EE MDGC MUZAFFARNAGAR
EE MDGC MUZAFFARNAGAR GANGA CANAL COLONY MUZAFFARNAGAR
Rajwaha LeftMain(Sharki) ke Km 29.726 Par Purv Nirmit VRB ke PunNirman Ka Karya
2026_UPIDC_1173256_10
TN-02/EE/2026-27
Open Tender
Civil Works
Item Wise
45 days
as per tender notice
as per tender notice
2 documents required · 2 mandatory
₹854
₹35,680
30 Jul 2026
30 Jul 2026
5 Aug 2026
30 Jul 2026
5 Aug 2026
30 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantelling Brick work i/c stacking of materiail within 60 m including T & P, labour etc complete. | 26.08 | Cum | - | - |
| 2 | Dismentling of R.B.C/R.C.C. work & stacking of material within 60 mtrs including T & P, labour etc complete. | 3.61 | Cum | - | - |
| 3 | E/W in Embankment or back filling with disposal i/c lift upto 1.50 m and lead upto 1.00 k m. labour, T&P etc. complete. | 239.4 | Cum | - | - |
| 4 | Earth work in excavation in foundation in all type of soil including lift upto 1.5m and lead upto 30m, filling, watering,ramming, T&P, compaction, labour etc complete. | 75.97 | Cum | - | - |
| 5 | Providing/Laying A20,M10 (1 Cement : 3 Coarse sand: 6 grated stone aggregate) in foundation or floor including all cost of material, labour, T&P etc complete as required for proper completion of work. | 28.32 | Cum | - | - |
| 6 | Providing and Fixing steel reinforcement including cost of steel, binding wire, for R.C.C. including bending, binding and placing in position with all cost of material, T&P and labour complete. | 5.79 | M.T | - | - |
| 7 | Ordinary Centering and shuttering of C.C. including rent of shuttering material, labour and T&P required for proper completion of work for lintels, sun shades, columns & walls etc complete. | 111.4 | Sqm | - | - |
| 8 | Ordinary Centering and shuttering of R.C.C. including rent of shuttering material, labour and T&P required for proper completion of work for bridge slab, walls etc complete. | 114.38 | Sqm | - | - |
| 9 | Providing/Laying A20,M20 (1 Cement : 1.5 Coarse sand: 3 grated stone aggregate) in foundation or slab or column or beam or wall including all cost of material, labour, T&P etc complete as required for proper completion of work. | 105.43 | Cum | - | - |
| 10 | Providing/Laying A20,M25 (1 Cement : 1 Coarse sand: 2 grated stone aggregate) in foundation or slab or column or beam or wall including all cost of material, labour, T&P etc complete as required for proper completion of work. | 1.52 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.87 MB
Tendernotice_2.pdf
PDF • 1.92 MB
BOQ_2203352.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].