Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 LAdmitted-Finance N A | FARIDABAD | HARYANA | 121004 | L1 | Admitted-Finance | ||
| 2 | L2₹2.0 L+₹19,865.12 (11.0%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
5 Sept 2026, 6:00 pmClosed
Executive Enginner REW jammu
Executive Enginner REW jammu
construction of Water Tank at Middle School, khadwani Wno.01 and Constt. Of Water Tank Mohalla Surinder Kumar, Dwarka Nath, Girdhari lal and others Wno.01 PYT. Sungal Upper Block Akhnoor For the YEar 2026-27 under APDP. ((Block Level)
2026_RDPR_322524_18
e-NIT No.503-REWJ of 2026 dated 27-08-2026
Open Tender
Civil Works
Percentage
Executive Enginner REW jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹4,000
9 Sept 2026
29 Aug 2026
7 Sept 2026
29 Aug 2026
5 Sept 2026
29 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour Engaged for site clearence, levelling etc | 4 | no | 553 | ₹2,212 |
| 2 | Earthwork in excavation by manual means in Trenches for foundations, drains,pipes,cablesetc.(not excluding 1.5min width)and for shafts,wells,cesspits and the like not exceeding 10sqm on plan, including dressing of sides and ramming of bottom lift upto 1.5m, including getting out excavated earth and disposal of surplus excavated earth as directed all kinds of soil 1m from cutting edge | 0.9 | Cum | 479.3 | ₹431.37 |
| 3 | Providing and Laying in Position cement Concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with 1:5:10 ( 1 cement:5 Coarse aggregate : 10 graded stone aggregate of 40mm nominal steel. | - | Cum | 4,826.5 | - |
| 4 | Providing and Laying in Position cement Concrete of specified grade including curing but excluding the cost of centering,shuttering, finishing and reinforcement. All work upto plinth level with 1:1.5:3 ( 1 cement:1.5 Coarse aggregate : 3 graded stone aggregate of 20mm nominal size. | - | cum | 7,788.4 | - |
| 5 | Steel Reinforcement for RCC work including straightening,cutting,bending,placing in position and binding all complete upto plinth level Thermo - Mechanically Tested Bars of grade Fe 500D or more | - | kg | 123.2 | - |
| 6 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in
foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 0.9 | m3 | 7,571.11 | ₹6,814 |
| 7 | 15 mm Cement Plaster of mix 1:6 ( 1 cement : 6 Fine sand) | - | cum | 283.8 | - |
| 8 | Centering and shuttering including strutting propping etc and removal of formwork (a) Foundation, footing and bases of column. | - | cum | 718 | - |
| 9 | (b) Edges- | - | cum | 262.3 | - |
| 10 | Providing and laying rectified Glass Ceramic floor tiles of size 300 x 300 mm or more (thickness to be specified by the manufacturer).of 1st quality conforming to IS : 15622 of approved make, laid on 20 mm thick cement mortar 1:4 (1 cement ; 4 coarse sand), including grouting the joimts with white. | 8.38 | m3 | 1,107.1 | ₹9,277.5 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
BOQ_1083878.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .