charges such as Royalty, Supervision Charges, etc. and also include allowance for sinkage, as applicable, and/or shrinkage and 10% Contractor?s Profit but exclusive of GST 2. Rates for Sand and Brick/ Jhama/ Bats items are complete rates at site and no other costs need to be considered. For other items, necessary loading-unloading & carriage charges are admissible. 3. Laterrite Boulder &Moorum are available in the districts as mentioned in Sl. No. ? 23 & 24 respectively, remaining districts may add necessary carriage cost as applicable. | 0.64 | M3 | 667 | ₹426.88 |
| 2 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. | - | EA | 245 | - |
| 3 | Sub Total | - | - | - | - |
| 4 | GST 18% | - | Nos. | - | - |
| 5 | CESS 1% | - | Nos. | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
BOQ_2552818.xls
BOQ • 0.27 MB
PREQUE.pdf
Additional Documents • 0.17 MB
FORM-108_02.pdf
Tender Documents • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .