Loading…
Loading…
Tender ID
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
25 Apr 2026, 6:00 pmClosed
CWE AF Gwalior
HQ CWE AF Gwalior
REPAIR/MAINT OF EOT/HOT CRANES, ANNUAL MAINTENANCE OF PASSENGERS LIFT, EARTHING/LIGHTNING PROTECTION AND CONNCETED WORKS INSIDE TECH AREA AT AF STN GWALIOR
2026_MES_754246_1
86053
Open Tender
Electrical and Maintenance Works
Item Rate
365 days
GE AF Tech Area
As per NIT and tender documents
8 documents required · 8 mandatory
₹500
GE AF Tech Area
₹90,000
Yes
25 Feb 2026
25 Feb 2026
2 May 2026
25 Feb 2026
25 Apr 2026
12 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Comprehensive maintenance and repairs of microprocessor controlled VVV frequency drive electric driven passenger lift of 750 kg carrying 10 passengers ARD facility from ground plus two floors consisting of examining, adjusting, lubricating, greasing the parts, Including replacement of connected following defective parts such as Relays, Rectifier & Indication Display, Main Contactors transformers, Brake liner & Gear oil, motor oil & servicing lubrication, Gate lock switches, Gate levers, Gate breaks, Gate track rollers, contact switches and limit switches, Floor level with switch and oscillator switch, Counter weight shoes and doors & Gate shoes, Pit Switch and safety Switches, Landing Floors indicators, Car bush Buttons and Switches and Car indicators,Car top INS penal board, Emergency Alarm buttons, Up & down Indicator Cards, Limit switches and rollers, Aluminium Brackets, Controller MCB and PF & RR, OSG Roller and Lubrication, Guide Lubrication, Auto Door sensor, Track Rollers and Linking Rolls, Door locks contact, Door lubrication and oil, OSG rope, OSG Clips & Main Rope and Xlips, Rope Tension Spring, OSG Safety Switch, RCR Coil rewinding & RCR Coil, bolt & nuts, Buffer spring,All door track rollers & Surclips, Travelling Cable, LOP & COP buttons with indicators, Door opening Buzzer, Stop Button, Door Stop Car & Landing Doors, Door screen sensor, Door screen sensor cable, PC Boards & Mother Boards, Door Opening Emergency Keys, Breaking Releasing Brake handle, Car door frame, Landing and Car door safety switch wiring cables, Door sensor cable, Door contact switches, Door opening & Closing belt, Door limit switches, Main Wheel pulley,replacement of main rope, Main brake wheel fill and etc, Main Gear bearing, Main Motor Bearing, Door Motor Rewinding/Replacing, Cabin Car Lights (LED), Exhaust Fan Rewinding and connected parts,cleaning of lifts etc any items connected to the above items will be provided by Contractor/Vendor. | 1 | Each Job | - | - |
| 1.01 | The AMC inludes Quarterly visit and breakdown attendance within 48 hrs by OEM representative and all the spares required to be replaced during the entire Contract period. Quarterly health report of the lift including replaced spares shall be submitted to duly sighned by the representative of the OEM. All the repairs to be carried out strictly by the technician of the OEM etc. complete all as directed by Engr-in - Charge. Make - Schindler
Loc - ATC
Note :- AMC period of passenger lift will be for 1 year from the date of commencement of work as per WO No. 01. | - | - | - | - |
| 2 | All as per Item No 1.00 & 1.01 here-in-before, but ground plus three floors ,600 Kg ,08 passenger lift installed at DWR complex, Make : OTIS | 1 | Each Job | - | - |
| 3 | S &F ARD system in case of mains power failure and Lift control system failure, the Lift’s own rechargeable and maintenance free battery power shall move the car to the nearest floor and the door shall open automatically for automatic rescue of passengers. A battery run-down indicator shall be providedcomplete with Battery 12volts and battery charger and make the system functional all as specified and directed. | 1 | Each | - | - |
| 4 | Supply only Battery 12 Volts 7 AH for ARD System (Make : Exide /Amaron ) | 8 | Each | - | - |
| 5Maintenance of EOT cranes of the following capacities for Nine months installed at AFS gwalior including routine maintenance check i.e. periodical services shall be carried out once in three months,attendance of unlimited break down calls & Load testing once during the contract period complete all as specified and directed by Engineer - in - Charge along with following connected acessories :- Note :-1 The EOT cranes shall be periodically (Once in three months) checked for lubrication in moving parts, oil level in the gearbox & function of mechanical parts such as brakes, limit switches, motor operation, electrical switch geras in the Panel etc all as directed by Engr-in-charge. 2.The contractor shall arrange all the inspection facilities with qualified technician as approved by GE and inspect the Crane Once in three months and carry out servicing to check worthiness of cranes and ensure periodical serivicing & maintencance checks as recommended. The electrical and+E8 mechanical spares required will be measured and paid separetely under relevant items.The record of the same is to be maintained by the Contractor. The work is including unlimited break down calls during the contract period. 3. The rate quoted is deemed to be inclusive of annual load testing in the presence of user with 10% extra load all as instructed by Eng-in-Charge.The record of the same is to be kept duly signed by the User, JE and Engr-in-Charge . Make of Sevice Provider : OEM or any other competant service provider as approved by GE. | |||||
| 5.01 | The scope of work shall include :-
Safety Check –
Checking of limit switches, Brakes, Wire rope, Wire rope clamps, Electrical
Connections, Supply voltage.
Lubrication –
Greasing of LT machinery, couplings & bearings. Oil level checking of Gear
Box, Greasing of Wire rope.
Electrical Checking –
Checking of contactors, over load relays, cleaning & tightening, electrical
connections, cable checking / tightening.
Alignment Checking –
Checking of motors & gearbox alignment for all motions.
Motor Checking –
Hoisting, CT & LT motors checking for proper current, resistance, voltages, Insulation
test.
Brake Settings –
Setting of brakes, checking of brake motor oil, checking of thruster oil, checking of
Liners / brake discs or brake shoes.
Assessment of Crane condition & preparing spares planning.
Inclusions:
1. All necessary Standard Tools and Tackles and Safety PPE for service
engineers will be arranged by Contractor. | - | - | - | - |
| 6 | Complete all as per description under srl item No. 5.00, 5.01 & 5.02 above but for EOT crane 1 Ton capacity - 03 Nos | 1 | Each Job | - | - |
| 7 | Complete all as per description under srl item No. 5.00, 5.01 & 5.02 above but for EOT crane 2 Ton capacity - 06 Nos | 1 | Each Job | - | - |
| 8 | Complete all as per description under srl item No. 5.00, 5.01 & 5.02 above but for EOT crane 5 Ton capacity - 03 Nos | 1 | Each Job | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
Tender86053.pdf
Tender Documents • 1.54 MB
BOQ_844808.xls
BOQ • 0.39 MB
Date3Extn86053.pdf
PDF • 0.11 MB
Date2Extn86053.pdf
PDF • 0.11 MB
DateExtn86053.pdf
PDF • 0.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .