Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAccepted-Finance | ₹5.7 L | L1 | Accepted-Finance L1 |
| 2 | L2₹5.8 L+₹11,038.35 (1.94%)Rejected-Finance | ₹5.8 L+₹11,038.35 (1.94%) | L2 | Rejected-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-condition not fulfilled |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-condition not fulfilled |
| 5 | Not Admitted-Fee/PreQual/Technical 0 322230 | KARAULI | RAJASTHAN | 322230 | - | - | Not Admitted-Fee/PreQual/Technical Others-condition not fulfilled |
Tender Value
₹5.5 L
EMD Value
₹11,040
Closing Date
12 Jun 2026, 1:00 pmClosed
EXECUTIVE OFFICER
nagar palika bardoda mev
Construction of an RCC shed at the cremation ground in Chaulai ka Bas.
2026_DLB_565848_1
npb/771
Open Tender
Civil Works
Percentage
90 days
nagar palika bardoda mev
Please refer Tender documents
2 documents required · 2 mandatory
₹500
EO, MDRISL
₹11,040
Yes
19 Jun 2026
8 Jun 2026
12 Jun 2026
8 Jun 2026
12 Jun 2026
8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including
dressing of sides and ramming of bottoms, including getting out the
excavated material, refilling after laying pipe/ foundation and
disposal of surplus excavated material at a lead upto 50m suitable
site as per direction of Engineer for following depths, below natural
ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt,
clay, black cotton soil, kankar, etc.Depth upto 1.5 m | 17.64 | Nos | 229.5 | ₹4,048.38 |
| 2 | Providing and laying in position cement concrete of specified grade
excluding the cost of centring and shuttering - All work upto plinth
level :1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40
mm nominal size). | 4.55 | Nos | 4,575 | ₹20,816.25 |
| 3 | Providing and laying in position cement concrete of specified grade
excluding the cost of centring and shuttering - All work upto plinth
level :1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20
mm nominal size). | 4.2 | Nos | 5,910 | ₹24,822 |
| 4 | Providing and laying in position specified grade of reinforced cement
concrete excluding the cost of centring, shuttering, finishing and
reinforcement - All work upto plinth level :1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20
mm nominal size) | 16.29 | Nos | 6,340 | ₹1,03,278.6 |
| 5 | Random rubble masonry with hard stone in foundation and plinth :Cement mortar 1:6 (1 cement : 6 coarse sand) | 14.96 | Nos | 4,860 | ₹72,705.6 |
| 6 | Reinforcement for R.C.C. work at all levels including straightening,
cutting, bending, placing in position and binding all complete.Thermo-Mechanically Treated bars. | 1,629 | Nos | 83.3 | ₹1,35,695.7 |
| 7 | Centring and shuttering with plywood or steel sheet upto two stories
( each story of height upto 3.5 metre from floor level) including
strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete. | 133.05 | Nos | 236.5 | ₹31,466.33 |
| 8 | Brick work with FPS bricks of class designation 75 in foundation
and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) | 6.31 | Nos | 5,400 | ₹34,074 |
| 9 | Cement plastering including T&P, scaffolding, material and complete
labour, including cost of water, curing, racking of joints etc. with 12
mm cement plaster of mix : including Providing /mixing of synthetic
fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm
length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per
50 kg Cement up to 900 gms per cum of Concrete/ mortar1:4 (1 cement : 4 fine/ coarse sand) | 225.8 | Nos | 227 | ₹51,256.6 |
| 10 | Distempering with 1st quality acrylic washable distemper (ready
mixed) of approved manufacturer and of required shade and colour
complete. as per manufacturer's specification.Two or more coats on new work. | 225.8 | Nos | 77.9 | ₹17,589.82 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
nitcholaikabas.pdf
Tender Documents • 1.19 MB
BOQ_1006849.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .