Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical resposnive |
| 2 | Accepted-Technical | Accepted-Technical resposnive |
| 3 | Accepted-Technical | Accepted-Technical resposnive |
Tender Value
₹46.5 L
EMD Value
₹92,900
Closing Date
8 Jun 2026, 2:00 pmClosed
Executive Engineer Irr Division Udhampur
Executive Engineer Irr Division Udhampur
Permanent Restoration of Kothu Dhanous Khul Blater Khul Mandal Barmeen Khul Langa Khul Gadena Khul Sera Laid Khul and Kandi Khul
2026_IFC_310750_10
FRESH E.NIT NO 02 OF 2026-27 DT 23/05/2026
Open Tender
Civil Works - Canal
Percentage
65 days
udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
Executive Engineer Irr DIvision Udhampur
₹92,900
Yes
17 Jun 2026
23 May 2026
9 Jun 2026
23 May 2026
8 Jun 2026
23 May 2026
23 May 2026 - 29 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PERMANENT RESTORATION OF KOTHI DHANOUS KHUL RD 0-1600M) AT PLACES | - | - | - | - |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed 1 meter from cutting edge | 62.4 | Cum | 479.3 | ₹29,908.32 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 12.6 | Cum | 5,202.9 | ₹65,556.54 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 21.6 | Cum | 5,733.6 | ₹1,23,845.76 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns | 144 | Sqm | 286.35 | ₹41,234.4 |
| 6 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete 40mm thick with 20 mm nominal size stone aggregate | 36 | Sqm | 510.25 | ₹18,369 |
| 7 | Carraige of sand from nearest source to site of work av. 70km by MT and av H.L 500m | 16.71 | Cum | 1,555.82 | ₹25,997.75 |
| 8 | Carraige of stone agg. From nearest source to site of work av. 40km by MT and av H.L 500m | 31.72 | Cum | 1,224.62 | ₹38,844.95 |
| 9 | PERMANENT RESTORATION OF BLATER KHUL RD 0-1300M) AT PLACES | - | - | - | - |
| 10 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed 1 meter from cutting edge | 69.75 | Cum | 479.3 | ₹33,431.18 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
BOQ_1005155.xls
BOQ • 0.45 MB
corr23rdR.pdf
PDF • 0.50 MB
corr02of.pdf
PDF • 0.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .