Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAdmitted-Finance 1389 17516 BESIDE RANI SATI MANDIR DHARAMSHALA PADA BELPAHAR DIST JHARSUGUDA ODISHA 768217 | JHARSUGUDA | ODISHA | 768217 | L1 | Admitted-Finance | |
| 2 | L2₹2.2 L+₹6,302.55 (3.00%)Admitted-Finance C O SIKDER P O JHANJRA JHANJRA JHANJRA 713385 WEST BENGAL INDIA | JHANJRA | PASCHIM BARDHAMAN | WEST BENGAL | 713385 | L2 | Admitted-Finance | |
| 3 | L3₹2.3 L+₹14,958.06 (7.12%)Admitted-Finance FANDANESWAR BALDER PARA PASCHIM BARDHAMAN PASCHIM WEST BARDWAN BARDHAMAN 713346 WEST BENGAL INDIA | PASCHIM BARDHAMAN | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SWAMIJI CONSTRUCTION L2 | SADHU CONSTRUCTION L3 | MAA DURGA CONSTRUCTION L1 |
|---|---|---|---|---|---|---|
| 1.00PART ATransportation & installation of one no. rope 300mtr length(19mm) at a tugger haulage for material transportation at LHCM-1 section. | ||||||
| 1.01 | Hanging of reel on frame, unwinding the rope from drum and coiling it on tub for making ready for transportation | 1 | WORK | 16,000.43 ₹16,000.43 | 16,640.45 ₹16,640.45 | 15,534.4 ₹15,534.4 Lowest |
| 1.02 | Transportation of Haulage Rope 300 Mtr. up to site (R-VIIA Seam) with the help of haulage including one pillar manually. | 1 | WORK | 37,334.34 ₹37,334.34 | 38,827.71 ₹38,827.71 | 36,246.93 ₹36,246.93 Lowest |
| 1.03 | Placing of rope, unwinding the old rope, changing of rope by new one, clamping and other necessary jobs like fitting of capple etc. | 1 | WORK | 37,334.34 ₹37,334.34 | 38,827.71 ₹38,827.71 | 36,246.93 ₹36,246.93 Lowest |
| 1.04 | Coiling of the unwinded rope, loading on tub at site, Salvaging to surface | 1 | WORK | 16,000.44 ₹16,000.44 | 16,640.46 ₹16,640.46 | 15,534.41 ₹15,534.41 Lowest |
| 2.00PART B Transportation & installation of one no. rope 350mtr length(19mm) at a tugger haulage for material transportation at LHCM-2 section. | ||||||
| 2.01 | Hanging of reel on frame, unwinding the rope from drum and coiling it on tub for making ready for transportation | 1 | WORK | 16,000.43 ₹16,000.43 | 16,640.45 ₹16,640.45 | 15,534.4 ₹15,534.4 Lowest |
| 2.02 | Transportation of Haulage Rope 350 Mtr. up to site (R-VII Seam) with the help of haulage including one pillar manually. | 1 | WORK | 37,334.34 ₹37,334.34 | 38,827.71 ₹38,827.71 | 36,246.93 ₹36,246.93 Lowest |
| 2.03 | Placing of rope, unwinding the old rope, changing of rope by new one, clamping and other necessary jobs like fitting of capple etc. | 1 | WORK | 37,334.34 ₹37,334.34 | 38,827.71 ₹38,827.71 | 36,246.93 ₹36,246.93 Lowest |
| 2.04 | Coiling of the unwinded rope, loading on tub at site, Salvaging to surface | 1 | WORK | 16,000.44 ₹16,000.44 | 16,640.46 ₹16,640.46 | 15,534.41 ₹15,534.41 Lowest |
Tender Value
₹2.5 L
EMD Value
₹3,100
Closing Date
25 Sept 2026, 11:00 amClosed
Area Engineer ENM,JHANJRA AREA
OFFICE OF THE GENERAL MANAGER, JHANJRA AREA, PO-LAUDOHA, BO, DIST. - PASCHIM BARDHAMAN, PIN-713385
Transportation and installation of two No ropes 300 Mtr and 350 Mtr each length 19mm at two Nos Tugger Haulage 59L and 20XD for material transportation at LHCM 1 and LHCM 2 Section
2026_ECL_365204_1
ECL/GM/JNR/EnM/A2/26-27/48 dated 08.09.2026
Open Tender
Miscellaneous Works
Item Rate
21 days
JHANJRA UNDERGROUND
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,100
5 Oct 2026
14 Sept 2026
26 Sept 2026
14 Sept 2026
25 Sept 2026
15 Sept 2026
14 Sept 2026 - 21 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART ATransportation & installation of one no. rope 300mtr length(19mm) at a tugger haulage for material transportation at LHCM-1 section. | |||||
| 1.01 | Hanging of reel on frame, unwinding the rope from drum and coiling it on tub for making ready for transportation | 1 | WORK | 1 | ₹1 |
| 1.02 | Transportation of Haulage Rope 300 Mtr. up to site (R-VIIA Seam) with the help of haulage including one pillar manually. | 1 | WORK | 1 | ₹1 |
| 1.03 | Placing of rope, unwinding the old rope, changing of rope by new one, clamping and other necessary jobs like fitting of capple etc. | 1 | WORK | 1 | ₹1 |
| 1.04 | Coiling of the unwinded rope, loading on tub at site, Salvaging to surface | 1 | WORK | 1 | ₹1 |
| 2PART B Transportation & installation of one no. rope 350mtr length(19mm) at a tugger haulage for material transportation at LHCM-2 section. | |||||
| 2.01 | Hanging of reel on frame, unwinding the rope from drum and coiling it on tub for making ready for transportation | 1 | WORK | 1 | ₹1 |
| 2.02 | Transportation of Haulage Rope 350 Mtr. up to site (R-VII Seam) with the help of haulage including one pillar manually. | 1 | WORK | 1 | ₹1 |
| 2.03 | Placing of rope, unwinding the old rope, changing of rope by new one, clamping and other necessary jobs like fitting of capple etc. | 1 | WORK | 1 | ₹1 |
| 2.04 | Coiling of the unwinded rope, loading on tub at site, Salvaging to surface | 1 | WORK | 1 | ₹1 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.34 MB
Tendernotice_2.pdf
PDF • 1.22 MB
BOQ_378123.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .